Save
Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.
focusNode
Didn't know it?
click below
 
Knew it?
click below
Don't Know
Remaining cards (0)
Know
0:00
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how

PMBOK-Definitions

QuestionAnswer
Multiple attributes associated with each schedule activity that can be included within the activity list. This include activity codes, predecessor activities, successor activities, logical relationships, leads and lags, resource requirements, imposed date Activity Attributes [Output/Input]
A technique that explores the accuracy of assumptions and identifies risks to the project from inaccuracy, inconsistency, or incompleteness of assumptions. Assumptions Analysis technique
Same as actual cost (AC): Total costs actually incurred and recorded in accomplishing work performed during a given time period for a schedule activity or work breakdown structure component. This can sometimes be direct labor hours alone, direct costs alo Actual Cost of Work Performed (ACWP)
Total costs actually incurred and recorded in accomplishing work performed during a given time period for a schedule activity or work breakdown structure component. This can sometimes be direct labor hours alone, direct costs alone, or all costs including Actual Cost (AC)
The process of confirming human resource availability and obtaining the team necessary to complete project assignments. Acquire Project Team [Process]
"Those criteria, including performance requirements and essential conditions, which must be met before project deliverables are accepted." Acceptance Criteria
A component of work performed during the course of a project. Activity
One or more numerical or text values that identify characteristics of the work or in some way categorize the schedule activity that allows filtering and ordering of activities within reports. Activity Code
The time in calendar units between the start and finish of a schedule activity. See also duration. Activity Duration
A short unique numeric or text identification assigned to each schedule activity to differentiate that project activity from other activities. Typically unique within any one project schedule network diagram. Activity Identifier
A documented tabulation of schedule activities that shows the activity description, activity identifier, and a sufficiently detailed scope of work description so project team members understand what work is to be performed. Activity List [Output/Input]
The time in calendar units between the actual start date of the schedule activity and either the data date of the project schedule if the schedule activity is in progress or the actual finish date if the schedule activity is complete. Actual Duration
The process of managing procurement relationships, monitoring contract performance, and making changes and corrections as needed. Administer Procurements [Process]
An estimating technique that uses the values of parameters, such as scope, cost, budget, and duration or measures of scale such as size, weight, and complexity from a previous, similar activity as the basis for estimating the same parameter or measure for Analogous Estimating [Technique]
A category of projects that have common components significant in such projects, but are not needed or present in all projects. These are usually defined in terms of either the product (i.e., by similar technologies or production methods) or the type of Application Area
A change request that has been processed through the integrated change control process and approved. Approved Change Request [Output/lnput]
These are factors that, for planning purposes, are considered to be true, real, or certain without proof or demonstration. Assumptions
The right to apply project resources, expend funds, make decisions, or give approvals. Authority
The calculation of late finish dates and late start dates for the uncompleted portions of all schedule activities. Determined by working backwards through the schedule network logic from the project's end date. See also schedule network analysis. Backward Pass
An approved plan for a project, plus or minus approved changes. It is compared to actual performance to determine if performance is within acceptable variance thresholds. Baseline - (Generally refers to the current baseline, but may refer to the original or some other baseline. Usually used with a modifier (e.g., cost performance baseline, schedule baseline, performance measurement baseline, technical baseline).)
A method of estimating a component of work. The work is decomposed into more detail. An estimate is prepared of what is needed to meet the requirements of each of the lower, more detailed pieces of work, and these estimates are then aggregated into a tota Bottom-up Estimating [Technique] <br>(The accuracy of bottom-up estimating is driven by the size and complexity of the work identified at the lower levels.)
A general data gathering and creativity technique that can be used to identify risks, ideas, or solutions to issues by using a group of team members or subject-matter experts. Brainstorming [Technique]
The approved estimate for the project or any work breakdown structure component or any schedule activity. Budget
The sum of all the budgets established for the work to be performed on a project or a work breakdown structure component or a schedule activity. The total planned value for the project. Budget at Completion (BAC)
Same as earned value (EV): The value of work performed expressed in terms of the approved budget assigned to that work for a schedule activity or work breakdown structure component. Budgeted Cost of Work Performed (BCWP)
Same as planned value (PV): The authorized budget assigned to the scheduled work to be accomplished for a schedule activity or work breakdown structure component. Budgeted Cost of Work Scheduled (BCWS)
Similar to reserve. A provision in the project management plan to mitigate cost and/or schedule risk. Buffer
The acquirer of products, services, or results for an organization. Buyer
The smallest unit of time used in scheduling a project. These are generally in hours, days, or weeks, but can also be in quarter years, months, shifts, or even in minutes. " Calendar Unit
Identifying, documenting, approving or rejecting, and controlling changes to the project baselines. Change Control
A formally constituted group of stakeholders responsible for reviewing, evaluating, approving, delaying, or rejecting changes to a project, with all decisions and recommendations being recorded. Change Control Board (CCB)
A collection of formal documented procedures that define how project deliverables and documentation will be controlled, changed, and approved. In most application areas, this system is a subset of the configuration management system. Change Control System [Tool]
Requests to expand or reduce the project scope, modify policies, processes, plans, or procedures, modify costs or budgets, or revise schedules. Change Request
A request, demand, or assertion of rights by a seller against a buyer, or vice versa, for consideration, compensation, or payment under the terms of a legally binding contract, such as for a disputed change. Claim
The process of completing each project procurement. Close Procurements [Process]
The process of finalizing all activities across all of the Project Management Process Groups to formally complete the project or phase. Close Project or Phase [Process]
Those processes performed to finalize all activities across all Project Management Process Groups to formally close the project or phase. Closing Processes [Process Group]
Any numbering system used to uniquely identify each component of the work breakdown structure. Code of Accounts [Tool]
This is the process of defining and documenting stakeholders' needs to meet the project objectives. Collect Requirements [Process]
An organizational placement strategy where the project team members are physically located close to one another in order to improve communication, working relationships, and productivity. Co-location [Technique]
A source of variation that is inherent in the system and predictable. On a control chart, it appears as part of the random process variation (i.e., variation from a process that would be considered normal or not unusual), and is indicated by a random patt Common Cause
The document that describes: the communications needs and expectations for the project; how and in what format information will be communicated; when and where each communication will be made; and who is responsible for providing each type of communicatio Communication Management Plan [Output/Input]
"The process of obtaining seller responses, selecting a seller, and awarding a contract." Conduct Procurements [Process]
"A subsystem of the overall project management system. It is a collection of formal documented procedures used to apply technical and administrative direction and surveillance to: identify and document the functional and physical characteristics of a prod Configuration Management System [Tool]
"The state, quality, or sense of being restricted to a given course of action or inaction. An applicable restriction or limitation, either internal or external to a project, which will affect the performance of the project or a process. For example, a sch Constraint [Input]
"Another term (one word) for reserve: A provision in the project management plan to mitigate cost and/or schedule risk. Often used with a modifier (e.g., management reserve, contingency reserve) to provide further detail on what types of risk are meant to Contingency
"Another term (two words) for reserve: A provision in the project management plan to mitigate cost and/or schedule risk. Often used with a modifier (e.g., management reserve, contingency reserve) to provide further detail on what types of risk are meant t Contingency Allowance
"The amount of funds, budget, or time needed above the estimate to reduce the risk of overruns of project objectives to a level acceptable to the organization." Contingency Reserve [Output/Input]
A contract is a mutually binding agreement that obligates the seller to provide the specified product or service or result and obligates the buyer to pay for it. Contract [Output/Input]
"Comparing actual performance with planned performance, analyzing variances, assessing trends to effect process improvements, evaluating possible alternatives, and recommending appropriate corrective action as needed." Control
"A management control point where scope, budget (resource plans), actual cost, and schedule are integrated and compared to earned value for performance measurement. See also work package." Control Account [Tool]
"A graphic display of process data over time and against established control limits, and that has a centerline that assists in detecting a trend of plotted values toward either control limit." Control Chart [Tool]
The process of monitoring the status of the project to update the project budget and managing changes to the cost baseline. Control Costs [Process]
"The area composed of three standard deviations on either side of the centerline, or mean, of a normal distribution of data plotted on a control chart that reflects the expected variation in the data. See also specification limits." Control Limits
The process of monitoring the status of the project to update project progress and managing changes to the schedule baseline. Control Schedule [Process]
The process of monitoring the status of the project and product scope and managing changes to the scope baseline. Control Scope [Process]
"Same as control: Comparing actual performance with planned performance, analyzing variances, assessing trends to effect process improvements, evaluating possible alternatives, and recommending appropriate corrective action as needed." Controlling
Documented direction for executing the project work to bring expected future performance of the project work in line with the project management plan. Corrective Action
"The document that sets out the format and establishes the activities and criteria for planning, structuring, and controlling the project costs. The cost management plan is contained in, or is a subsidiary plan of, the project management plan." Cost Management Plan [Output/Input]
"A method of determining the costs incurred to ensure quality. Prevention and appraisal costs (cost of conformance) include costs for quality planning, quality control (QC), and quality assurance to ensure compliance to requirements (i.e., training, QC sy Cost of Quality (COQ) [Technique]
A specific version of the time-phased budget used to compare actual expenditures to planned expenditures to determine if preventive or corrective action is needed to meet the project objectives. Cost Performance Baseline
A measure of cost efficiency on a project. It is the ratio of earned value (EV) to actual costs (AC). CPI = EV divided by AC. Cost Performance Index (CPI)
A type of cost-reimbursable contract where the buyer reimburses the seller for the seller's allowable costs (allowable costs are defined by the contract) plus a fixed amount of profit (fee). Cost-Plus-Fixed-Fee (CPFF) Contract
"A type of cost-reimbursable contract where the buyer reimburses the seller for the seller's allowable costs (allowable costs are defined by the contract), and the seller earns its profit if it meets defined performance criteria. " Cost-Plus-Incentive-Fee (CPIF) Contract
"A type of contract involving payment to the seller for the seller's actual costs, plus a fee typically representing seller's profit. Cost-reimbursable contracts often include incentive clauses where, if the seller meets or exceeds selected project object Cost-Reimbursable Contract
A measure of cost performance on a project. It is the difference between earned value (EV) and actual cost (AC). CV = EV minus AC. Cost Variance (CV)
A specific type of project schedule compression technique performed by taking action to decrease the total project schedule duration after analyzing a number of alternatives to determine how to get the maximum schedule duration compression for the least a Crashing Technique
"The process of subdividing project deliverables and project work into smaller, more manageable components." Create WBS (Work Breakdown Structure) [Process]
"Standards, rules, or tests on which a judgment or decision can be based, or by which a product, service, result, or process can be evaluated." Criteria
"Any schedule activity on a critical path in a project schedule. Most commonly determined by using the critical path method. Although some activities are ""critical,"" in the dictionary sense, without being on the critical path, this meaning is seldom use Critical Activity
A schedule network analysis technique that modifies the project schedule to account for limited resources. Critical Chain Method [Technique]
"Generally, but not always, the sequence of schedule activities that determines the duration of the project. It is the longest path through the project. See also criticalpath methodology." Critical Path
"A schedule network analysis technique used to determine the amount of scheduling flexibility (the amount of float) on various logical network paths in the project schedule network, and to determine the minimum total project duration. Early start and fini Critical Path Methodology (CPM) [Technique]
The date up to or through which the project's reporting system has provided actual status and accomplishments. Also called as-of date and time-now date. Data Date
"The decision tree is a diagram that describes a decision under consideration and the implications of choosing one or another of the available alternatives. It is used when some future scenarios or outcomes of actions are uncertain. It incorporates probab Decision Tree Analysis [Technique]
"A planning technique that subdivides the project scope and project deliverables into smaller, more manageable components, until the project work associated with accomplishing the project scope and providing the deliverables is defined in sufficient detai Decomposition [Technique]
An imperfection or deficiency in a project component where that component does not meet its requirements or specifications and needs to be either repaired or replaced. Defect
The formally documented identification of a defect in a project component with a recommendation to either repair the defect or completely replace the component. Defect Repair
The process of identifying the specific actions to be performed to produce the project deliverables. Define Activities [Process]
The process of developing a detailed description of the project and product. Define Scope [Process]
"Any unique and verifiable product, result, or capability to perform a service that must be produced to complete a process, phase, or project. Often used more narrowly in reference to an external deliverable, which is a deliverable that is subject to appr Deliverable [Output/Input]
An information gathering technique used as a way to reach a consensus of experts on a subject. Experts on the subject participate in this technique anonymously. A facilitator uses a questionnaire to solicit ideas about the important project points related Delphi Technique [Technique]
"Another way to say ""logical relationship."" - one word" Dependency
The process of aggregating the estimated costs of individual activities or work packages to establish an authorized cost baseline. Determine Budget [Process]
"The process of identifying and documenting project roles, responsibilities, and required skills, reporting relationships, and creating a staffing management plan." Develop Human Resource Plan [Process]
The process of developing a document that formally authorizes a project or a phase and documenting initial requirements that satisfy the stakeholder's needs and expectations. Develop Project Charter [Process]
"The process of documenting the actions necessary to define, prepare, integrate, and coordinate all subsidiary plans." Develop Project Management Plan [Process]
"The process of improving the competencies, team interaction, and the overall team environment to enhance project performance." Develop Project Team [Process]
"The process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule." Develop Schedule [Process]
The process of performing the work defined in the project management plan to achieve the project's objectives. Direct and Manage Project Execution [Process]
The process of making relevant information available to project stakeholders as planned. Distribute Information [Process]
"The total number of work periods (not including holidays or other nonworking periods) required to complete a schedule activity or work breakdown structure component. Usually expressed as workdays or workweeks. Sometimes incorrectly equated with elapsed t Duration (DU or DUR)
"In the critical path method, the earliest possible point in time on which the uncompleted portions of a schedule activity (or the project) can start, based on the schedule network logic, the data date, and any schedule constraints. Early start dates can Early Start Date (ES)
The value of work performed expressed in terms of the approved budget assigned to that work for a schedule activity or work breakdown structure component. Also referred to as the budgeted cost of work performed (BCWP). Earned Value (EV)
"A management methodology for integrating scope, schedule, and resources, and for objectively measuring project performance and progress. Performance is measured by determining the budgeted cost of work performed (i.e., earned value) and comparing it to t Earned Value Management (EVM)
A specific technique for measuring the performance of work and used to establish the performance measurement baseline (PMB). Earned Value Technique (EVT) [Technique]
"The number of labor units required to complete a schedule activity or work breakdown structure component. Usually expressed as staff hours, staff days, or staff weeks. Contrast with duration." Effort
"Any or all external environmental factors and internal organizational environmental factors that surround or influence the project's success.These factors are from any or all of the enterprises involved in the project, and include organizational culture Enterprise Environmental Factors [Output/Input]
"A quantitative assessment of the likely amount or outcome. Usually applied to project costs, resources, effort, and durations and is usually preceded by a modifier (i.e., preliminary, conceptual, feasibility, order-of-magnitude, definitive). It should al Estimate [Output/lnput]
The process of approximating the number of work periods needed to complete individual activities with estimated resources. Estimate Activity Durations [Process]
"The process of estimating the type and quantities of material, people, equipment or supplies required to perform each activity." Estimate Activity Resources [Process]
"The expected total cost of a schedule activity, a work breakdown structure component, or the project when the defined scope of work will be completed.The EAC may be calculated based on performance to date or estimated by the project team based on other f Estimate at Completion (EAC) [Output/Input]
The process of developing an approximation of the monetary resources needed to complete project activities. Estimate Costs [Process]
"The expected cost needed to complete all the remaining work for a schedule activity, work breakdown structure component, or the project. See also earned value technique and estimate at completion." Estimate to Complete (ETC) [Output/Input]
"Directing, managing, performing, and accomplishing the project work, providing the deliverables, and providing work performance information." Execute
Those processes performed to complete the work defined in the project management plan to satisfy the project objectives. Executing Processes [Process Group]
A statistical technique that calculates the average outcome when the future includes scenarios that may or may not happen. A common use of this technique is within decision tree analysis. Expected Monetary Value (EMV) Analysis
"Judgment provided based upon expertise in an application area, knowledge area, discipline, industry, etc. as appropriate for the activity being performed. Such expertise may be provided by any group or person with specialized education, knowledge, skill, Expert Judgment [Technique]
"An analytical procedure in which each potential failure mode in every component of a product is analyzed to determine its effect on the reliability of that component and, by itself or in combination with other possible failure modes, on the reliability o Failure Mode and Effect Analysis (FMEA) [Technique]
"A specific project schedule compression technique that changes network logic to overlap phases that would normally be done in sequence, such as the design phase and construction phase, or to perform schedule activities in parallel. See also crashing and Fast Tracking [Technique]
"A point in time associated with a schedule activity's completion. Usually qualified by one of the following: actual, planned, estimated, scheduled, early, late, baseline, target, or current." Finish Date
The logical relationship where completion of work of the successor activity cannot finish until the completion of work of the predecessor activity. See also logical relationship. Finish-to-Finish (FF)
The logical relationship where initiation of work of the successor activity depends upon the completion of work of the predecessor activity. See also logical relationship. Finish-to-Start (FS)
"A type of fixed price contract where the buyer pays the seller a set amount (as defined by the contract), regardless of the seller's costs. " Firm-Fixed-Price (FFP) Contract
"A type of contract where the buyer pays the seller a set amount (as defined by the contract), and the seller can earn an additional amount if the seller meets defined performance criteria." Fixed-Price-Incentive-Fee (FPIF) Contract
Also called slack. See total float and free float. Float
"The depiction in a diagram format of the inputs, process actions, and outputs of one or more processes within a system." Flowcharting [Technique]
"An estimate or prediction of conditions and events in the project's future based on information and knowledge available at the time of the forecast. The information is based on the project's past performance and expected future performance, and includes Forecast
The calculation of the early start and early finish dates for the uncompleted portions of all network activities. See also schedule network analysis and backward pass. Forward Pass
The amount of time that a schedule activity can be delayed without delaying the early start date of any immediately following schedule activities. See also total float. Free Float
Someone with management authority over an organizational unit within a functional organization. The manager of any group that actually makes a product or performs a service. Sometimes called a line manager. Functional Manager
"A hierarchical organization where each employee has one clear superior, and staff are grouped by areas of specialization and managed by a person with expertise in that area." Functional Organization
"A graphic display of schedule-related information. In the typical bar chart, schedule activities or work breakdown structure components are listed down the left side of the chart, dates are shown across the top, and activity durations are shown as date-p Gantt Chart. [Tool]
"A category or rank used to distinguish items that have the same functional use (e.g., ""hammer""), but do not share the same requirements for quality (e.g., different hammers may need to withstand different amounts of force)." Grade
"Same as summary activity: A group of related schedule activities aggregated at some summary level, and displayed reported as a single activity at that summary level. See also subproject and subnetwork." Hammock Activity
"Documents and data on prior projects including project files, records, correspondence, closed contracts, and closed projects." Historical Information
"A document describing how roles and responsibilities, reporting relationships, and staffing management will be addressed and structured for the project. It is contained in or is a subsidiary plan of the project management plan." Human Resource Plan
The process of determining which risks may affect the project and documenting their characteristics. ldentify Risks [Process]
"The process of identifying all people or organizations impacted by the project, and documenting relevant information regarding their interests, involvement, and impact on project success." ldentify Stakeholders [Process]
"A fixed date imposed on a schedule activity or schedule milestone, usually in the form of a ""start no earlier than"" and ""finish no later than"" date. " Imposed Date
"A graphical representation of situations showing causal influences, time ordering of events, and other relationships among variables and outcomes." Influence Diagram [Tool]
Those processes performed to define a new project or a new phase of an existing project by obtaining authorization to start the project or phase. Initiating Processes [Process Group]
"Any item, whether internal or external to the project that is required by a process before that process proceeds. May be an output from a predecessor process." Input [Process Input]
"Examining or measuring to verify whether an activity, component, product, result, or service conforms to specified requirements." Inspection [Technique]
"Generally, this term is equivalent to request for proposal. However, in some application areas, it may have a narrower or more specific meaning." Invitation for Bid (IFB)
"A point or matter in question or in dispute, or a point or matter that is not settled and is under discussion or over which there are opposing views or disagreements." Issue
"A modification of a logical relationship that directs a delay in the successor activity. For example, in a finish-to-start dependency with a ten-day lag, the successor activity cannot start until ten days after the predecessor activity has finished. See Lag [Technique]
"In the critical path method, the latest possible point in time that a schedule activity may begin based upon the schedule network logic, the project completion date, and any constraints assigned to the schedule activities without violating a schedule con Late Start Date (LS)
"A modification of a logical relationship that allows an acceleration of the successor activity. For example, in a finish-to-start dependency with a ten-day lead, the successor activity can start ten days before the predecessor activity has finished. A ne Lead [Technique]
"The learning gained from the process of performing the project. Lessons learned may be identified at any point. Also considered a project record, to be included in the lessons learned knowledge base." Lessons Learned [Output/Input]
A store of historical information and lessons learned about both the outcomes of previous project selection decisions and previous project performance. Lessons Learned Knowledge Base
See resource leveling. Leveling
See project life cycle. Life Cycle
"A document used to record and describe or denote selected items identified during execution of a process or activity. Usually used with a modifier, such as issue, quality control, action, or defect." Log
"A dependency between two project schedule activities, or between a project schedule activity and a schedule milestone. The four possible types of logical relationships are: Finish-to-Start; Finish-to-Finish; Start-to-Start; and Start-to-Finish. See also Logical Relationship
"The process of tracking team member performance, providing feedback, resolving issues, and managing changes to optimize project petformance." Manage Project Team [Process]
The process of communicating and working with stakeholders to meet their needs and addressing issues as they occur. Manage Stakeholder Expectations [Process]
A summary-level project schedule that identifies the major deliverables and work breakdown structure components and key schedule milestones. See also milestone schedule. Master Schedule [Tool]
"The aggregate of things used by an organization in any undertaking, such as equipment, apparatus, tools, machinery, gear, material, and supplies." Material
Any organizational structure in which the project manager shares responsibility with the functional managers for assigning priorities and for directing the work of persons assigned to the project. Matrix Organization
"A system of practices, techniques, procedures, and rules used by those who work in a discipline." Methodology
A significant point or event in the project. Milestone
A summary-level schedule that identifies the major schedule milestones. See also master schedule. Milestone Schedule [Tool]
"Collect project performance data with respect to a plan, produce performance measures, and report and disseminate performance information." Monitor
"The process of tracking, reviewing, and regulating the progress to meet the performance objectives defined in the project management plan." Monitor and Control Project Work [Process]
"The process of implementing risk response plans, tracking identified risks, monitoring residual risks, identifying new risks, and evaluating risk process throughout the project." Monitor and Control Risks [Process]
"Those processes required to track, review, and regulate the progress and performance of the project, identify any areas in which changes to the plan are required, and initiate the corresponding changes." Monitoring and Controlling Processes [Process Group]
"A technique that computes or iterates, the project cost or project schedule many times using input values selected at random from probability distributions of possible costs or durations, to calculate a distribution of possible total project cost or comp Monte Carlo Analysis
A process which generates hundreds or thousands of probable performance outcomes based on probability distributions for cost and schedule on individual tasks. The outcomes are then used to generate a probability distribution for the project as a whole. Monte Carlo Simulation
A schedule activity that has low total float. The concept of near-critical is equally applicable to a schedule activity or schedule network path. The limit below which total float is considered near critical is subject to expert judgment and varies from p Near-Critical Activity
See project schedule network diagram Network
See schedule network analysis. Network Analysis
The collection of schedule activity dependencies that makes up a project schedule network diagram. Network Logic
Any continuous series of schedule activities connected with logical relationships in a project schedule network diagram. Network Path
One of the defining points of a schedule network; a junction point joined to some or all of the other dependency lines. Node
"Something toward which work is to be directed, a strategic position to be attained, or a purpose to be achieved, a result to be obtained, a product to be produced, or a service to be performed." Objective
"A condition or situation favorable to the project, a positive set of circumstances, a positive set of events, a risk that will have a positive impact on project objectives, or a possibility for positive changes. Contrast with threat." Opportunity
A hierarchically organized depiction of the project organization arranged so as to relate the work packages to the performing organizational units. Organizational Breakdown Structure (OBS) [Tool]
"Any or all process related assets, from any or all of the organizations involved in the project that are or can be used to influence the project's success. These process assets include formal and informal plans, policies, procedures, and guidelines. The Organizational Process Assets [Output/Input]
"A product, result, or service generated by a process. May be an input to a successor process." Output [Process Output]
"An estimating technique that uses a statistical relationship between historical data and other variables (e.g., square footage in construction, lines of code in software development) to calculate an estimate for activity parameters, such as scope, cost, Parametric Estimating [Technique]
"A histogram, ordered by frequency of occurrence, that shows how many results were generated by each identified cause." Pareto Chart [Tool]
The merging or joining of parallel schedule network paths into the same node in a project schedule network diagram. Path convergence is characterized by a schedule activity with more than one predecessor activity. Path Convergence
Extending or generating parallel schedule network paths from the same node in a project schedule network diagram. Path divergence is characterized by a schedule activity with more than one successor activity. Path Divergence
"An estimate, expressed as a percent, of the amount of work that has been completed on an activity or a work breakdown structure component." Percent Complete
"The process of reviewing all change requests, approving changes, and managing changes to the deliverables, organizational process assets, project documents, and project management plan." Perform Integrated Change Control [Process]
An approved integrated scope-schedule-cost plan for the project work against which project execution is compared to measure and manage performance. Technical and quality parameters may also be included. Performance Measurement Baseline
"Documents and presentations that provide organized and summarized work performance information, earned value management parameters and calculations, and analyses of project work progress and status." Performance Reports [Output/Input]
The enterprise whose personnel are most directly involved in doing the work of the project. Performing Organization
The process of prioritizing risks for further analysis or action by assessing and combining their probability of occurrence and impact. Perform Qualitative Risk Analysis [Process]
The process of auditing the quality requirements and the results from quality control measurements to ensure appropriate quality standards and operational definitions are used. Perform Quality Assurance [Process]
The process of monitoring and recording results of executing the quality activities to assess performance and recommend necessary changes. Perform Quality Control [Process]
The process of numerically analyzing the effect of identified risks on overall project objectives. Perform Quantitative Risk Analysis [Process]
See project phase. Phase
The process of determining project stakeholder information needs and defining a communication approach. Plan Communications [Process]
"The process of documenting project purchasing decisions, specifying the approach, and identifying potential sellers." Plan Procurements [Process]
"The process of identifying quality requirements andlor standards for the project and product, and documenting how the project will demonstrate compliance." Plan Quality [Process]
The process of defining how to conduct risk management activities for a project. Plan Risk Management [Process]
The process of developing options and actions to enhance opportunities and to reduce threats to project objectives. Plan Risk Responses [Process]
The authorized budget assigned to the scheduled work to be accomplished for a schedule activity or work breakdown structure component. Also referred to as the budgeted cost of work scheduled (BCWS). Planned Value (PV)
A work breakdown structure component below the control account with known work content but without detailed schedule activities. See also control account. Planning Package
"Those processes performed to establish the total scope of the effort, define and refine the objectives, and develop the course of action required to attain those objectives. " Planning Processes [Process Group]
A collection of projects or programs and other work that are grouped together to facilitate effective management of that work to meet strategic business objectives. The projects or programs of the portfolio may not necessarily be interdependent or directl Portfolio
"The centralized management of one or more portfolios, which includes identifying, prioritizing, authorizing, managing, and controlling projects, programs, and other related work, to achieve specific strategic business objectives." Portfolio Management [Technique]
A specific type of professional or management activity that contributes to the execution of a process and that may employ one or more techniques and tools. Practice
A schedule network diagramming technique in which schedule activities are represented by boxes (or nodes). Schedule activities are graphically linked by one or more logical relationships to show the sequence in which the activities are to be performed. Precedence Diagramming Method (PDM) [Technique]
"The term used in the precedence diagramming method for a logical relationship. In current usage, however, precedence relationship, logical relationship, and dependency are widely used interchangeably, regardless of the diagramming method used. See also l Precedence Relationship
The schedule activity that determines when the logical successor activity can begin or end. Predecessor Activity
A documented direction to perform an activity that can reduce the probability of negative consequences associated with project risks. Preventive Action
"A common way to determine whether a risk is considered low, moderate, or high by combining the two dimensions of a risk: its probability of occurrence and its impact on objectives if it occurs." Probability and Impact Matrix [Tool]
"The documents utilized in bid and proposal activities, which include the buyer's lnvitation for Bid, lnvitation for Negotiations, Request for Information, Request for Quotation, Request for Proposal and seller's responses." Procurement Documents [Output/Input]
The document that describes how procurement processes from developing procurement documentation through contract closure will be managed. Procurement Management Plan [Output/Input]
"An artifact that is produced, is quantifiable, and can be either an end item in itself or a component item. Additional words for products are material and goods. Contrast with result See also deliverable." Product
"A collection of generally sequential, non-overlapping product phases whose name and number are determined by the manufacturing and control needs of the organization. The last product life cycle phase for a product is generally the product's retirement. G Product Life Cycle
"The features and functions that characterize a product, service, or result." Product Scope
The documented narrative description of the product scope. Product Scope Description
A group of related projects managed in a coordinated way to obtain benefits and control not available from managing them individually. Programs may include elements of related work outside of the scope of the discrete projects in the program. Program
"A technique for estimating that applies a weighted average of optimistic, pessimistic, and most likely estimates when there is uncertainty with the individual activity estimates." Program Evaluation and Review Technique (PERT)
The centralized coordinated management of a program to achieve the program's strategic objectives and benefits. Program Management
"Continuously improving and detailing a plan as more detailed and specific information and more accurate estimates become available as the project progresses, and thereby producing more accurate and complete plans that result from the successive iteration Progressive Elaboration [Technique]
"A temporary endeavor undertaken to create a unique product, service, or result." Project
"A calendar of working days or shifts that establishes those dates on which schedule activities are worked and nonworking days that determine those dates on which schedule activities are idle. Typically defines holidays, weekends, and shift hours. See als Project Calendar
"A document issued by the project initiator or sponsor that formally authorizes the existence of a project, and provides the project manager with the authority to apply organizational resources to project activities." Project Charter [Output/Input]
"Project Communications Management includes the processes required to ensure timely and appropriate generation, collection, distribution, storage, retrieval, and ultimate disposition of project information." Project Communications Management [Knowledge Area]
"Project Cost Management includes the processes involved in estimating, budgeting, and controlling costs so that the project can be completed within the approved budget." Project Cost Management [Knowledge Area]
Project Human Resource Management includes the processes that organize and manage the project team. Project Human Resource Management [Knowledge Area]
Launching a process that can result in the authorization of a new project. Project Initiation
"Project lntegration Management includes the processes and activities needed to identify, define, combine, unify, and coordinate the various processes and project management activities within the Project Management Process Groups." Project lntegration Management [Knowledge Area]
A collection of generally sequential project phases whose name and number are determined by the control needs of the organization or organizations involved in the pr0ject.A life cycle can be documented with a methodology. Project Life Cycle
"The application of knowledge, skills, tools, and techniques to project activities to meet the project requirements." Project Management
"An inclusive term that describes the sum of knowledge within the profession of project management. As with other professions, such as law, medicine, and accounting, the body of knowledge rests with the practitioners and academics that apply and advance i Project Management Body of Knowledge
"An information system consisting of the tools and techniques used to gather, integrate, and disseminate the outputs of project management processes. It is used to support all aspects of the project from initiating through closing, and can include both ma Project Management Information System (PMIS) [Tool]
"An identified area of project management defined by its knowledge requirements and described in terms of its component processes, practices, inputs, outputs, tools, and techniques." Project Management Knowledge Area
An organizational body or entity assigned various responsibilities related to the centralized and coordinated management of those projects under its domain. The responsibilities of a PMO can range from providing project management support functions to act Project Management Office (PMO)
"A formal, approved document that defines how the project is executed, monitored, and controlled. It may be a summary or detailed and may be composed of one or more subsidiary management plans and other planning documents." Project Management Plan [Output/Input]
"A logical grouping of project management inputs, tools and techniques, and outputs.The Project Management Process Groups include initiating processes, planning processes, executing processes, monitoring and controlling processes, and closing processes. P Project Management Process Group
"The aggregation of the processes, tools, techniques, methodologies, resources, and procedures to manage a project." Project Management System [Tool]
"The members of the project team who are directly involved in project management activities. On some smaller projects, the project management team may include virtually all of the project team members." Project Management Team
The person assigned by the performing organization to achieve the project objectives. Project Manager (PM)
A document that graphically depicts the project team members and their interrelationships for a specific project. Project Organization Chart [Output/Input]
"A collection of logically related project activities, usually culminating in the completion of a major deliverable. Project phases are mainly completed sequentially, but can overlap in some project situations. A project phase is a component of a project Project Phase
"Project Procurement Management includes the processes to purchase or acquire the products, services, or results needed from outside the project team to perform the work." Project Procurement Management [Knowledge Area]
"Project Quality Management includes the processes and activities of the performing organization that determine quality policies, objectives, and responsibilities so that the project will satisfy the needs for which it was undertaken." Project Quality Management [Knowledge Area]
"Project Risk Management includes the processes concerned with conducting risk management planning, identification, analysis, responses, and monitoring and control on a project." Project Risk Management [Knowledge Area]
The planned dates for performing schedule activities and the planned dates for meeting schedule milestones. Project Schedule [Output/Input]
Any schematic display of the logical relationships among the project schedule activities. Always drawn from left to right to reflect project work chronology. Project Schedule Network Diagram [Output/Input]
"The work that must be performed to deliver a product, service, or result with the specified features and functions." Project Scope
"Project Scope Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully." Project Scope Management [Knowledge Area]
"The narrative description of the project scope, including major deliverables, project assumptions, project constraints, and a description of work, that provides a documented basis for making future project decisions and for confirming or developing a com Project Scope Statement [Output/Input]
"A documented list of project team members, their project roles, and communication information." Project Team Directory
Project Time Management includes the processes required to manage the timely completion of a project. Project Time Management [Knowledge Area]
"Any organizational structure in which the project manager has full authority to assign priorities, apply resources, and direct the work of persons assigned to the project." Projectized Organization
The degree to which a set of inherent characteristics fulfills requirements. Quality
The quality management plan describes how the project management team will implement the performing organization's quality policy. The quality management plan is a component or a subsidiary plan of the project management plan. Quality Management Plan [Output/Input]
"Requirements imposed by a governmental body. These requirements can establish product, process, or service characteristics, including applicable administrative provisions that have government mandated compliance." Regulation
"The process of collecting and distributing performance information, including status reports, progress measurements, and forecasts." Report Performance [Process]
A type of procurement document whereby the buyer requests a potential seller to provide various pieces of information related to a product or service or seller capability. Request for Information (RFI)
"A type of procurement document used to request proposals from prospective sellers of products or services. In some application areas, it may have a narrower or more specific meaning." Request for Proposal (RFP)
"A type of procurement document used to request price quotations from prospective sellers of common or standard products or services. Sometimes used in place of request for proposal and in some application areas, it may have a narrower or more specific me Request for Quotation (RFQ)
A formally documented change request that is submitted for approval to the integrated change control process. Requested Change [Output/Input]
"A condition or capability that must be met or possessed by a system, product, service, result, or component to satisfy a contract, standard, specification, or other formally imposed document. Requirements include the quantified and documented needs, want Requirement
A table that links requirements to their origin and traces them throughout the project life cycle. Requirements Traceability Matrix
"A provision in the project management plan to mitigate cost and/or schedule risk. Often used with a modifier (e.g., management reserve, contingency reserve) to provide further detail on what types of risk are meant to be mitigated." Reserve
"An analytical technique to determine the essential features and relationships of components in the project management plan to establish a reserve for the schedule duration, budget, estimated cost, or funds for a project." Reserve Analysis [Technique]
A risk that remains after risk responses have been implemented. Residual Risk
"Skilled human resources (specific disciplines either individually or in crews or teams), equipment, services, supplies, commodities, material, budgets, or funds." Resource
"A hierarchical structure of resources by resource category and resource type used in resource leveling schedules and to develop resource-limited schedules, and which may be used to identify and analyze project human resource assignments." Resource Breakdown Structure
A calendar of working days and nonworking days that determines those dates on which each specific resource is idle or can be active. Typically defines resource specific holidays and resource availability periods. See also project calendar. Resource Calendar
A bar chart showing the amount of time that a resource is scheduled to work over a series of time periods. Resource availability may be depicted as a line for comparison purposes. Contrasting bars may show actual amounts of resources used as the project p Resource Histogram
"Any form of schedule network analysis in which scheduling decisions (start and finish dates) are driven by resource constraints (e.g., limited resource availability or difficult-to-manage changes in resource availability levels)." Resource Leveling [Technique]
A structure that relates the project organizational breakdown structure to the work breakdown structure to help ensure that each component of the project's scope of work is assigned to a person or team. Responsibility Assignment Matrix (RAM) [Tool]
"An output from performing project management processes and activities. Results include outcomes (e.g., integrated systems, revised process, restructured organization, tests, trained personnel, etc.) and documents (e.g., policies, plans, studies, procedur Result
Action taken to bring a defective or nonconforming component into compliance with requirements or specifications. Rework
"An uncertain event or condition that, if it occurs, has a positive or negative effect on a project's objectives." Risk
"A risk response planning technique that indicates that the project team has decided not to change the project management plan to deal with a risk, or is unable to identify any other suitable response strategy." Risk Acceptance [Technique]
A risk response planning technique for a threat that creates changes to the project management plan that are meant to either eliminate the risk or to protect the project objectives from its impact. Risk Avoidance [Technique]
A hierarchically organized depiction of the identified project risks arranged by risk category and subcategory that identifies the various areas and causes of potential risks. The risk breakdown structure is often tailored to specific project types. Risk Breakdown Structure (RBS) [Tool]
"A group of potential causes of risk. Risk causes may be grouped into categories such as technical, external, organizational, environmental, or project management. A category may include subcategories such as technical maturity, weather, or aggressive est Risk Category
"The document describing how project risk management will be structured and performed on the project. It is contained in or is a subsidiary plan of the project management plan. Information in the risk management plan varies by application area and project Risk Management Plan [Output/Input]
A risk response planning technique associated with threats that seeks to reduce the probability of occurrence or impact of a risk to below an acceptable threshold. Risk Mitigation [Technique]
"The document containing the results of the qualitative risk analysis, quantitative risk analysis, and risk response planning. The risk register details all identified risks, including description, category, cause, probability of occurring, impact(s) on o Risk Register [Output/Input]
"The degree, amount, or volume of risk that an organization or individual will withstand." Risk Tolerance
"A risk response planning technique that shifts the impact of a threat to a third party, together with ownership of the response." Risk Transference [Technique]
"A defined function to be performed by a project team member, such as testing, filing, inspecting, coding." Role
"A form of progressive elaboration planning where the work to be accomplished in the near term is planned in detail at a low level of the work breakdown structure, while the work far in the future is planned at a relatively high level of the work breakdow Rolling Wave Planning [Technique]
An analytical technique used to determine the basic underlying reason that causes a variance or a defect or a risk. A root cause may underlie more than one variance or defect or risk. Root Cause Analysis [Technique]
See project schedule and see also schedule model. Schedule
A specific version of the schedule model used to compare actual results to the plan to determine if preventive or corrective action is needed to meet the project objectives. Schedule Baseline
Shortening the project schedule duration without reducing the project scope. See also crashing and fast tracking. Schedule Compression [Technique]
"The documentthat establishescriteria and the activities for developing and controlling the project schedule. It is contained in, or is a subsidiary plan of, the project management plan." Schedule Management Plan [Output/Input]
A model used in conjunction with manual methods or project management software to perform schedule network analysis to generate the project schedule for use in managing the execution of a project. See also project schedule. Schedule Model [Tool]
"The technique of identifying early and late start dates, as well as early and late finish dates, for the uncompleted portions of project schedule activities. See also critical path method, critical chain method, and resource leveling." Schedule Network Analysis [Technique]
A measure of schedule efficiency on a project. It is the ratio of earned value (EV) to planned value (PV). The SPI = EV divided by PV. Schedule Performance Index (SPI)
A measure of schedule performance on a project. It is the difference between the earned value (EV) and the planned value (PV). SV = EV minus PV. Schedule Variance (SV)
The point in time that work was scheduled to finish on a schedule activity. The scheduled finish date is normally within the range of dates delimited by the early finish date and the late finish date. It may reflect resource leveling of scarce resources. Scheduled Finish Date (SF)
The point in time that work was scheduled to start on a schedule activity. The scheduled start date is normally within the range of dates delimited by the early start date and the late start date. It may reflect resource leveling of scarce resources. Some Scheduled Start Date (SS)
"The sum of the products, services, and results to be provided as a project. See also project scope and product scope." Scope
"An approved specific version of the detailed scope statement, work breakdown structure (WBS), and its associated WBS dictionary." Scope Baseline
Any change to the project scope. A scope change almost always requires an adjustment to the project cost or schedule. Scope Change
"Adding features and functionality (project scope) without addressing the effects on time, costs, and resources, or without customer approval." Scope Creep
"The document that describes how the project scope will be defined, developed, and verified and how the work breakdown structure will be created and defined, and that provides guidance on how the project scope will be managed and controlled by the project Scope Management Plan [Output/Input]
"Graphic display of cumulative costs, labor hours, percentage of work, or other quantities, plotted against time. Used to depict planned value, earned value, and actual cost of project work. The name derives from the S-like shape of the curve (flatter at S-Curve
A risk that arises as a direct result of implementing a risk response. Secondary Risk
"A provider or supplier of products, services, or results to an organization." Seller
A quantitative risk analysis and modeling technique used to help determine which risks have the most potential impact on the project. It examines the extent to which the uncertainty of each project element affects the objective being examined when all oth Sensitivity Analysis
The process of identifying and documenting relationships among the project activities. Sequence Activities [Process]
"A simulation uses a project model that translates the uncertainties specified at a detailed level into their potential impact on objectives that are expressed at the level of the total project. Project simulations use computer models and estimates of ris Simulation
Also called float. See total float and free float. Slack
"A source of variation that is not inherent in the system, is not predictable, and is intermittent. It can be assigned to a defect in the system. On a control chart, points beyond the control limits, or non-random patterns within the control limits, indic Special Cause
"A document that specifies, in a complete, precise, verifiable manner, the requirements, design, behavior, or other characteristics of a system, component, product, result, or service and, often, the procedures for determining whether these provisions hav Specification
"The area, on either side of the centerline, or mean, of data plotted on a control chart that meets the customer's requirements for a product or service. This area may be greater than or less than the area defined by the control limits. See also control l Specification Limits
"The person or group that provides the financial resources, in cash or in kind, for the project." Sponsor
"The document that describes when and how human resource requirements will be met. It is contained in, or is a subsidiary plan of, the human resource plan." Staffing Management Plan
"Person or organization (e.g., customer, sponsor, performing organization, or the public) that is actively involved in the project, or whose interests may be positively or negatively affected by execution or completion of the project. A stakeholder may al Stakeholder
"A document that provides, for common and repeated use, rules, guidelines, or characteristics for activities or their results, aimed at the achievement of the optimum degree of order in a given context." Standard
"A point in time associated with a schedule activity's start, usually qualified by one of the following: actual, planned, estimated, scheduled, early, late, target, baseline, or current." Start Date
The logical relationship where completion of the successor schedule activity is dependent upon the initiation of the predecessor schedule activity. See also logical relationship. Start-to-Finish (SF)
The logical relationship where initiation of the work of the successor schedule activity depends upon the initiation of the work of the predecessor schedule activity. See also logical relationship. Start-to-Start (SS)
"A narrative description of products, services, or results to be supplied. " Statement of Work (SOW)
"This information gathering technique examines the project from the perspective of each project's strengths, weaknesses, opportunities, and threats to increase the breadth of the risks considered by risk management." "Strengths, Weaknesses, Opportunities, and Threats (SWOT) Analysis"
"A subdivision (fragment) of a project schedule networkdiagram, usually representing a subproject or a work package. Often used to illustrate or study some potential or proposed schedule condition, such as changes in preferential schedule logic or project Subnetwork
A subdivision of a phase. Subphase
A smaller portion of the overall project created when a project is subdivided into more manageable components or pieces. Subproject
"The schedule activity that follows a predecessor activity, as determined by their logical relationship." Successor Activity
"A group of related schedule activities aggregated at some summary level, and displayed reported as a single activity at that summary level. See also subproject and subnetwork." Summary Activity
See project team members. Team Members
A performance measurement technique that compares technical accomplishments during project execution to the project management plan's schedule of planned technical achievements. It may use key technical parameters of the product produced by the project as Technical Performance Measurement [Technique]
"A defined systematic procedure employed by a human resource to perform an activity to produce a product or result or deliver a service, and that may employ one or more tools." Technique
"A partially complete document in a predefined format that provides a defined structure for collecting, organizing, and presenting information and data." Template
"A condition or situation unfavorable to the project, a negative set of circumstances, a negative set of events, a risk that will have a negative impact on a project objective if it occurs, or a possibility for negative changes. Contrast with opportonity. Threat
"An analytical technique that uses three cost or duration estimates to represent the optimistic, most likely, and pessimistic scenarios.This technique is applied to improve the accuracy of the estimates of cost or duration when the underlying activity or Three-Point Estimate [Technique]
"A cost, time, quality, technical, or resource value used as a parameter, and which may be included in product specifications. Crossing the threshold should lrigger some action, such as generating an exception report." Threshold
"A type of contract that is a hybrid contractual arrangement containing aspects of both cost-reimbursable and fixed-price contracts. Time and material contracts resemble costreimbursable type arrangements in that they have no definitive end, because the f Time and Material (T&M) Contract
"Any project schedule network diagram drawn in such a way that the positioning and length of the schedule activity represents its duration. Essentially, it is a bar chart that includes schedule network logic." Time-Scaled Schedule Network Diagram [Tool]
"The calculated projection of cost performance that must be achieved on the remaining work to meet a specified management goal, such as the budget at completion (BAC) or the estimate at completion (EAC). It is the ratio of ""remaining work"" to the ""fund To-Complete-Performance-Index (TCPI)
"Something tangible, such as a template or software program, used in performing an activity to produce a product or result." Tool
"The total amount of time that a schedule activity may be delayed from its early start date without delaying the project finish date, or violating a schedule constraint. Calculated using the critical path method technique and determining the difference be Total Float
"An analytical technique that uses mathematical models to forecast future outcomes based on historical results. It is a method of determining the variance from a baseline of a budget, cost, schedule, or scope parameter by using prior progress reporting pe Trend Analysis [Technique]
Indications that a risk has occurred or is about to occur. Triggers may be discovered in the risk identification process and watched in the risk monitoring and control process. Triggers are sometimes called risk symptoms or warning signs. Triggers
"The assurance that a product, service, or system meets the needs of the customer and other identified stakeholders. It often involves acceptance and suitability with external customers. Contrast with verification." Validation
"An approach used to optimize project life cycle costs, save time, increase profits, improve quality, expand market share, solve problems, and/or use resources more effectively." Value Engineering
"A quantifiable deviation, departure, or divergence away from a known baseline or expected value." Variance
"A method for resolving the total variance in the set of scope, cost, and schedule variables into specific component variances that are associated with defined factors affecting the scope, cost, and schedule variables." Variance Analysis [Technique]
"The evaluation of whether or not a product, service, or system complies with a regulation, requirement, specification, or imposed condition. It is often an internal process. Contrast with validation." Verification
The process of formalizing acceptance of the completed project deliverables. Verify Scope [Process]
A group of persons with a shared objective who fulfill their roles with little or no time spent meeting face to face. Various forms of technology are often used to facilitate communication among team members. Virtual teams can be comprised of persons sepa Virtual Team
"A planning technique used to provide products, services, and results that truly reflect customer requirements by translating those customer requirements into the appropriate technical requirements for each phase of project product development." Voice of the Customer
"A permission and direction, typically written, to begin work on a specific schedule activity or work package or control account. It is a method for sanctioning project work to ensure that the work is done by the identified organization, at the right time Work Authorization
"A subsystem of the overall project management system. It is a collection of formal documented procedures that defines how project work will be authorized (committed) to ensure that the work is done by the identified organization, at the right time, and i Work Authorization System [Tool]
A deliverable-oriented hierarchical decomposition of the work to be executed by the project team to accomplish the project objectives and create the required deliverables. It organizes and defines the total scope of the project. Work Breakdown Structure (WBS) [Output/Input]
An entry in the work breakdown structure that can be at any level. Work Breakdown Structure Component
A document that describes each component in the work breakdown structure (WBS). For each WBS component, the WBS dictionary includes a brief definition of the scope or statement of work, defined deliverable(s), a list of associated activities, and a list o Work Breakdown Structure Dictionary [Output/Input]
A deliverable or project work component at the lowest level of each branch of the work breakdown structure. See also control account. Work Package
lnformation and data, on the status of the project schedule activities being performed to accomplish the project work, collected as part of the direct and manage project execution processes. lnformation includes: status of deliverables; implementation sta Work Performance lnformation [Output/Input]
A response to a negative risk that has occurred. Distinguished from contingency plan in that a workaround is not planned in advance of the occurrence of the risk event. Workaround [Technique]
Created by: esposmp
Popular Standardized Tests sets

 

 



Voices

Use these flashcards to help memorize information. Look at the large card and try to recall what is on the other side. Then click the card to flip it. If you knew the answer, click the green Know box. Otherwise, click the red Don't know box.

When you've placed seven or more cards in the Don't know box, click "retry" to try those cards again.

If you've accidentally put the card in the wrong box, just click on the card to take it out of the box.

You can also use your keyboard to move the cards as follows:

If you are logged in to your account, this website will remember which cards you know and don't know so that they are in the same box the next time you log in.

When you need a break, try one of the other activities listed below the flashcards like Matching, Snowman, or Hungry Bug. Although it may feel like you're playing a game, your brain is still making more connections with the information to help you out.

To see how well you know the information, try the Quiz or Test activity.

Pass complete!
"Know" box contains:
Time elapsed:
Retries:
restart all cards