click below
click below
Normal Size Small Size show me how
2R151 CDCs 1-3
| Question | Answer |
|---|---|
| What do inspection work cards outline? | Inspection work cards outline the minimum inspection requirements |
| How are inspection work cards grouped? | By the types of specialist required to perform the inspection |
| What does the use of work cards permit? | Each individual's work to be programmed without task interruption |
| What are the two inspection methods? | In-place and dock methods |
| Which method requires the inspection to be performed at the equipment location? | In-place |
| Which method requires the equipment to be moved to a certain fixed location for the inspection? | Dock |
| What is scheduled maintenance? | Predictable maintenance requirements that can be planned or programmed on either a short-or long-range schedule. |
| What is unscheduled maintenance? | Unpredictable maintenance requirements that have not been previously planned or programmed, but require prompt attention and must be added, to integrated with, or substituted for scheduled workloads. |
| When will all requirements pertaining to an inspection normally be accomplished? Why? | Concurrently, to avoid complications in scheduling and controlling the required maintenance. |
| What do time intervals specified for scheduled maintenance inspections and recurring supplementary inspection requirements represent? | Maximum interval between completion of such requirements. |
| Who may increase the frequency or scope of scheduled inspections or individual inspection requirements, when required for temporary situation? | The local commander |