Busy. Please wait.
or

show password
Forgot Password?

Don't have an account?  Sign up 
or

Username is available taken
show password

why


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
We do not share your email address with others. It is only used to allow you to reset your password. For details read our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.
Don't know
Know
remaining cards
Save
0:01
To flip the current card, click it or press the Spacebar key.  To move the current card to one of the three colored boxes, click on the box.  You may also press the UP ARROW key to move the card to the "Know" box, the DOWN ARROW key to move the card to the "Don't know" box, or the RIGHT ARROW key to move the card to the Remaining box.  You may also click on the card displayed in any of the three boxes to bring that card back to the center.

Pass complete!

"Know" box contains:
Time elapsed:
Retries:
restart all cards
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how

Task 2-1 FLT PCG

EAFB DATCF FLT Block 2

QuestionAnswer
DATCF facility generator is located... South side of the building outside
Who determines which ATCALS and ATC communications facilities require generators OG/CC
At a minimum, ensure all NAS facilities are in compliance with what manual FAAO JO 6950.2
What facilities should be considered for generator installation NAVAIDs, radar and tower facilities and TX, RX and Ground Air Transmitter Receiver (GATR)sites
Where should auxiliary power requirements be included AOI
Units should consider placing ATCALS facilities on backup generator power for impending severe weather conditions when commercial power is unreliable or automatic start and transfer capability is not available
Include auxiliary power procedures for all ATCALS facilities in what document LOP
Prior to switching power sources, maintenance personnel must obtain approval from... NAVAID monitoring facility for NAVAIDS, affected ATC facilities at TX/RX sites and Control Tower
Who ensures that the power changeover checklist is completed prior to changeover WS
Who checks the generator and how often CE / Monthly
Who and when does the time checks in regards to power failure/changeover CD or WS / as soon as possible