Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.

PMP Chapter 6

Quiz yourself by thinking what should be in each of the black spaces below before clicking on it to display the answer.
        Help!  

Question
Answer
A previous project that can be adapted for the current project complete with forms that are pre-populated with organizational specific information are called (BLANK).   Template  
🗑
Planning the immediate portions of the project in detail and the future portions at a higher level is known as (BLANK).   Rolling Wave Planning  
🗑
The work package, which is the smallest component in the WBS, is further broken down into (BLANK) which includes labor managing project time.   Schedule Activites  
🗑
True or False - Since activities are directly derived from the work packages, no activity should fall outside of the project scope.   True - Activities should be created directly from the WBS (Scope Baseline).  
🗑
What are the 3 outputs of the Process 6.2 Define Activities?   1. The Activity List 2. Activity Attributes 3. Milestone List  
🗑
To ensure the project team has detailed information, each activity is further defined. An identifying number, the preceding and succeeding activities and/or the leads and lags may be included, as well as other info. These are called (BLANK)   Activity Attributes  
🗑
Also known as Mandatory Dependency, this term describes activities that must happen in a particular order. For instance, the dirt must be excavated before the foundation can be built.   Hard Logic  
🗑
Requiring that the painting activity be completed prior to the start of the carpeting installation activity is an example of which PDM activity relationship?   Finish to Start  
🗑
Activities in the (BLANK) have no float and sum to the project duration.   Critical Path  
🗑
True or False - There can be more than one critical path.   True  
🗑
A form of schedule compression that adds resources to an activity on the critical path in an effort to complete rapidly.   Crashing  
🗑
Relying on historical information to predict what current activity durations should be is known as what?   Analogous estimating  
🗑
What are the three estimates that comprise a 3-Point Estimate?   Optimistic, Most Likely and Pessimisstic  
🗑
True or False - 3-Point Averaging should fall closer to the "Most Likely" estimate than PERT.   False - PERT weighs the "Most Likely" estimate 4 times more than optimistic or pessimistic.  
🗑
Positive Time that moves two or more activities further apart and is also known as "waiting" is (BLANK)   Lag time  
🗑
Process 6.7 Schedule Control feeds change requests to what other Project Management Process and Code of Accounts?   4.5 Integrated Change Control  
🗑
(BLANK) works to modify the project schedule based on the availability of resources rather than activity sequencing.   CCM or Critical Chain Method  
🗑
Crashing adds resources to an activity but it also adds (BLANK).   Cost  
🗑


   

Review the information in the table. When you are ready to quiz yourself you can hide individual columns or the entire table. Then you can click on the empty cells to reveal the answer. Try to recall what will be displayed before clicking the empty cell.
 
To hide a column, click on the column name.
 
To hide the entire table, click on the "Hide All" button.
 
You may also shuffle the rows of the table by clicking on the "Shuffle" button.
 
Or sort by any of the columns using the down arrow next to any column heading.
If you know all the data on any row, you can temporarily remove it by tapping the trash can to the right of the row.

 
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how
Created by: lapetti
Popular Computers sets