Save
Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.
focusNode
Didn't know it?
click below
 
Knew it?
click below
Don't Know
Remaining cards (0)
Know
0:00
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how

3E051 2-4

Set 2 Book 4

QuestionAnswer
Which of the following is not a subsection of the mobile aircraft arresting system Pendant cable
the mobile aircraft arresting system is capable of handling an aborted takeoff or arrested landing every 3 to 5 minutes
How many hydraulic power units are installed on each mobile aircraft arresting system trailer Two
What crew size do you need to install the mobile aircraft arresting system Twelve
Which mobile aircraft arresting system installation method requires the fabrication of a cruciform fondation Concrete off runway
Which type of anchoring system do you use when installing the mobile aircraft arresting system on a soil surface K/M
Which type of anchoring system do you use when installing the mobile aircraft arresting system on asphalt that is more than 6 inches thick Moil
What is the proper fill level for the mobile aircraft arresting system hydraulic power unit reservoir, and at what frequency do you check it during operation 2 inches below the top of the filler neck, every 50 hours
What is the recommended method for cleaning the oil cooler on the mobile aircraft arresting system hydraulic power unit Compressed air
During operation, the engine oil in the mobile aircraft arresting system hydraulic power unit is changed every 25 hours
What size steel cable do you use on the mobile aircraft arresting system trailer winch when it requires replacement The same size the winch was supplied with originally
Lubricate the tape sheaves on the mobile aircraft arresting system trailer after every 50 arrestments
After the TAG installs the 1000 ft crossbar, what is the next step Install the approach lights
When leveling and aiming a PAPI unit, what do you do first Level the unit from side to side by adjusting the unit's two front knobs
What is the final step in installation of the PAPI units Adjust the tilt switch so that the bubble is in the middle
What is the first step of installing the taxiway lights Place two lights and isolation transformers at the beginning of the taxiway for taxiway exit lights
How do you begin the procedure to install the emergency airfield lighting system obstruction lights Install the batteries into the fixture
Which of the following steps is done first when installing the generator and regulator Establish a common ground for the generator, regulator, and control panel
When performing an open circuit test on the regulator, what is the next step after turning the circuit breaker off Remove the male to male adapter cable from the output current plugs
What is the last step in activating the emergency airfield lighting system from the control panel Set the strobe control switch to 1-18 or 19-36
When performing a short circuit test on the emergency airfield lighting system regulator, what is the nest step after turning the intensity selector switch to low Turn the intensity selector switch to medium
When replacing a lamp on a runway edge light, how do you remove the lamp from its base Grip the lamp by its ceramic base and pull straight up
What is the procedure to remove the red lens from an obstruction light Loosen the screws holding the lens in place, turn it to the right and pull it straight up
which of the following is a step in the process of changing out a lamp in a strobe unit Short the capacitors
What generator is used for emergency backup of facilities that are mission essential, such as communications centers and command posts MEP 006A
Besides conductor size, what is another important factor to consider when reducing voltage drop in an electrical circuit Circuit distance
You have a #8 AWG stranded copper conductor with 0.778 ohms of resistance for each 1000 feet of length. If you run that cabling 100 feet between the power plant and the load, what would the total resistance be 0.0778
The bus bar for two paralleled generators must be large enough to carry The output of the larger generator
What is the first step you perform when placing a generator back into service Open circuit breakers and start largest generator
The emergency (battle short) switch bypasses all of the following relays except the Over speed relay
When you operate in extremely cold climates, what must you do to prevent the battery from freezing when you add water Immediately mix the fluid by charging the battery
During which type of climatic condition could vibrations cause chafing and fraying of the generator wiring Extreme heat
Which of the following is not a major component of the basic expeditionary airfield resources interior tent lighting system Secondary B panel
How many light streamers does each basic expeditionary airfield resources tent receive Two
What action ensures rapid reinstallation of the basic expeditionary airfield resources tent lighting system Placing components into their proper storage containers
What is the maximum length the remote area lighting system can be 1500 feet
How many light masts come with the remote area lighting system 13
For a fully operational remote area lighting system, you can establish automatic operation by positioning the override switch to AUTO
At what frequency do you inspect the remote area lighting system structure for corrosion Quarterly
What is the output rating of the diesel generator on the telescoping floodlight set 7 kW
What is the biggest advantage of the telescoping floodlight set over the remote area lighting system Production of its own power
What are the size and type of lamps used on the telescoping light set portable light stands 500 watt quartz
For proper operation, you need to keep the telescoping floodlight set generator output between 233 and 247 VAC
What is the full height of the telescoping floodlight set trailer tower 30 feet
During operation under dusty conditions, how often must you clean the air filter in the generator on the telescoping floodlight set Every 8 hours
The reverse osmosis water purification unit requires a power supply that is capable of providing 120/208 VAC
On the reverse osmosis water purification unit, which pump motor does the 90 amp circuit breaker number 1 proctect Reverse osmosis
Where is the reverse osmosis water purification unit ground rod stored On the control panel
Before performing maintenance on the reverse osmosis water purification unit, you should Open all drains and vents
Which contingency asset requires two dedicated secondary distribution center (SDC) to meet its high load demands Basic expeditionary airfield resources kitchen
Which major component of the basic expeditionary airfield resources kitchen electrical system not only acts as a distribution point, but also provides circuit protection Secondary distribution center
What is the frequency of inspection of the basic expeditionary airfield resources kitchen electrical system when it is in opertion Weekly
What is the primary distribution voltage of the basic expeditionary airfield resources (BEAR) electrical system 4160 VAC
What type of termination is used on the primary distribution center for the input and output cables Load break elbows
A total of how many generators can be installed on the line side of the primary distribution center Four
How many sets of individual feeder circuits are on the load side of the primary distribution center Six
Power is distributed from the primary distribution center main bus, to the six individual branch circuits, through arc strangler disconnect switches and a fuse assembly that is rated at 200 amps
What is the conductor size and insulation value of the basic expeditionary airfield resources high voltage electrical cable #1/0, 5 kV
You should bury primary cables to a depth of at least 18 inches
You inspect operational primary distribution center grounds Monthly
One important thing to do before performing maintenance on the secondary distribution center is to Ensure all power is removed
What basic expeditionary airfield resources asset is used as the main distribution point for secondary circuits Secondary distribution center
To operate a secondary distribution center directly from a mission essential power generator instead of from the primary distribution system, you must Engage the manual transfer switch
How many 120/208 VAC output circuits can the secondary distribution center provide Sixteen
Which power distribution panel is associated with the tent extendible modular personnel tent 25 kW
The purpose of the SDC high temperature override switch is to Allow bypassing of the main breaker shunt trip mechamism
During deployments to locations where low voltage will be used for a short time, what can you do to ground the system if the ground rod cannot be driven into the earth Bury the ground rod in a horizontal trench that is 18 inches deep
What mixture of salt and water normally increases the conductivity of the soil that is in contact with a ground rod Three pounds of salt per one gallon of water
Two expedient grounding techniques are the expedient ground pipe and the expedient ground Trench
The type I tent extendible modular personnel tent lighting kit receives its power from A lighting distribution box
The type II lighting kit consists of a junction streamer, two light steamer, and An exterior light streamer
Where do you place the exterior light streamer In the tent vestibule
What is the total capacity of a transformer bank that is in a open delta connection 57.7 percent of the remaining two
When you make expedient repairs to the interior wiring of a facility Use as much of the existing undamaged wiring as possible
What is the power requirement for a fully operational aeromedical staging facility 200 kW
The transportable blood transshipment center is normally collocated with A contingency hospital (CH)
What is the primary operating voltage required for the chemically hardened air management plant system 208 VAC, three phase, 50/60 Hz
How much power is required to operate a small shelter system 12 kW
What supplies the power to light and general purpose receptacle circuits in the medium shelter system Four 20 amp GFCI breakers
Where are the general purpose receptacle circuits positioned in the medium shelter system Four feet high at every other arch
What is the electrical rating for the deployable power generation and distribution system primary distribution center 4160 VAC, 200 amps
The deployable power generation and distribution system secondary distribution center secondary voltage is rated at 120/208 VAC
In the deployable power generation and distribution system, what provides mission essential power during inital setup Tactical quiet generator set
The power unit provides three modes of operation: manual start, automatic, and Economizing
What device allows remote control in all the deployable power generation and distribution system operations Laptop computer
If the operation selector on the primary switching center is blocking the switching action you are trying to perform, what step must you take Rotate the operation selector out of the way
Popular Military sets

 

 



Voices

Use these flashcards to help memorize information. Look at the large card and try to recall what is on the other side. Then click the card to flip it. If you knew the answer, click the green Know box. Otherwise, click the red Don't know box.

When you've placed seven or more cards in the Don't know box, click "retry" to try those cards again.

If you've accidentally put the card in the wrong box, just click on the card to take it out of the box.

You can also use your keyboard to move the cards as follows:

If you are logged in to your account, this website will remember which cards you know and don't know so that they are in the same box the next time you log in.

When you need a break, try one of the other activities listed below the flashcards like Matching, Snowman, or Hungry Bug. Although it may feel like you're playing a game, your brain is still making more connections with the information to help you out.

To see how well you know the information, try the Quiz or Test activity.

Pass complete!
"Know" box contains:
Time elapsed:
Retries:
restart all cards