Construction Processes.
Quiz yourself by thinking what should be in
each of the black spaces below before clicking
on it to display the answer.
Help!
|
|
||||
---|---|---|---|---|---|
6 things that an Engineer should check when he inspects an Excavation. | show 🗑
|
||||
Traditional Procurement, who is the contract between. | show 🗑
|
||||
3 main insitu site investigations methods and which is used in rock | show 🗑
|
||||
Disadvantages of using Sheet Piles. | show 🗑
|
||||
Difference between Secant Piling and Contiguous Piling | show 🗑
|
||||
show | Powerful breaker mounted on excavator
powerful excavator with rock bucket.
🗑
|
||||
show | Work should be regulated
Risk Assessment must be carried out by designers and contractors.
🗑
|
||||
To ensure safety of a construction worker, name 2 works that must be carried out. | show 🗑
|
||||
show | Because they allow for uncertainty in the design process.
or
Because they provide a design margin over the theoretical design capacity.
🗑
|
||||
list 6 items to check when pouring a re- inforced concrete foundations. | show 🗑
|
||||
show | How long to make them. (i.e. knowing what length to make them is a design issue)
Solution would be to use segmental piles 2 to 5 metres in length.
🗑
|
||||
show | Expansion Joints - Designer
Contraction Joints - Designer
Construction Joints - Contractor.
🗑
|
||||
6 items the temporary works designer should consider when designing form-work for a wall pour | show 🗑
|
||||
show | Extreme weathering Conditions.
🗑
|
||||
show | They are taken for 6 months to see if there are any changes in the groundwater levels, this is then used for designing de-watering methods of excavations.
🗑
|
||||
show | Sump Pumping
Well Point System.
🗑
|
||||
show | Excavating Slurry trenches.
Diaphragm walls,
Pressure grouting
🗑
|
||||
4 Hazards a concrete gang could face, when using a skip to pour concrete into a reinforced concrete foundation. | show 🗑
|
||||
4 Factors (non structural factors) that you would investigate before designing a road bridge over the river avon | show 🗑
|
||||
show | Bats Badges Water-voles Reptieles Amphibians Nesting Brids Tree protection Hadgerows Noxious & Invasive Plants
🗑
|
||||
show | Identification of need Veriification of need Assessment of options Outline Design Detailed Design Tender & Award of construction Project Delivery OPtimisation
🗑
|
||||
show | Local Authority Environmental Regulation Health & Saftey Execitives Water & sewage Provider Heritage Bodies Nature conservation organisations
🗑
|
||||
show | 1. Agreement - Offer and Acceptance 2. Consideration 3. Intention to create a legal Relationship 4. Legal capacity to make the contract
🗑
|
||||
What Is a Standard Froem of contract such as NEC3 Engineering | show 🗑
|
||||
Four Advantages of a Standard Form of Contract. | show 🗑
|
||||
show | Notifiable projects are those which last longer than 30 days or involve more than 500 people in construction work.
🗑
|
||||
show | To advise the client on Health and Safety issues during the Design and Planning phases of Construction work.
🗑
|
||||
show | To plan, manage and co-ordinate Health and Safety while construction work is being undertaken.
🗑
|
||||
show | Ground water could make our structures float.
Danger of drowning.
It could cost money.
Flood our excavations/trenches/pits.
🗑
|
||||
On a Drawing of a tank, you specify the diameter to be 12000 metres, is this a term of the Contract? | show 🗑
|
||||
show | Drawings are specifications for the contractor, so they visualize the finished project.
🗑
|
||||
You are the Contractor's Project Manager on a new tower block project. What safety provisions would you make for workers Constructing the third floor to prevent "falls from height" | show 🗑
|
Review the information in the table. When you are ready to quiz yourself you can hide individual columns or the entire table. Then you can click on the empty cells to reveal the answer. Try to recall what will be displayed before clicking the empty cell.
To hide a column, click on the column name.
To hide the entire table, click on the "Hide All" button.
You may also shuffle the rows of the table by clicking on the "Shuffle" button.
Or sort by any of the columns using the down arrow next to any column heading.
If you know all the data on any row, you can temporarily remove it by tapping the trash can to the right of the row.
To hide a column, click on the column name.
To hide the entire table, click on the "Hide All" button.
You may also shuffle the rows of the table by clicking on the "Shuffle" button.
Or sort by any of the columns using the down arrow next to any column heading.
If you know all the data on any row, you can temporarily remove it by tapping the trash can to the right of the row.
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.
Normal Size Small Size show me how
Normal Size Small Size show me how
Created by:
frantost
Popular Engineering sets