Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password

Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.

PSU PLC EXAM1 Test

Enter the letter for the matching Answer
incorrect
1.
Controllers can operate in more complex systems via...
incorrect
2.
What does PLC stand for?
incorrect
3.
If you have too many tasks then
incorrect
4.
What are the parts of a Counter Structure
incorrect
5.
Our DC Output I/O Card
incorrect
6.
A/An ____________ lets you create one tag that represents another
incorrect
7.
What PLC does our class use?
incorrect
8.
What is the minimum memory allocation for a Tag
incorrect
9.
When in RUN Mode
incorrect
10.
What is the instruction OTE
incorrect
11.
The Logix 5000 controller uses connections to transmit I/O data. These connections can be
incorrect
12.
What does Electronic Keying do?
incorrect
13.
Our Analog Output I/O Card
incorrect
14.
What is the instruction OTL
incorrect
15.
Our DC Input I/O Card
incorrect
16.
What is the instruction CTU
incorrect
17.
What are the 3 Keying options?
incorrect
18.
The name of a tag is based on
incorrect
19.
What are the 4 Tag Types
incorrect
20.
Use a __________ to override data that your logic either uses or produces.
A.
Direct Connections or Rack-Optimized Connection
B.
Programmable Logic Controller
C.
Output Latch -(L)- (Set a bit retentive)
D.
features like online editing, program downloads, and firmware updates are prohibited
E.
4 bytes
F.
Output Energize -( )- (Set a bit)
G.
Compatible Module, Disable Keying, Exact Match
H.
The continuous task may take too long to complete
I.
5069-OF4
J.
.CD or .CU (Countdown/up enable bit), .DN (The done bit) , .OV, (Overflow bit), .UN (Underflow bit), .PRE (Preset value), value to reach, .ACC (The accumulated value)
K.
Alias Tag
L.
reduces the possibility that you use the wrong device in a control system
M.
CompactLogix 5380 (5069 L306ERM)
N.
5069-OB16
O.
5069-IB16F
P.
Base, Alias, Produced, Consumed
Q.
The location of the I/O module in the system
R.
Force
S.
Count Up
T.
EtherNet or IP network
Type the Answer that corresponds to the displayed Question.
incorrect
21.
an __________ creates multiple instances of a data type under a common tag name
incorrect
22.
If you want a section of your logic to run at a constant period or multiple times within the scan of your other logic use
incorrect
23.
What does HMI stand for?
incorrect
24.
How many Priority Levels does the CompactLogix have?
incorrect
25.
A different task can __________ a task that is running and take control.
incorrect
26.
What is used to update the firmware
incorrect
27.
If you want a section of your logic to run all the time use
incorrect
28.
Our Analog Input I/O Card
incorrect
29.
If you want a section of your logic to run immediately when an event occurs use
incorrect
30.
If a periodic or event task is triggered while another task is running, the __________ of each task indicates what the controller should do.

Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how
Created by: francisman90
Popular Engineering sets