Save
Upgrade to remove ads
Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.
focusNode
Didn't know it?
click below
 
Knew it?
click below
Don't Know
Remaining cards (0)
Know
0:00
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how

CM Ch. 2

Construction Management Vocab

TermDefinition
Architectural programming Research and decision‐making process, initiated by an owner, usually with help of an architect that identifies the basic needs of the client and parameters of the project to be designed and built by a construction professional
Constructability reviews Process in which contractors and construction managers work with designers to ensure that the details of the design can be built in efficiently and cost‐effectively
Construction management Planning, scheduling, evaluation, and controlling of construction tasks and activities to accomplish specific objectives outlined in the contract
Integrated form of agreement Aka IFOA; multiparty agreement that includes the owner, designer, and constructor as signatories to the same construction contract
Integrated project delivery Any project delivery method that contractually engages the contractor at the beginning of the design process
Multiple prime Owner bypasses the use of a general contractor and enters into multiple separate contracts such as concrete, framing, mechanical, and electrical work. Each specialty contractor involved becomes a prime contractor on the project
Progressive design–build Allows the owner and the design‐builder to engage even earlier than would happen under a typical design–build contract
Scope of work Parameters defining the overall extent of work to be included in a construction contract
Value engineering Approaches are considered regarding design, product selection, or building to provide the most efficient, cost‐effective solution
Created by: taylorstudies
Popular Public Safety sets

 

 



Voices

Use these flashcards to help memorize information. Look at the large card and try to recall what is on the other side. Then click the card to flip it. If you knew the answer, click the green Know box. Otherwise, click the red Don't know box.

When you've placed seven or more cards in the Don't know box, click "retry" to try those cards again.

If you've accidentally put the card in the wrong box, just click on the card to take it out of the box.

You can also use your keyboard to move the cards as follows:

If you are logged in to your account, this website will remember which cards you know and don't know so that they are in the same box the next time you log in.

When you need a break, try one of the other activities listed below the flashcards like Matching, Snowman, or Hungry Bug. Although it may feel like you're playing a game, your brain is still making more connections with the information to help you out.

To see how well you know the information, try the Quiz or Test activity.

Pass complete!
"Know" box contains:
Time elapsed:
Retries:
restart all cards