| Term | Definition |
|---|---|
| Addendum | A supplemental document, which is issued after the bid documents. |
| As-Built Drawings | Final construction documents, provide precise locations and dimensions for the owner's future use |
| Base Bid | Dollar amount of the GC scope of in a construction bid |
| Bid documents | A bidding package that includes an invitation to bid, the process and requirements to submit a bid |
| Bulletin | Formally issuance of changes to the construction documents after the contract |
| Certificate of occupancy | issued by local government agency or building dept certifying a buildings compliance with applicable building codes and laws |
| Change order request | A proposed change, together with a price for the change order. From the contractor for the owner |
| Completion, Substantial | A specific date, or percentage of the work agreed upon the architect |
| Conceptual Design | Rough layout of building |
| Construction Document phase | Final drawing, specifications of bidding documents |
| Control Joint | Controls the expansion movement in a concrete slab |
| Dead Load | Weight of all fixed items in a building |
| Double detector check | Device that prevents water from backflowing into domestic water system |
| Easement | Right of person or entity to use a piece of property for utilities |
| General Conditions | Cost incurred by a GC for a project specific cost Toilets, power, water |
| Guaranteed Maximum price | Project that is Not to exceed cost and is negotiated between owner and contractor |
| HVAC | Heating, Ventilation, Air Conditioning |
| Infiltration | The process by which air leaks into a building |
| Liquid Damages | Amount agreed upon by two parties to a contract prior to performance where an amount is established for each day of the project is delay beyond original completion date |
| Mock Up | Used to test scale, color, appearance |
| Notice to Proceed | Written authorization issued by owner to the contractor providing approval to proceed with the work |
| Parapet wall | Extension of exterior wall above roof line to screen mechanical equipment |
| Pre-cast concrete | Concrete panel with structural emeds erected onto building |
| QSD | Qualified SWPPP Designer |
| QSP | Qualified SWPPP Practitioner |
| SWPPP | Storm water pollution prevention plan |