Task 2-1 FLT PCG
EAFB DATCF FLT Block 2
Question | Answer |
---|---|
DATCF facility generator is located... | South side of the building outside |
Who determines which ATCALS and ATC communications facilities require generators | OG/CC |
At a minimum, ensure all NAS facilities are in compliance with what manual | FAAO JO 6950.2 |
What facilities should be considered for generator installation | NAVAIDs, radar and tower facilities and TX, RX and Ground Air Transmitter Receiver (GATR)sites |
Where should auxiliary power requirements be included | AOI |
Units should consider placing ATCALS facilities on backup generator power for | impending severe weather conditions when commercial power is unreliable or automatic start and transfer capability is not available |
Include auxiliary power procedures for all ATCALS facilities in what document | LOP |
Prior to switching power sources, maintenance personnel must obtain approval from... | NAVAID monitoring facility for NAVAIDS, affected ATC facilities at TX/RX sites and Control Tower |
Who ensures that the power changeover checklist is completed prior to changeover | WS |
Who checks the generator and how often | CE / Monthly |
Who and when does the time checks in regards to power failure/changeover | CD or WS / as soon as possible |