click below
click below
Normal Size Small Size show me how
303 Study Guide
| Question | Answer |
|---|---|
| Divisional LCPO | |
| Performing Maintenance | |
| U-1 | |
| + | |
| ++ | |
| * | |
| Green | |
| Yellow | |
| 3M301 | |
| Date | |
| After the work center supervisor makes the line outs on an MRC, MIP or LOEP who reviews and initials? | |
| What color is the first scheduled offset MRC? | |
| What color represents a changed MIP? | |
| What is the minimum qualification to perform tagouts? | |
| What does the first segment on the syscom control number represent? | |
| Maintenance can only be moved forward not back and must fall within periodically |