5 Level CDCs Volume 3
Help!
|
|
||||
---|---|---|---|---|---|
show | Few in number
🗑
|
||||
You would consider using the time study continuous method to complete a work measurement evaluation when the elements to be timed are | show 🗑
|
||||
show | many workers in a small area
🗑
|
||||
What work measurement method has limited application in a wartime environment? | show 🗑
|
||||
When conducting a work sampling study, what is the minimum number of usable days for the sampling period you are required to have? | show 🗑
|
||||
show | increasing the number of people being sampled
🗑
|
||||
Which could you use to supplement level I work sampling when there is work that does not occur in the sampling period? | show 🗑
|
||||
show | complement
🗑
|
||||
show | HQ USAF, Director of Operations Operational Training Division
🗑
|
||||
show | Submitting changes to existing composition and ratios
🗑
|
||||
TSgt Harper is preparing for the annual review of all aircrew positions. At which level of responsibility would she work? | show 🗑
|
||||
In the functional estimating equation (FEE) process, which manpower requirements method computes the entire amount of the total manpower requirement for a function or program? | show 🗑
|
||||
show | Program Estimating
🗑
|
||||
Which type of mathematical equation is used when developing a functional estimating equation (FEE) for a major command functional area? | show 🗑
|
||||
show | program estimating factor data
🗑
|
||||
show | Three
🗑
|
||||
On which concept about work centers are capability-based manpower standards (CMS) constructed? | show 🗑
|
||||
show | quantify minimum manpower required
🗑
|
||||
When developing a manpower standard for an activity that remains in-house after a cost comparison study, what is used as a basis for development of the process oriented description? | show 🗑
|
||||
Which portion of the manpower standard contains a series of broad statements that define the mission support capabilities of each subordinate element? | show 🗑
|
||||
show | Statement of Conditions
🗑
|
||||
show | Man-hour availability
🗑
|
||||
show | aircraft maintenance workweeks
🗑
|
||||
show | 2
🗑
|
||||
If a work center exceeds their normal 40-hour workweek by 30 minutes per day, which factor is applied instead of adding additional manpower? | show 🗑
|
||||
After you receive implementation instructions, how many days do you have to implement a new capability-based manpower standard into the Manpower Programming and Execution System (MPES)? | show 🗑
|
||||
Unless a significant mission or workload change has occurred, the manpower standards are reapplied | show 🗑
|
||||
show | By subtracting approved contract manpower equivalent man-hours from the man-hour total
🗑
|
||||
show | military- essential
🗑
|
||||
When applying capability-based manpower standards, which positions are addressed directly after foreign national civilian positions are calculated? | show 🗑
|
||||
show | 8
🗑
|
||||
show | an agency staffed partially with government personnel
🗑
|
||||
show | is deemed inherently governmental
🗑
|
||||
Which organization is not included in the Competitive Sourcing Management Steering Group (CSMSG)? | show 🗑
|
||||
show | in-house manpower requirements
🗑
|
||||
Unless a waiver is granted, the duration of a public-private competition may not exceed a period of how many months? | show 🗑
|
||||
show | Functions currently performed under contract but could be performed by DOD civilian employees
🗑
|
||||
What person or agency is responsible for making the initial public announcement for a public-private competition initiative? | show 🗑
|
||||
During the performance work statement development, which individuals are prohibited from participating? | show 🗑
|
||||
Which representative(s), whose guidance related to their area of expertise, may have an impact on the successful completion of the public-private competition? | show 🗑
|
||||
Air Force inherently governmental/commercial activities (IG/CA) inventories are done every | show 🗑
|
||||
Which category of manpower must be used to perform functions intimately related to the public interest? | show 🗑
|
||||
show | commercial activity exempt
🗑
|
||||
Which long term/enduring services can be performed by the private sector? | show 🗑
|
||||
Which entity conducts the mass change that incorporates the results of the Air Force Inherently Governmental/Commercial Activities (IG/CA) inventory into the Manpower Programming and Execution System (MPES)? | show 🗑
|
||||
show | 7
🗑
|
||||
Which public-private competition data is considered releasable under the Freedom of Information Act (FOIA) request from the Office of the Secretary of Defense (OSD)? | show 🗑
|
||||
show | Preliminary planning process
🗑
|
||||
show | 60
🗑
|
||||
show | Performance work statement
🗑
|
||||
Which acquisition strategy has the potential to preclude small businesses and ultimately influence the amount of competition and the eventual cost to the government? | show 🗑
|
||||
The extent of which acquisition strategy varies based on the urgency, estimated dollar value, complexity, and past experiences of the activity under study? | show 🗑
|
||||
The comprehensive plan for fulfilling the government’s requirements for the activity under study in a timely manner is documented in the | show 🗑
|
||||
show | Acquisition strategy and performance work statement
🗑
|
||||
The requirement considerations in the agency tender (AT), developed by the most efficient organization (MEO) team, are based on | show 🗑
|
||||
Which plan contains the most effective organization (MEO) internal staffing necessary to meet the service delivery requirements of the performance work statement (PWS)? | show 🗑
|
||||
show | Source selection authority
🗑
|
||||
When considering a public-private competition, the final selection between the in-house offer and the selected private sector offer must be based upon what? | show 🗑
|
||||
show | Satisfies the reporting requirements directed by Congress
🗑
|
||||
Support between Department of Defense components is established through which type of support agreement? | show 🗑
|
||||
Support between major commands within the Air Force is established through which type of support agreement? | show 🗑
|
||||
The statement: “During the growing season, all receivers’ open areas will be mowed twice a month.” is an example of what type support agreement? | show 🗑
|
||||
show | Triennially
🗑
|
||||
In addition to specifying the resources to be provided by both the supplying and receiving activities, support agreements document the tasks needed by the receiver and are included in a a. capability-based manpower standard (annex A). | show 🗑
|
||||
Support agreement negotiations benefit the Department of Defense by | show 🗑
|
||||
show | duplication is identified
🗑
|
||||
In financing support agreements, reimbursable support costs are determined through | show 🗑
|
||||
In reference to intraservice support agreement, when there is concurrent use of host facilities and equipment by the host and tenant, the method of support is | show 🗑
|
||||
show | functional consolidation
🗑
|
||||
In reference to instraservice support agreement, what type of support arrangement is applicable when there is a physical separation of activities or a mobility requirement dictates its use? | show 🗑
|
||||
show | document the exchange of services and/or resources
🗑
|
||||
show | define the broad areas of support
🗑
|
||||
When it is not clear at the local level which of several installations can support a receiver most economically or effectively, who resolves it? | show 🗑
|
||||
When support is feasible, who is tasked to provide specific provisions in an agreement; identify direct and indirect incremental reimbursable costs; and, with the servicing manpower and organization office, obtain manpower figures? | show 🗑
|
||||
Who identifies opportunities of support assess minimum inputs of proposed support arrangements, and commits resources to accomplish the support arrangements? | show 🗑
|
||||
One way to determine the manpower impact in a support agreement annex is to | show 🗑
|
Review the information in the table. When you are ready to quiz yourself you can hide individual columns or the entire table. Then you can click on the empty cells to reveal the answer. Try to recall what will be displayed before clicking the empty cell.
To hide a column, click on the column name.
To hide the entire table, click on the "Hide All" button.
You may also shuffle the rows of the table by clicking on the "Shuffle" button.
Or sort by any of the columns using the down arrow next to any column heading.
If you know all the data on any row, you can temporarily remove it by tapping the trash can to the right of the row.
To hide a column, click on the column name.
To hide the entire table, click on the "Hide All" button.
You may also shuffle the rows of the table by clicking on the "Shuffle" button.
Or sort by any of the columns using the down arrow next to any column heading.
If you know all the data on any row, you can temporarily remove it by tapping the trash can to the right of the row.
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.
Normal Size Small Size show me how
Normal Size Small Size show me how
Created by:
JLSmith3782
Popular Military sets