ENGR-502 Mod 11 Test
Enter the letter for the matching Answer
| A. time constraints exist
B. sprint goal modification
C. subordinating a system.
D. FalseE. the primary causes of inaccurate duration estimation are behavioral in nature.
F. 2.5 plus or minus 1.5 weeks
G. exploiting a constraint.
H. TrueI. identify the constraint.
|