click below
click below
Normal Size Small Size show me how
Intro Supply Chain
Chp 9 & 10
| Term | Definition |
|---|---|
| Retailers | they buy and sell |
| Sam Walton | Created the EDLP "Everyday low price" |
| Mutual collaborations | Reduce cost for Mfgr and Walmart |
| VMI | #1 area for collaborations is |
| We can use IM and this way we can write orders how we want. Direct Plant Shipment (DPS) | VMI helps drive down transportation how? |
| OTCF (On Time Case Fill Rate) | cases shipped / cases ordered |
| 99% | Church & Dwight Fill Rate |
| 97% | General Mills Fill Rate |
| Ontime | shipment x cases |
| Drop Lot | Deliver with 24hr period. No live unload |
| Plan, Execute, Control (TMS all of them) | How to Manage |
| TMS, Bidding package, lane volume | Plan thru ??? |
| Allocating order to lowest transportation carrier, TMS load tendering, YMS done | How we execute |
| Tender depth of 1 | We tender orders to carrier within a |
| 1.5 tender depth because cheap, using rail (IM) | Church and Dwight tender depth |
| IM | Use VMI so you get to use this form of transportation |
| Control | On time feedback (carriers say if they weren't on time) |
| Cowan | this form of transportaion is separated from bid because of use of lightweight service |
| PSI, then tender shipment to least cost carrier | Order by |
| 68in high (pallet 6 inches tall), and 2500max lbs/ pallet. 30 pallets max 45,000lbs loadable weight | Max weight for heavy product truckload |
| can double stack (any pallet 54 & less than 750lb light pallet) 108" loadable height | Maximum for light product truckload |
| 48" long by 40" wide. 6inches high | pallet dimensions |
| ocean shipments | take 6-7 weeks |
| Manufacture to DC to Retail's DC finally Stores | transportation journey |
| manual labor | Walmart ships to stores without pallet cause of |
| 2 week production cycle | 1PC, 2 SS, 1 in transit |
| planning warehouse | same side (ship/ receive) move full |
| WMS | Has RF capibility (screen shows workload) |
| Rectangle | Warehouses always this shape |
| Execute YMS | manage spot yard by |
| Control | Labor saving techniques are ways of |
| Church and Dwight | Supply chain done by logistic at |
| Sales | at other companies logistics done by |
| Frequency and Flexibility | 1 week lead time or use VMI. Push to Pull |
| this when you convert to LTL when weight is under | weight X cost for TL / LTL cost |