Save
Upgrade to remove ads
Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.
focusNode
Didn't know it?
click below
 
Knew it?
click below
Don't Know
Remaining cards (0)
Know
0:00
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how

CM Ch.2

Construction Management

QuestionAnswer
Construction management as a function Does tasks performed by the contractor, like estimating, scheduling, cost control, and contract administration
Construction management as a project delivery method - Contractual arrangement where the - Construction manager is hired by owner - Does design review, overall scheduling, cost control, value engineering, constructability reviews, and construction coordination
3 characteristics that make the construction industry unique - One‐of‐a‐kind - Building occurs outside - Work is done by human hand
4 Primary project values time, cost, quality, and safety
Why is scope definition so important in the construction process? describes the extent of work to be performed by contractor
What does project delivery mean? Overall structure or organizational framework to put all aspects of designing and building a project together
Identify the 4 primary project delivery methods and how they differ Design-Bid-Build: traditional, owner has separate contracts with designer and contractor Design-Build: 1 contract between owner and design-build entity CM at-risk: Owner holds two contracts one with CM and with designer IPD: single multiparty agreement
Agency CM vs. CM at risk at-risk is financially invested and in decision phase, agency oversees everything without performing the work themselves
What is fast-tracking? Speeding up the completion of a construction project by overlapping the design and construction processes
3 basic ways in which a design‐build entity may be configured - Contractor and designer have informal agreement - Full‐service design‐build firm (same company) - Legal joint venture between the designer and contractor
10 functions of construction management. Manage the team/project quality/project safety/project risk/jobsite Preconstruction services Estimate project contact administration Plan and schedule project Control project performance
Created by: taylorstudies
Popular Public Safety sets

 

 



Voices

Use these flashcards to help memorize information. Look at the large card and try to recall what is on the other side. Then click the card to flip it. If you knew the answer, click the green Know box. Otherwise, click the red Don't know box.

When you've placed seven or more cards in the Don't know box, click "retry" to try those cards again.

If you've accidentally put the card in the wrong box, just click on the card to take it out of the box.

You can also use your keyboard to move the cards as follows:

If you are logged in to your account, this website will remember which cards you know and don't know so that they are in the same box the next time you log in.

When you need a break, try one of the other activities listed below the flashcards like Matching, Snowman, or Hungry Bug. Although it may feel like you're playing a game, your brain is still making more connections with the information to help you out.

To see how well you know the information, try the Quiz or Test activity.

Pass complete!
"Know" box contains:
Time elapsed:
Retries:
restart all cards