LEED-NC
LEED-NC Sustainable Sites
Question | Answer |
---|---|
"SS" stands for? | Sustainable Sites |
The intent is to control sediment during construction. | SS Pre 1: Construction Activity Pollution Prevention. |
What are the options of SS Pre 1? | Opt. 1: Erosion sediment control plan to meet the 2003 EPA General Construction Permit(GCP); Option 2 is an erosion control plan to meet or local codes, whichever is more stringent; Some strategies include BMP's (silt fencing, mulching, seeding, basins) |
What type of restricted sites can you not develop on per SS1: Site Selection? | 1. Farmland as defined by USDA 7CFR (currently used as farmland & able to support crop & animal farming); 2. previously undeveloped w/in 5' above FEMA flood |