CM Ch.2
Construction Management
| Question | Answer |
|---|---|
| Construction management as a function | Does tasks performed by the contractor, like estimating, scheduling, cost control, and contract administration |
| Construction management as a project delivery method | - Contractual arrangement where the - Construction manager is hired by owner - Does design review, overall scheduling, cost control, value engineering, constructability reviews, and construction coordination |
| 3 characteristics that make the construction industry unique | - One‐of‐a‐kind - Building occurs outside - Work is done by human hand |
| 4 Primary project values | time, cost, quality, and safety |
| Why is scope definition so important in the construction process? | describes the extent of work to be performed by contractor |
| What does project delivery mean? | Overall structure or organizational framework to put all aspects of designing and building a project together |
| Identify the 4 primary project delivery methods and how they differ | Design-Bid-Build: traditional, owner has separate contracts with designer and contractor Design-Build: 1 contract between owner and design-build entity CM at-risk: Owner holds two contracts one with CM and with designer IPD: single multiparty agreement |
| Agency CM vs. CM at risk | at-risk is financially invested and in decision phase, agency oversees everything without performing the work themselves |
| What is fast-tracking? | Speeding up the completion of a construction project by overlapping the design and construction processes |
| 3 basic ways in which a design‐build entity may be configured | - Contractor and designer have informal agreement - Full‐service design‐build firm (same company) - Legal joint venture between the designer and contractor |
| 10 functions of construction management. | Manage the team/project quality/project safety/project risk/jobsite Preconstruction services Estimate project contact administration Plan and schedule project Control project performance |