click below
click below
Normal Size Small Size show me how
Module F (Quizlet 8)
Technical Escort - CRT Operations
Question | Answer |
---|---|
Considerations for establishing a decon site? | Be free of contamination, be free of hazards, be a flat surface or run off towards the clean line is avoided and allow for parallel transload and casualty lane set-up |
What are the 3 basic tasks of PDS? | Gross contamination removal, garment removal and surety |
What is station 1 for Chem/Bio PDS? | Equipment and pyrotechnic drop |
What is station 2 for Chem/Bio PDS? | Outer garment decontamination |
What is station 3 for Chem/Bio PDS? | Inner garment removal |
What is station 4 for Chem/Bio PDS? | Monitoring |
What is station 5 for Bio PDS? | Shower/rinse |
What is station 1 for Rad PDS? | Equipment and pyrotechnics drop |
What is station 2 for Rad PDS? | Outer garment doff |
What is station 3 for Rad PDS? | Boot doff |
What is station 4 for Rad PDS? | Monitoring |
What is station 5 for Rad PDS? | Mask doff |
What is station 6 for Rad PDS? | Dust mask don / face and hand wash |
Who starts DD Form 1911? | Transload NCO |