click below
click below
Normal Size Small Size show me how
PMP
PMP Questions
Question | Answer |
---|---|
What are the outputs of Collect Requirements Process | Requirements Documentation, Requirements Traceability Matrix |
What is Requirements Traceability Matrix | The Requirements Traceability Matrix (RTM) is a document that links requirements throughout the validation process. |
AC | Actual Cost. At the outset of a project, costs are estimated. The AC is tallied at the project’s completion to show the true and final cost of the project. |
CV | Cost Variance. This is a calculation of the project costs that quantifies the difference between the actual cost (AC) and the earned value (EV), as represented by the equation EV – AC = CV. |
What are the types of project management life cycles? | 1- Predictive Life Cycle / Waterfall Model / Fully Plan Driven Life Cycle 2- Iterative and Incremental Life Cycle 3- Adaptive Life Cycle / Change Driven / Agile |
What is the Adaptive/ Change Driven / Agile project life cycle? | phase by phase approach but multiple times. Each iteration will generate a deliverable or a set of deliverables. The outcome could be an instance of the end product which can be improved in further iterations |
What is the Predictive Waterfall Model project life cycle? | In the Waterfall model, the project takes a phase by phase approach whereby the work on each phase is completed before moving onto the next phase. |
What is the Iterative and Incremental project life cycle? | Iterative and incremental development is a discipline for developing systems based on producing deliverables. In incremental development, different parts of the system are developed at various times or rates and are integrated based on their completion. |
Together, the scope, schedule, and cost baselines are called: | Performance Measurement Baseline |
interpersonal and team skills used in the collect requirements process include | nominal group technique observation/conservation facilitation |