PSU PLC EXAM1 Test

Enter the letter for the matching Answer
incorrect
1.
What is the instruction SUB
incorrect
2.
A communication driver is made using
incorrect
3.
When in RUN Mode
incorrect
4.
What are the parts of a Counter Structure
incorrect
5.
What is the instruction MUL
incorrect
6.
What is the instruction ADD
incorrect
7.
What is the instruction OTE
incorrect
8.
What is the instruction LEQ
incorrect
9.
Controller Tags are ____________ while Task Tags or Parameters are __________________
incorrect
10.
What are the conditions for Compatible Module
incorrect
11.
What is the instruction OTU
incorrect
12.
The name of a tag is based on
incorrect
13.
If you have too many tasks then
incorrect
14.
What is the instruction OTL
incorrect
15.
What is the instruction TON
incorrect
16.
To share controller time between tasks...
incorrect
17.
How many tasks can the Logix 5000 controller run at a time?
incorrect
18.
Can operators be used to specify the subscript of an array
incorrect
19.
What is the Preset of a counter
incorrect
20.
If a periodic or event task is triggered while another task is running, the __________ of each task indicates what the controller should do.
A.
Linx-based software (RSLinx Classic Gateway)
B.
Output Latch -(L)- (Set a bit retentive)
C.
Timer On Delay (Time how long a timer is enabled)
D.
The continuous task may take too long to complete
E.
features like online editing, program downloads, and firmware updates are prohibited
F.
Global data, Local data
G.
Multiply (Has Source A, Source B, and Destination )
H.
1
I.
Output Energize -( )- (Set a bit)
J.
Priority
K.
The value to reach before done
L.
Less Than or Equal to (Has source A and source B)
M.
Add (Has Source A, Source B, and Destination )
N.
Subtract (Has Source A from which it subtracts Source B, and Destination )
O.
.CD or .CU (Countdown/up enable bit), .DN (The done bit) , .OV, (Overflow bit), .UN (Underflow bit), .PRE (Preset value), value to reach, .ACC (The accumulated value)
P.
• Same catalog number • Same or higher Major Revision • Minor Revision as follows: – If the Major Revision is the same, the Minor Revision must be the same or higher. – If the Major Revision is higher, the Minor Revision can be any number.
Q.
Output Unlatch -(U)- (clear a bit retentive)
R.
Give them the same priority level, and it will switch back and forth every 1 ms
S.
YES
T.
The location of the I/O module in the system
Type the Answer that corresponds to the displayed Question.
incorrect
21.
Connections to the SA power bus use
incorrect
22.
Our DC Output I/O Card
incorrect
23.
If you want a section of your logic to run immediately when an event occurs use
incorrect
24.
What does HMI stand for?
incorrect
25.
Our DC Input I/O Card
incorrect
26.
Our Analog Output I/O Card
incorrect
27.
If you want a section of your logic to run all the time use
incorrect
28.
Our Analog Input I/O Card
incorrect
29.
How many Priority Levels does the CompactLogix have?
incorrect
30.
A/An ____________ lets you create one tag that represents another

Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how
Created by: francisman90
Popular Engineering sets