click below
click below
Normal Size Small Size show me how
HAZMAT Tech 2 -Chart
Question | Answer |
---|---|
ways to “Change Applied Stress” are: | Move stressor. Move stressed system. Shield stressed system. |
ways to “Change Breach Size” are: | Chill contents. Limit stress levels. Activate venting devices. Mechanical repair. |
Four ways to “Change Quantity Released” are: | Change container position. Minimize pressure differential. Cap off breach. Remove contents. |
ways to “Change Size of the Danger Zone” are: | Barriers. Adsorbents. Absorbents. Diluents. Reactants. Overpack. |
ways to “Change Exposures Contacted” are: | Provide sheltering. Begin Evacuation. PPE. |
ways to “Change Severity of Harm” are: | Rinse off contamination. Increase distance from source. Provide shielding. Provide prompt medical attention. |
Move stressor. Move stressed system. Shield stressed system. Are all : | ways to “Change Applied Stress” |
Chill contents. Limit stress levels. Activate venting devices. Mechanical repair. Are all : | ways to “Change Breach Size” |
Change container position. Minimize pressure differential. Cap off breach. Remove contents. Are all : | ways to “Change Quantity Released” |
Barriers. Adsorbents. Absorbents. Diluents. Reactants. Overpack. Are all : | ways to “Change Size of the Danger Zone” |
Provide sheltering. Begin Evacuation. PPE. Are all : | ways to “Change Exposures Contacted” |
Rinse off contamination. Increase distance from source. Provide shielding. Provide prompt medical attention. Are all : | ways to “Change Severity of Harm” |