Save
Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.
focusNode
Didn't know it?
click below
 
Knew it?
click below
Don't Know
Remaining cards (0)
Know
0:00
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how

CEM 121

Final

TermDefinition
Addendum A supplemental document, which is issued after the bid documents.
As-Built Drawings Final construction documents, provide precise locations and dimensions for the owner's future use
Base Bid Dollar amount of the GC scope of in a construction bid
Bid documents A bidding package that includes an invitation to bid, the process and requirements to submit a bid
Bulletin Formally issuance of changes to the construction documents after the contract
Certificate of occupancy issued by local government agency or building dept certifying a buildings compliance with applicable building codes and laws
Change order request A proposed change, together with a price for the change order. From the contractor for the owner
Completion, Substantial A specific date, or percentage of the work agreed upon the architect
Conceptual Design Rough layout of building
Construction Document phase Final drawing, specifications of bidding documents
Control Joint Controls the expansion movement in a concrete slab
Dead Load Weight of all fixed items in a building
Double detector check Device that prevents water from backflowing into domestic water system
Easement Right of person or entity to use a piece of property for utilities
General Conditions Cost incurred by a GC for a project specific cost Toilets, power, water
Guaranteed Maximum price Project that is Not to exceed cost and is negotiated between owner and contractor
HVAC Heating, Ventilation, Air Conditioning
Infiltration The process by which air leaks into a building
Liquid Damages Amount agreed upon by two parties to a contract prior to performance where an amount is established for each day of the project is delay beyond original completion date
Mock Up Used to test scale, color, appearance
Notice to Proceed Written authorization issued by owner to the contractor providing approval to proceed with the work
Parapet wall Extension of exterior wall above roof line to screen mechanical equipment
Pre-cast concrete Concrete panel with structural emeds erected onto building
QSD Qualified SWPPP Designer
QSP Qualified SWPPP Practitioner
SWPPP Storm water pollution prevention plan
Created by: jackluna1429
Popular Engineering sets

 

 



Voices

Use these flashcards to help memorize information. Look at the large card and try to recall what is on the other side. Then click the card to flip it. If you knew the answer, click the green Know box. Otherwise, click the red Don't know box.

When you've placed seven or more cards in the Don't know box, click "retry" to try those cards again.

If you've accidentally put the card in the wrong box, just click on the card to take it out of the box.

You can also use your keyboard to move the cards as follows:

If you are logged in to your account, this website will remember which cards you know and don't know so that they are in the same box the next time you log in.

When you need a break, try one of the other activities listed below the flashcards like Matching, Snowman, or Hungry Bug. Although it may feel like you're playing a game, your brain is still making more connections with the information to help you out.

To see how well you know the information, try the Quiz or Test activity.

Pass complete!
"Know" box contains:
Time elapsed:
Retries:
restart all cards