APICS CPIM Basics of supply chain dictionary words P

Quiz yourself by thinking what should be in each of the black spaces below before clicking on it to display the answer.
        Help!  

Question
Answer
show In lean the philosophy is to produce at the market rate of consumption. B/c lines cannot be perfectly balanced, the pacemaker is the resource requiring the longest time to produce among the set of activities in a line or cell.  
🗑
Package to order   show
🗑
show A calculation of the space needed to store a certain number of pallents  
🗑
show In MRP and MPS, the capability to identify for a given item the sources of its gross requirements and/or allocations. Pegging can be thought of as active where-used information.  
🗑
Pipeline stock   show
🗑
show A 4 step process for quality immprovement. In the first step (plan), a plan to effect improvement is developed. In the second step, the plan is carried out, preferably on a small scale. 3rd observed 4th results are studied  
🗑
Planned order release   show
🗑
show In a JIT system, work in process materials used to build finished goods are relieved from inventory by multiplying the number of units completed by the number of parts in the BOM. Effective only if the BOM is accurate and manufacturing lead times r short.  
🗑
postponement   show
🗑
Procurement   show
🗑
Procurement lead time   show
🗑
show The resource capacity needed to protect system throughput-ensuring that some capacity above the capacity required to exploit the constraint is available to catch up when disruptions inevitably occur.  
🗑
Quality at the source   show
🗑
show Having a small setup time in order to have small production batches and small WIP inventory  
🗑
show  
🗑
show  
🗑
participative design/engineering   show
🗑
show  
🗑
show  
🗑
show  
🗑
show  
🗑
show  
🗑
physical supply   show
🗑
show  
🗑
show  
🗑
show  
🗑
planned order receipt   show
🗑
show  
🗑
show  
🗑
point of sale (POS)   show
🗑
prevention costs   show
🗑
preventive maintenance   show
🗑
show  
🗑
show  
🗑
show  
🗑
show  
🗑
process flexibility   show
🗑
process flow diagram   show
🗑
product cost   show
🗑
product differentiation   show
🗑
show  
🗑
show  
🗑
production line   show
🗑
show  
🗑
show  
🗑
productive capacity   show
🗑
productivity   show
🗑
product layout   show
🗑
show  
🗑
show  
🗑
profit margin   show
🗑
projected available balance   show
🗑
project management   show
🗑
show  
🗑
protective inventory   show
🗑
pull system   show
🗑
purchase order   show
🗑
show  
🗑
purchasing lead time   show
🗑
push system   show
🗑
quality   show
🗑
show  
🗑
show  
🗑
show  
🗑
show  
🗑
quantity discount   show
🗑
show  
🗑


   

Review the information in the table. When you are ready to quiz yourself you can hide individual columns or the entire table. Then you can click on the empty cells to reveal the answer. Try to recall what will be displayed before clicking the empty cell.
 
To hide a column, click on the column name.
 
To hide the entire table, click on the "Hide All" button.
 
You may also shuffle the rows of the table by clicking on the "Shuffle" button.
 
Or sort by any of the columns using the down arrow next to any column heading.
If you know all the data on any row, you can temporarily remove it by tapping the trash can to the right of the row.

 
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how
Created by: chrisheecho
Popular Standardized Tests sets