CDC Vol 2
Help!
|
|
||||
---|---|---|---|---|---|
who monitors a units manning | show 🗑
|
||||
show | unit personnel management roster
🗑
|
||||
what quantity do allowance standards provide for you to perform your mission | show 🗑
|
||||
show | allowance standard retrieval system (ASRS)
🗑
|
||||
what type of support agreement is made between AF and Navy detachment | show 🗑
|
||||
which item is one of the agreed upon areas of responsibility present on a functional moa/mou | show 🗑
|
||||
what role do computer systems play in cost accounting | show 🗑
|
||||
which cost account is used for 'utilities' | show 🗑
|
||||
show | 50000
🗑
|
||||
what status code is always assigned to '99999' | show 🗑
|
||||
show | to check they are entering the correct code
🗑
|
||||
which section is responsible for the maintenance of customer account codes | show 🗑
|
||||
show | operations management and resources flight
🗑
|
||||
the CWON numbers are used to authorize work that is | show 🗑
|
||||
show | cleaning storm drains
🗑
|
||||
when can a shop be deleted from a CWON | show 🗑
|
||||
show | evenly among assigned facilities
🗑
|
||||
which form is used to initially to request a service contract | show 🗑
|
||||
what is included in a performance work statement to provide incentives to perform the work in a cost effective manner | show 🗑
|
||||
how are minimum and maximum quantity limits specified in a basic IDIQ contract | show 🗑
|
||||
show | technical proposals
🗑
|
||||
simplified aquisition of base engineering requirements(SABER) expedite the CE squadron contract execution by reducing | show 🗑
|
||||
what is used to develop detailed cost estimates for work to be performed by SABER contract | show 🗑
|
||||
show | work request review board (WRRB)
🗑
|
||||
show | AF peronnel who can best attest to the products benefits
🗑
|
||||
how long does the VEMSO product evaluation period last | show 🗑
|
||||
at what point does VEMSO send a formal report to the manufacturer stating the test results | show 🗑
|
||||
what is a comprehensive collection of records for real property installed equipment not tied to a building | show 🗑
|
||||
show | facilty files, annotate when the facility is going to torn down
🗑
|
||||
what key item do facility files lack | show 🗑
|
||||
show | facility manager
🗑
|
||||
show | form 1348 single line item release
🗑
|
||||
show | risk assesment
🗑
|
||||
show | approving authority
🗑
|
||||
where are the criteria for determing the priority of work found | show 🗑
|
||||
show | J
🗑
|
||||
show | 2
🗑
|
||||
which work priority is given to a WO that is assigned a risk assesment code of 5 or a fire deficiency code of 4 or 5 | show 🗑
|
||||
show | 5
🗑
|
||||
show | 15
🗑
|
||||
show | shop supervisor
🗑
|
||||
show | resources and housing management
🗑
|
||||
show | required completion date
🗑
|
||||
show | real property
🗑
|
||||
show | in writing by the commander
🗑
|
||||
what factor allows the IWIMS end of session to programatically change the work order staus to 'c' | show 🗑
|
||||
show | 5
🗑
|
||||
show | does not require detailed planning
🗑
|
||||
any work request that upgrades, replaces, or installs a sytems to real property may need to | show 🗑
|
||||
resources should never be charged to | show 🗑
|
||||
show | A, J, W, X
🗑
|
||||
show | shop supervisor
🗑
|
||||
who normally chair the WRRB | show 🗑
|
||||
show | AF 327
🗑
|
||||
during which part of the work process must excess materials be dealt with | show 🗑
|
||||
when can a work order be cancelled | show 🗑
|
||||
show | tracking
🗑
|
||||
which IWIMS log provides a history of the upgrade or downgrade of a work requirement | show 🗑
|
||||
show | reports
🗑
|
||||
show | materials are delivered 45 days priorty estimated start date
🗑
|
||||
based on DSW priorities who assigns a required delivery date to a work order | show 🗑
|
||||
how many duty days before the 1st of the month must the 1st future month if the in-service work plan (IWP) schedule be final programmed and approved | show 🗑
|
||||
how is each in-service IWP record identified | show 🗑
|
||||
which coloumn of the main IWP screen is automatically populated with man-hour availability estimates that are based in historical labor data | show 🗑
|
||||
what are some of the reasons that would require reprogramming of the available man-hours for each shop | show 🗑
|
||||
which report provides a summary of where each shop spends it's man-hours for a specific time period | show 🗑
|
||||
when updating the shop IWP man-hours the estimated completion date must be set to which of the following | show 🗑
|
||||
what is the 1st step to building the IWP schedules | show 🗑
|
||||
what should be adjusted to make sure the available man-hours are calculated correctly when building IWP schedules | show 🗑
|
||||
show | personnel gains/losses and projected leaves
🗑
|
||||
the final approving/programming of the total IWP by month reportmust be approved by the operations flight commander no later than | show 🗑
|
||||
show | 2
🗑
|
||||
when should you enter the a weekly schedule into IWIMS | show 🗑
|
||||
show | 561
🗑
|
||||
the IWIMS weekly work schedule has how many parts | show 🗑
|
||||
show | part 1, page 2
🗑
|
||||
which recurring work program (RWP) actio code is used to indicate a job has been deferred for materials | show 🗑
|
||||
which LUC indicates a worker is being loaned to an exception time accounting cost center | show 🗑
|
||||
show | add the person temporarily from the labor program
🗑
|
||||
show | performance
🗑
|
||||
show | cost reports
🗑
|
||||
show | methods analysis
🗑
|
||||
which analysis tool is used for assessing the productivity of a group within the maintenance process | show 🗑
|
||||
show | service related
🗑
|
||||
the main purpose of RWP is to | show 🗑
|
||||
what analysis method is used to evaluate preventative maintenance vs. breakdown maintenance | show 🗑
|
||||
who normally provides the estimated life span on equipment | show 🗑
|
||||
show | man-hour ceiling/priority analysis
🗑
|
||||
varience analysis mostly pertains to | show 🗑
|
||||
who conducts a variance analysis to identify and reduce or eliminate system and shop efficiencies | show 🗑
|
Review the information in the table. When you are ready to quiz yourself you can hide individual columns or the entire table. Then you can click on the empty cells to reveal the answer. Try to recall what will be displayed before clicking the empty cell.
To hide a column, click on the column name.
To hide the entire table, click on the "Hide All" button.
You may also shuffle the rows of the table by clicking on the "Shuffle" button.
Or sort by any of the columns using the down arrow next to any column heading.
If you know all the data on any row, you can temporarily remove it by tapping the trash can to the right of the row.
To hide a column, click on the column name.
To hide the entire table, click on the "Hide All" button.
You may also shuffle the rows of the table by clicking on the "Shuffle" button.
Or sort by any of the columns using the down arrow next to any column heading.
If you know all the data on any row, you can temporarily remove it by tapping the trash can to the right of the row.
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.
Normal Size Small Size show me how
Normal Size Small Size show me how
Created by:
TiffanyVictoria
Popular Engineering sets