The preferred Air Force base distribution system is | show 🗑
|
||||
A substation with one incoming transmission circuit and three outgoing distribution cirdcuits has (at least) how many lighting arresters? | show 🗑
|
||||
show | batteries
🗑
|
||||
What is the configuration of an induction-voltage regulator's primary and secondary windings? | show 🗑
|
||||
In regards tko the circuit, how are a step-voltage regulator's primary and secondary windings configured? | show 🗑
|
||||
When can the secondary of a current transformer be opened? | show 🗑
|
||||
Which is not a major funtion of an oil circuit breaker? | show 🗑
|
||||
What oil circuit breaker components supply amperage to the protective relays? | show 🗑
|
||||
show | 95 percent
🗑
|
||||
Of these devices, which does not interrupt a fault current? | show 🗑
|
||||
Air-break switches can be used to break a circuit "under load" if they have | show 🗑
|
||||
Why is the arc extinguished so quickly in a vacuum recloser? | show 🗑
|
||||
The insulating quality of sulfur hexafluoride (SF6), at 0 PSI, is how much greater than dry air? | show 🗑
|
||||
A high voltage switch is connected to the distribution system that it is protecting in | show 🗑
|
||||
What is usually installed with an oil circuit breaker to allow for equipment maintenance, letting you keep the circuit in operation? | show 🗑
|
||||
show | replaced
🗑
|
||||
show | every 6 months
🗑
|
||||
Which of these acids mixed with water is an effective solution for cleaning insulators and bushings? | show 🗑
|
||||
show | cloth or light sanding
🗑
|
||||
show | opening and closing the switch several times
🗑
|
||||
Battery bank maintenance is normally done | show 🗑
|
||||
show | hydrometer syringe
🗑
|
||||
What must you do if you add water to a battery in freezing temperatures? | show 🗑
|
||||
The dielectric test voltage for a relay that is rated at 600 volts is | show 🗑
|
||||
show | proper operations
🗑
|
||||
show | 4 years
🗑
|
||||
What device is essentially a voltage regulator and requires similair servicing? | show 🗑
|
||||
What is the first step in isolating a voltage regulator? | show 🗑
|
||||
For each degree below 77 F, battery capacity is reduced by what percent? | show 🗑
|
||||
show | make a complete performace test
🗑
|
||||
show | megger
🗑
|
||||
show | shorted
🗑
|
||||
What publication outlines how to perform a flash hazard analysis to determine personal protective equipiment requirement? | show 🗑
|
||||
Hard hats must meet ANSI 289.1 Class E requirements 20,000 VAC test for how many minutes? | show 🗑
|
||||
show | coveralls worn with sleeves rolled down
🗑
|
||||
show | every 6 months
🗑
|
||||
Which of these is used for a bending test on a body belt or safety strap? | show 🗑
|
||||
Which of these is not a way to tell whether gaffs are sharpened properly? | show 🗑
|
||||
show | flat inner side
🗑
|
||||
show | left arm raises as left foot rises
🗑
|
||||
show | annually
🗑
|
||||
Leather protectors or gauntlets should be | show 🗑
|
||||
show | worn tucked into rubber gloves
🗑
|
||||
Which of these combinations are likely to use inside rubber gloves? | show 🗑
|
||||
show | every 6 months
🗑
|
||||
The supervisor must inspect rubber blankets visually every | show 🗑
|
||||
show | flat or rolled in blanket canister
🗑
|
||||
Which of the following manufacturer's certification test is acceptable for hotsticks? | show 🗑
|
||||
show | every 6 months
🗑
|
||||
Test hot sticks electrically with a | show 🗑
|
||||
show | 4 one-foot segment tests and one overall test
🗑
|
||||
At the job site, the aerial lift device should be positioned so the work area is always | show 🗑
|
||||
While raising the bucket, the operator should always face in the direction | show 🗑
|
||||
Materials or tools can only be passed from a worker on the ground to a worker on the aerial lift vehicle when | show 🗑
|
||||
show | pretest inspection and periodic verification test
🗑
|
||||
show | upper boom insulation test
🗑
|
||||
show | principal operator
🗑
|
||||
show | through the power takeoff
🗑
|
||||
When you must work on a slope, position the truck so the work is | show 🗑
|
||||
How is the rope put on the capstan? | show 🗑
|
||||
show | stop all action
🗑
|
||||
show | All signals are approved by the Air Force
🗑
|
||||
Which of these is the Operator's Inspection Guide and Trouble Report on which you write up line truck inspection discrepancies? | show 🗑
|
||||
show | tire change
🗑
|
||||
show | tachometer
🗑
|
||||
In addition to engineers or the planning Section, who assists in making a "staking sheet" of the area over whick the line is to pass? | show 🗑
|
||||
Use AF Forsm 103, Base CE work clearance request for | show 🗑
|
||||
For poles that are subject to more strain than normal, how many inches deeper do we set them? | show 🗑
|
||||
What method do we use to remove dirt from a power auger? | show 🗑
|
||||
What is the minimum number of workers needed for pole handleing? | show 🗑
|
||||
show | cant hook
🗑
|
||||
Sort a large number of poles to be stored by | show 🗑
|
||||
What method do we usually use to load poles on a trailer? | show 🗑
|
||||
show | 6 foot
🗑
|
||||
show | slant
🗑
|
||||
show | find the pole's face side and back side
🗑
|
||||
show | face side of the pole
🗑
|
||||
In using the line truck and winch to set a pole, attach the winch line before you raise the pole slightly | show 🗑
|
||||
show | rubber gloves and a pole gaurd
🗑
|
||||
show | one shoveler and 3 tampers
🗑
|
||||
What is the maximum amount of pole line angle you can have without needing a guy wire? | show 🗑
|
||||
What type of anchor do we use for hard or compact soil? | show 🗑
|
||||
show | side guy
🗑
|
||||
Which of these combinations fo you use to draw up a guy wire and hold it in place for attachment to the anchor rod? | show 🗑
|
||||
show | longitudinal traverse and vertical loading
🗑
|
||||
show | fiberglass
🗑
|
||||
show | half hitch ad a clove hitch
🗑
|
||||
show | aluminum conductors
🗑
|
||||
You are building a new pole line; which onductor does the person on the ground send up first is you are on the second pole | show 🗑
|
||||
With what splice do you have to choose the correct size die? | show 🗑
|
||||
show | use a stirrup
🗑
|
||||
show | span length, conductor type, temperature and loading district
🗑
|
||||
show | susspension insulator
🗑
|
||||
pad mount transformers is the perferred mounting method for what transformer size? | show 🗑
|
||||
Which method do we most likely use to install, single-phase transformer? | show 🗑
|
||||
Where do you connect the top and bottom connection points of a transformer's lighting arrestor? | show 🗑
|
||||
show | large induction load in the circuit
🗑
|
||||
What can we install to raise the power factor in a distribution circuit? | show 🗑
|
||||
What device do we use across a capacitor's terminals to gradually discharge the capacitor? | show 🗑
|
||||
For a below-ground check of a pole, to what depth do you dig the trench? | show 🗑
|
||||
At what location on a crossarm does decay usually start? | show 🗑
|
||||
What condition can cause a crossarm to twist? | show 🗑
|
||||
When a span shows too much sag while adjacent spans appear normal, | show 🗑
|
||||
show | 4 times per year
🗑
|
||||
show | lean it against a tree limb
🗑
|
||||
To remove a limb, where do you make the last cut? | show 🗑
|
||||
Which device can you use to detect a problem before service is interrupted? | show 🗑
|
||||
show | test and ground the lines
🗑
|
||||
show | 600-volts insulated rubber or synthetic-covered flexible copper
🗑
|
||||
The first connection you make in applying a ground set is the | show 🗑
|
||||
What a break occurs in an energized line, how is the line at the break affected? | show 🗑
|
||||
When you replace an arrestor that has been damaged by storke of lighting, what do you also check for damaged? | show 🗑
|
||||
show | inspect hot line tools and equipment for proper operation
🗑
|
||||
What two connector types do we use when splicing energized conductors? | show 🗑
|
||||
show | prevents the tie wire from contacting other phases
🗑
|
||||
show | rotary blade
🗑
|
||||
What do we use to raise the auxiliary crossarm assembly once we untie the tie wires? | show 🗑
|
||||
show | 8
🗑
|
||||
show | 3 to 4 feet
🗑
|
||||
The high voltage audible indicator makes an audible sound when placed | show 🗑
|
||||
The act of tying a tagline to each outside conductor with a bowline knot and pulling the conductors out of the work area we call | show 🗑
|
||||
show | lineman's safety strap
🗑
|
||||
show | kW- hours
🗑
|
||||
show | new reading minus the previous reading
🗑
|
Review the information in the table. When you are ready to quiz yourself you can hide individual columns or the entire table. Then you can click on the empty cells to reveal the answer. Try to recall what will be displayed before clicking the empty cell.
To hide a column, click on the column name.
To hide the entire table, click on the "Hide All" button.
You may also shuffle the rows of the table by clicking on the "Shuffle" button.
Or sort by any of the columns using the down arrow next to any column heading.
If you know all the data on any row, you can temporarily remove it by tapping the trash can to the right of the row.
To hide a column, click on the column name.
To hide the entire table, click on the "Hide All" button.
You may also shuffle the rows of the table by clicking on the "Shuffle" button.
Or sort by any of the columns using the down arrow next to any column heading.
If you know all the data on any row, you can temporarily remove it by tapping the trash can to the right of the row.
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.
Normal Size Small Size show me how
Normal Size Small Size show me how
Created by:
melissafish
Popular Military sets