click below
click below
Normal Size Small Size show me how
8.6 NH Final Exam
| Term | Definition |
|---|---|
| Mitigate | Become less harsh or hostile. |
| Precursor | An event that occurs before a natural hazard. |
| Seismometer | An instrument to measure earthquakes. |
| Seismic Resistance Construction | The fabrication of a building or structure that is able to withstand the sudden ground shaking. |
| Levees | An embankment built to prevent the overflow of a river. |
| Mercalli Scale | It is based on observable earthquake damage. (magnitude scale) |
| Enhanced Fujita Scale | Used to assign a tornado a 'rating' based on estimated wind speeds and related damage. |
| Volcanic Explosive index | A scale that describes the size of explosive volcanic eruptions based on magnitude and intensity. |
| Cone of Uncertainty | Represents the probable track of the center of a tropical cyclone. |
| Saffir-Simpson Scale | A Wind Scale that is a 1 to 5 rating based only on a hurricane's maximum sustained wind speed. |
| Monitoring | Observe and check the progress or quality of (something) over a period of time; keep under systematic review. |
| Fault | A crack in the earths crust. |
| Storm Surge | An abnormal rise in seawater level during a storm, measured as the height of the water above the normal predicted astronomical tide. |
| Tectonic Plate Boundary | A boundary between two or more plates. |
| Tectonic Plate | A massive, irregularly shaped slab of solid rock |