ET1 EOCT
Quiz yourself by thinking what should be in
each of the black spaces below before clicking
on it to display the answer.
Help!
|
|
||||
---|---|---|---|---|---|
show | Equipment Tag-Out Procedures
COMDTINST 9077.1
🗑
|
||||
show | OSHA regulations
🗑
|
||||
Who is responsible for ensuring that checks and audits of all tag-outs are performed one every two weeks? | show 🗑
|
||||
show | once every two weeks
🗑
|
||||
Where should you the annotation when replacing a damage or missing DANGER/CAUTION tag? | show 🗑
|
||||
show | 6 months
🗑
|
||||
When does tag numbering start each year? | show 🗑
|
||||
Who assigns you a username, password, and sets permission to your CMPlus account? | show 🗑
|
||||
show | Contact OSC
🗑
|
||||
show | OSC
🗑
|
||||
show | Supply Policies and Procedures Manual
🗑
|
||||
show | DOD Owned and CG Owned
🗑
|
||||
What is the cognizant symbol for DOD owned DLR items? | show 🗑
|
||||
What is the cognizant symbol for CG owned DLR items? | show 🗑
|
||||
show | Military Standard Requisitioning and Issue Procedures
🗑
|
||||
How long do requisitioners have to respond to DLR follow-ups? | show 🗑
|
||||
show | within 48 hours of receipt of replacement item
🗑
|
||||
Units shall track unserviceable DLR via____? | show 🗑
|
||||
show | Reparability Codes
🗑
|
||||
show | Cognizant Codes
🗑
|
||||
show | Activity Codes
🗑
|
||||
show | MILSMaterial Control Codes
🗑
|
||||
show | enclosure D or COMDTINST M4400.19
🗑
|
||||
show | Standard price and Net price
🗑
|
||||
show | CMPlus MILSTRIP Format(not CASREPS)
CASREP Messages in MILSTRIP format
Fleet Logisitic Support (FLS)
🗑
|
||||
show | Caution labels
Unserviceable Item Tags
Unserviceable Item Labels
🗑
|
||||
What three places can a unit ship a NRFI DLR item? | show 🗑
|
||||
show | Not Ready For Issue
🗑
|
||||
What are the three methods of shipping a DLR item? | show 🗑
|
||||
show | Priority 3 and Priority 6
🗑
|
||||
What priority items shall be shipped via certified mall? | show 🗑
|
||||
show | identify the unserviceable assets and need for replacement
submit a requisition and FTA electronically through DAAS
🗑
|
||||
show | Primary Inventory Control Activity
🗑
|
||||
show | establish stock record accounting
issue serviceable item
direct the unit to return unserviceable carcass within 10 days
🗑
|
||||
After receipt of the replacement part the unit shall... | show 🗑
|
||||
show | BC1
🗑
|
||||
show | 45th day
🗑
|
||||
show | 75th day
🗑
|
||||
show | Man-Made
Natural
Inherent
🗑
|
||||
show | narrowband
broadband
🗑
|
||||
This interference impedes the reliable and efficient use of electrical and electronic equipment. | show 🗑
|
||||
show | By tuning the susceptible receiver away from an interfering narrowband signal
🗑
|
||||
show | overdriven amplifiers
Frequency multiplier stages
modulator noise
intermodulation/ cross modulation
sideband splatter
🗑
|
||||
show | Arcing in PA stage, waveguide rotary joint or antenna
🗑
|
||||
What are the most common source of EMI? | show 🗑
|
||||
How is Rotating electrical machinery interference generated? | show 🗑
|
||||
show | DC generators
🗑
|
||||
This Interference is caused by electrical storms, snowstorms, rain particles, or interstellar radiation | show 🗑
|
||||
show | Thermal agitation of electrons in the circuit resistance.
🗑
|
||||
Interference is transferred from an interfering source to the affected equipment by what two methods? | show 🗑
|
||||
Involves the transfer of undesired energy through conductors between a source of interference and a susceptible device. | show 🗑
|
||||
What are the most common paths for conduction currents? | show 🗑
|
||||
show | Type of circuit
Frequencies
power
capacitive and inductive coupling between parts of circuit
🗑
|
||||
How can you prevent Broadband Emissions? | show 🗑
|
||||
show | Spurious Sidebands (splatter)
🗑
|
||||
show | must be at least 60db below the fundamental
🗑
|
||||
show | must be at least 80db below the fundamental
🗑
|
||||
show | Parasitic oscillations
🗑
|
||||
The Effect of _______ is similar to atmoshperic noise. | show 🗑
|
||||
Is the transfer of modulation from one carrier to another | show 🗑
|
||||
show | Intermodulation
🗑
|
||||
show | yes
🗑
|
||||
What is a common way to prevent cross and intermodulation? | show 🗑
|
||||
show | Linear intrusion, Nonlinear intrusion, Intrusion through ports not intended for signal path
🗑
|
||||
show | Thermal noise, Shot noise, Galactic noise, Solar noise, Atmospheric noise
🗑
|
||||
Typical man-made noise sources are: | show 🗑
|
||||
How can you reduce Broadband noise? | show 🗑
|
||||
show | White noise
🗑
|
||||
show | Co-channel interference
🗑
|
||||
Why is Co-channel interference greater than any other interference? | show 🗑
|
||||
show | Image Frequency Interference
🗑
|
||||
To reduce this type of Interference insert a series,or parallel- resonant circuit, tuned to the susceptible frequency in the RF stage. | show 🗑
|
||||
show | The penetration of unwanted signals that are centered a any pass frequency within the receiver
🗑
|
||||
show | Non-linear intrusion
🗑
|
||||
occur when unwanting mixing takes place in nonlinear elements external to the receiver | show 🗑
|
||||
Why is Hull-generated interference a major problem on ships? | show 🗑
|
||||
radio interference due to interactions with dirty connections or corroded parts | show 🗑
|
||||
What are the major causes of corrosion? | show 🗑
|
||||
show | Current must flow
🗑
|
||||
The breakdown of a protective film on te metals caused by bending and vibration results in this corrosion | show 🗑
|
||||
How can you eliminate crevice corrosion? | show 🗑
|
||||
Occurs when internally or externally stressed metals are exposed to a corrosive environment | show 🗑
|
||||
What is the output of Heterodyning | show 🗑
|
||||
To combine (a radio-frequency wave) with a locally generated wave of different frequency in order to produce a new frequency equal to the sum or difference of the two is known as what? | show 🗑
|
||||
show | Loose metallic items ,Corroded stanchions and metallic life lines,Rusty anchors Rusty chains, Metallic safety net, chains, cables
🗑
|
||||
Radar systems can create interference in what ways? | show 🗑
|
||||
show | Discoloration in the wave guide hot spots on the wave guide VSWR Checks
🗑
|
||||
show | Dirt Degeration, Misalignent
🗑
|
||||
show | running rabbits
🗑
|
||||
show | Direct and Indirect
🗑
|
||||
achieved by direct metal-to-metal contact between two meal items trough he process of weldng and bonding | show 🗑
|
||||
Achieved by the use of a bonding jumper or bots between two metals | show 🗑
|
||||
this EMI reduction technique is a means of decoupling and reducing interaction between equipment | show 🗑
|
||||
Metal-to Metal contact must be maintained by a pressure of approximately_____ psi | show 🗑
|
||||
This EMI reduction technique is a combination of circuit components designed to pass currents at certain frequencies | show 🗑
|
||||
show | twice
🗑
|
||||
show | Voltage rating, Operating frequency, Voltage drop, maximum amient temperatures, attenuation,minimum filter life, circuit requirements
🗑
|
||||
show | Active, Passive, Susceptible
🗑
|
||||
show | 18",18" 18"
🗑
|
||||
What is the minimum seperation requirements when placing a PASSIVE cable near an active, passive or susceptible cable? | show 🗑
|
||||
show | 18", 2", none
🗑
|
||||
show | TRUE
🗑
|
||||
TRUE OR FALSE: cables carrying audio frequency can begrouped together | show 🗑
|
||||
TRUE OR FALSE: Coaxial cables shoud be routed separatey fom all other cables such as control cables | show 🗑
|
||||
TRUE OR FALSE: Unshielded antenna transmission lines should be routed in the shortest most direct route and close to other antenna cabling | show 🗑
|
||||
Which of the following choices is not a type of EMI? man-made, Inherent, Unnatural, Natural | show 🗑
|
||||
show | Cross Modulation
🗑
|
||||
What is the generation of numerous new frequencies from twoor more signals called? | show 🗑
|
||||
show | Any USCG Cutter, Barge or Boat
🗑
|
||||
TCTO's shall be initiated by submitting a ____ with an attached draft TCTO | show 🗑
|
||||
show | When the TCTO proposes an improvement in assest operational capability
🗑
|
||||
WHat is the definition of "change of form"? | show 🗑
|
||||
Whatis an Operational Requirement Document (ORD)? | show 🗑
|
||||
show | Body
🗑
|
||||
Field Change furnishes a field change part kit required to complete the change. Also requires unit to complete alterations and add changes to technical documentation | show 🗑
|
||||
show | Activity control number, field change bulletin, installation procedures, parts and special tools
🗑
|
||||
Field Change that furnishes documentation only. Also requires unit to procure parts, complete alterations, add changes to tech documentations | show 🗑
|
||||
Field change that furnihes documentation, some parts and some tools. | show 🗑
|
||||
Field change implements changes to technical documentation only | show 🗑
|
||||
Who notifies the activity supervisor that a field change package is being delivered and provides shipping number for tracking? | show 🗑
|
||||
Who verifies the appicability of the field changes in the CGPMS Work Schedue Book? | show 🗑
|
||||
Who can complete a field change? | show 🗑
|
||||
show | OPNAV 4790 C/K
🗑
|
||||
show | TRUE
🗑
|
||||
Who has final approving authority for implementing an emergency alteration? | show 🗑
|
||||
OPNAV 4790 C/K are submitted to who? | show 🗑
|
||||
show | Emergency situations, Urgent situations
🗑
|
||||
Who can authorize an urgent alteration? | show 🗑
|
||||
A procedure not formerly documented that is useful in servicing electronic equipment but does not change the configuration | show 🗑
|
||||
Net life cycle savings the the government of more than _____will assign an urgent priority to a field change | show 🗑
|
||||
"Depot change" field change is_____ interchangeable and requires mainframe wiring or component changes | show 🗑
|
||||
Navy-type field changes initiated by the Navy begin with ____? | show 🗑
|
||||
show | 91
🗑
|
||||
A Number issued by the ELC | show 🗑
|
||||
show | Engineering Logistic Center (elc) (code 016) or Commandnt
🗑
|
||||
show | TRUE
🗑
|
||||
ELC is also known as CODE___ | show 🗑
|
||||
Units forward information concerning a change to commercial equipment not previously published or authorized to who? | show 🗑
|
||||
What documentation is required for completed field changes? | show 🗑
|
||||
show | Errata Sheet
🗑
|
||||
Field changes issued directly by a commericial manufacturer are___ | show 🗑
|
||||
When should units use Local PMS? | show 🗑
|
||||
show | CO
🗑
|
||||
show | ALMIS
🗑
|
||||
Who is responsibl for reviewing FBRs? | show 🗑
|
||||
Who can approve LPMS for equipment? | show 🗑
|
||||
show | Asset Computerizd Management System
🗑
|
||||
If any deficiencies are discovered with in the publication for modernized assets, wht should be completed? | show 🗑
|
||||
Man hours on an almis MPC should be rounded to the nearest____ | show 🗑
|
||||
A Document that provides the necesary steps to perform the required procedures | show 🗑
|
||||
What goes in the Technician ID block on an ALMIS MPC? | show 🗑
|
||||
What is the maintenance schedule in ALMIS called? | show 🗑
|
||||
What is CG-5453 | show 🗑
|
||||
show | LPMS Monthly schedule
🗑
|
||||
show | Send a letter, OPNAV 4790 C/K to CO, NAVSEA, CODE 914
🗑
|
||||
How do you track NPMS | show 🗑
|
||||
What do you use NPMS for? | show 🗑
|
||||
Where can you find more details on ordering NPMS materials? | show 🗑
|
||||
What document contains all available CGPMS procedures and all Navy maintenance Idex of Procedures( MIP) for Navy equipment usedby the CG? | show 🗑
|
||||
show | List of Effective IMPs
🗑
|
||||
show | as needed basis
🗑
|
||||
How can the CGPMS Guide be ordered? | show 🗑
|
||||
What is the supply policy and procedures manual number? | show 🗑
|
||||
show | COMDINST M10550.25
🗑
|
||||
What is equipment tag-out procedures manual? | show 🗑
|
||||
What is the Navy Ships Maintenance and Material Management Manual number? | show 🗑
|
||||
What is the Ordanance Manual number? | show 🗑
|
||||
What is the name of the index of all applicable MPCs for a given piece of equipment or system? | show 🗑
|
||||
show | Maintenance Procedure Card (MPC)
🗑
|
||||
show | CGPMS User Guide
🗑
|
||||
show | EMO
🗑
|
||||
Who ensures CGPMS is in the unit's training schedule? | show 🗑
|
||||
show | EMO
🗑
|
||||
Who reviews and inspects CGPMS work schedules to ensure they are current and complete? | show 🗑
|
||||
Who maintains the CGPMS work Schedule Books( WSBs) | show 🗑
|
||||
show | Electronics Maintenance Officer
🗑
|
||||
If the unit does not have an EMOwho assumes the appropriate duties of the EMO? | show 🗑
|
||||
show | Senior Technician
🗑
|
||||
Who maintains a current CGPMS Library? | show 🗑
|
||||
Who initiaites requests for CGPMS revision using FBRs? | show 🗑
|
||||
Who incorporates CGPMS into the unit's training schedule? | show 🗑
|
||||
show | Senior Technician
🗑
|
||||
Who ensures appropriate support facility maintains unitPMS if an ET is not assigned? | show 🗑
|
||||
show | Unit CO or OinC
🗑
|
||||
Who requests required waivers of compliance from proper authority? | show 🗑
|
||||
show | Feedback report
🗑
|
||||
A test or battery of tests that verifies that the installed or modified equipment, systems, interfaces with exsiting systems are properly installed and operates as intended at the platfomr specific location and environment | show 🗑
|
||||
show | Platform Witness
🗑
|
||||
show | observe an verify: required test,results, discrepancies found, and verify test completion
🗑
|
||||
This section of a SOVT introduces and summarizes the SOVT document | show 🗑
|
||||
show | Inspection and Validation Tests, Section 2
🗑
|
||||
Where are the results of an SOVT Audit recorded? | show 🗑
|
||||
show | Cold checks, Section 3
🗑
|
||||
This section provides "off-line" testing procedures that determine if individual equpment performs within the execpted performance parameters. | show 🗑
|
||||
show | Isolation
🗑
|
||||
This section of a SOVT provides procedures for testing within a single system. | show 🗑
|
||||
show | Introduction and Administration
🗑
|
||||
Section 2 of a SOVT | show 🗑
|
||||
show | COld Checks
🗑
|
||||
show | Equipment Tests
🗑
|
||||
Section 5 of a SOVT | show 🗑
|
||||
show | Inter-System Tests
🗑
|
||||
This section provides procedures that test the functionality and interfaces between the installed or changed system | show 🗑
|
||||
show | Operational Tests
🗑
|
||||
Section 8 of a SOVT | show 🗑
|
||||
This section of a SOVT provides procedures that cutover the newly installed or upgraded system to an "on-line" status and test functions that couldn't be tested "off-line". | show 🗑
|
||||
This section provides procedures that are specifically aimed at conductinga tes or a series of test in a rea time "at-sea" scenario. | show 🗑
|
||||
show | Appendix
🗑
|
||||
show | a completed or executed SOVT plan that has been witnessed and signed, with all test results and any descrepancies recorded
🗑
|
||||
show | System Operation and Verification Test
🗑
|
||||
Consist of a network of earth electrode rods, plates, mats, or rids and thier interconnecting conductors. | show 🗑
|
||||
What components make up an earth electrode subsystem? | show 🗑
|
||||
What is the most common type of ground rods? | show 🗑
|
||||
show | 10ft long by 3/4in. diameter
🗑
|
||||
The metal framework of a building may exhibit a resistance to the earth of less than ____ | show 🗑
|
||||
Shipboard ground planes are used to provide a ground in _____ | show 🗑
|
||||
show | Bonds
🗑
|
||||
show | Welding of metallic surfaces
🗑
|
||||
Class B Bond | show 🗑
|
||||
show | Bridging using a metallic(conductive)strap
🗑
|
||||
show | MIL-STD-131G (Navy)
🗑
|
||||
DC resistance across bonding and grounding junctions shall not exceed ____ | show 🗑
|
||||
RF impedence across bonding and grounding junctions shallnot exceed ____ at ______ | show 🗑
|
||||
All class___ extenstions to the ship's ground potential shall be designated as the ship's ground plane | show 🗑
|
||||
show | earth Electrode Subsystems
🗑
|
||||
Components of a fault protection subsystem include: | show 🗑
|
||||
Provides a low impedance path to ground y interconnecting all equipment to the facility's earth electrode subsystem using grounding conductors | show 🗑
|
||||
show | green
🗑
|
||||
What metals are resistant to corrosive conditions? | show 🗑
|
||||
Types of grounding electrode conductors may be: | show 🗑
|
||||
show | fuses, circuit breakers, ground fault sensors, ground fault circuit interrupters
🗑
|
||||
show | ground fault circuit interrupters
🗑
|
||||
show | series
🗑
|
||||
show | Circuit breakers
🗑
|
||||
show | Ground Fault Sensors
🗑
|
||||
show | GFCI
🗑
|
||||
show | 120 volts
🗑
|
||||
What are the five effects of lightning? | show 🗑
|
||||
show | air terminals, down conductors, ground rods
🗑
|
||||
show | 10 inches
🗑
|
||||
What does FDVS stand for? | show 🗑
|
||||
A Zoom lens must be mounted on a ___ mechanism | show 🗑
|
||||
show | 1/4
🗑
|
||||
What are the requirements of the second camera used in FDVS? | show 🗑
|
||||
FDVS must meet the requirements outlined in what manual? | show 🗑
|
||||
show | Shipboard Helicopter Operations Facility Certification Program.
🗑
|
||||
show | LUX
🗑
|
||||
show | .95
🗑
|
||||
show | .0003
🗑
|
||||
Low Light Level for training purposes is less than___ | show 🗑
|
||||
Who established the Lux requiremtns for FDVS? | show 🗑
|
||||
FDVS must meet a forecasted life cycle of __ years | show 🗑
|
||||
show | pink
🗑
|
||||
Camera housing is pressurized with ___psi of dry nitrogen | show 🗑
|
||||
show | NEMA-6 weatherproof
🗑
|
||||
What is needed for the zoom or wide-angle camera to function properly? | show 🗑
|
||||
show | Current off the shelf
🗑
|
||||
Who supports FDVS? | show 🗑
|
||||
Repair of FDVS is completed at ___ level | show 🗑
|
||||
What is the Depot Level repair center for FDVS | show 🗑
|
||||
This platform has FDVS signals going through PASSIVE switches for monitoring at the HCS from various camera locations | show 🗑
|
||||
show | 378' WHEC
🗑
|
||||
This platform has FDVS signals passing through a VIDEO DISTRIBUTION AMPLIFIERS, video cassette recorders and SCCS | show 🗑
|
||||
This platform has FDVS signals passing through 24-HOUR TIME LASPSE video recorder | show 🗑
|
||||
show | half
🗑
|
||||
show | Lightning Protection Code
🗑
|
||||
show | Nation Fire Prevention Association
🗑
|
||||
To protect a structure, such as a building, vessel, mast, etc... from lightning damage, the grounding cable should be ____ AWG | show 🗑
|
||||
If a building has a SLOPING ROOF, then the air terminal placement should be.... | show 🗑
|
||||
The maximum DC resistance shall not be greater than ___ ohms per 1000ft when down conductors are less than 75 ft. | show 🗑
|
||||
The maximum DC resistance shall not be greater than ____ ohms per 1000ft when down conductors are greater than 75ft. | show 🗑
|
||||
How frequently does Lightning protection subsystem need to be visually inspected? | show 🗑
|
||||
How frequently does Lightning protection subsystem need to be mechanically inspected? | show 🗑
|
||||
show | prevents noise from being conductively coupled
🗑
|
||||
DC resistance across bonding and grounding junctions shall not exceed ___ ohms. | show 🗑
|
||||
show | MIL-STD-188-124B, NEC documentation, MIL-HDBK-419
🗑
|
||||
What is the recommended frequency used in a single point ground configuration? | show 🗑
|
||||
What are the three systems that use a signal reference grounding system? | show 🗑
|
||||
show | Floating, Single-point, Multi-point
🗑
|
||||
show | Multi-point(equipotential)
🗑
|
Review the information in the table. When you are ready to quiz yourself you can hide individual columns or the entire table. Then you can click on the empty cells to reveal the answer. Try to recall what will be displayed before clicking the empty cell.
To hide a column, click on the column name.
To hide the entire table, click on the "Hide All" button.
You may also shuffle the rows of the table by clicking on the "Shuffle" button.
Or sort by any of the columns using the down arrow next to any column heading.
If you know all the data on any row, you can temporarily remove it by tapping the trash can to the right of the row.
To hide a column, click on the column name.
To hide the entire table, click on the "Hide All" button.
You may also shuffle the rows of the table by clicking on the "Shuffle" button.
Or sort by any of the columns using the down arrow next to any column heading.
If you know all the data on any row, you can temporarily remove it by tapping the trash can to the right of the row.
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.
Normal Size Small Size show me how
Normal Size Small Size show me how
Created by:
deleted user
Popular Military sets