click below
click below
Normal Size Small Size show me how
303 Study Guide
Question | Answer |
---|---|
Divisional LCPO | |
Performing Maintenance | |
U-1 | |
+ | |
++ | |
* | |
Green | |
Yellow | |
3M301 | |
Date | |
After the work center supervisor makes the line outs on an MRC, MIP or LOEP who reviews and initials? | |
What color is the first scheduled offset MRC? | |
What color represents a changed MIP? | |
What is the minimum qualification to perform tagouts? | |
What does the first segment on the syscom control number represent? | |
Maintenance can only be moved forward not back and must fall within periodically |