Help!
|
|
||||
---|---|---|---|---|---|
Which MRCs are requred to be printed out and placed in the MRC deck | show 🗑
|
||||
MIPs/ MRCs that are required but not scheduled | show 🗑
|
||||
show | A check not entry is annotated
🗑
|
||||
Who is responsible for coordinating all adminstrative facets of 3-M program per current directive | show 🗑
|
||||
This control document is used for adminstrative OOC and CAL lables. It provides sequential listings of all OOC and CAL instruments. | show 🗑
|
||||
Who is overall responsible for ensuring maintenance is accomplished following the 3M system | show 🗑
|
||||
show | Deactivated equipment
🗑
|
||||
show | Lost
🗑
|
||||
You may see the acronym NMR on your LOEP, what does it mean | show 🗑
|
||||
Who reviews and approves all spit MIPs | show 🗑
|
||||
show | OPNAVIST 5100.19
🗑
|
||||
show | Mark the maintenance action as complete in sked immediately upon completion
🗑
|
||||
show | A current safety inspection from the electrical tool issue room
🗑
|
||||
show | DIVO
🗑
|
||||
show | R-1W
🗑
|
||||
show | 3-M planned maintenance system
🗑
|
||||
show | OPNAV INSTRUCTION 5100.28
🗑
|
||||
What imformation is required on the secondary container label | show 🗑
|
||||
What can be used to ensure all future requirements such as tools, parts and test equipment are available for maintenance checks | show 🗑
|
||||
Which chapter of the 5100.19e volume II discusses general safety requirements for ladders, machinery, and stowage of HAZMAT | show 🗑
|
||||
The number assigned to tools, parts, material and test equipment on the MRC which can be referenced to the standard PMS material identifaction guide ( SPMIG) for stock number identification is known as | show 🗑
|
||||
Who can complete weekly close outs of maintenance in the absence of the DIVO | show 🗑
|
||||
Which of the following best describes IEM status I | show 🗑
|
||||
After tag posting is complete, a second person shall | show 🗑
|
||||
A catagory B (technical FBR) is ised for what purpose | show 🗑
|
||||
What day must maintanance be closed ot for the week | show 🗑
|
||||
show | ++
🗑
|
||||
Which of the following is one of the primary 3M responsibilities of the department head | show 🗑
|
||||
Whos responsibility is to review assigned schedule maintenance requirments and perform using MRCs as indicated by the PMS schedule | show 🗑
|
||||
What do the first two numbers of the SYSCOM MRCs Control number indicate | show 🗑
|
||||
show | SYSCOM MRC control number
🗑
|
||||
What color are classified MECs printed on | show 🗑
|
||||
When a line item is filled out in TORS, the Petty Officer in chargen black is signed. The signer, normally the ships force POIC of the work, shall ensure the adequacy and accuracy of the line item. The who mist conduct an independent review | show 🗑
|
||||
show | Submitting a feed back report
🗑
|
||||
If a MRC calls for antag-out with the note “if appilicable”, no check not entry is required if a tag was not hung | show 🗑
|
||||
show | MIPs and MRCs not scheduled that are required
🗑
|
||||
What is IEM status II | show 🗑
|
||||
What does CASREP stand for | show 🗑
|
||||
show | CO
🗑
|
||||
show | Equipment not covered by PMS
🗑
|
||||
Which of the following are not identifications markers on shipboard HAZMAT containers | show 🗑
|
||||
show | Urgent
🗑
|
||||
Which of the following is a responsibility of the department head | show 🗑
|
||||
show | Caution
🗑
|
||||
What does PPE stand for | show 🗑
|
||||
show | WCS
🗑
|
||||
A list of warnings and referances which direct attention to possible hazards to personnel which could result in injury or death while performing maintenance is known as | show 🗑
|
||||
What does TPMTEN stand for | show 🗑
|
||||
In status I IEM, the equipment that will remain on board, is not scheduled for corrective maintenance or overhaul and will be inactive for | show 🗑
|
||||
show | A situational requirment report
🗑
|
||||
show | Feed back report
🗑
|
||||
The international placment of a piece of equipment/ system in a hibernated state for a specific duration with the intention of reactivating at the end of that duration is defined as what | show 🗑
|
||||
What does APL stand for | show 🗑
|
||||
show | Operational risk management
🗑
|
||||
What is the purpose of a MRC | show 🗑
|
||||
In the “ Procedure” block WCSs may line out the non- applicable line items that do not pertain to current equipment/ configuration when step is followed with words “ if applicable” or a note identifying steps to be omitted. These items must be reviewed an | show 🗑
|
||||
show | 3M 301 and if required, completion of departmental qualifications
🗑
|
||||
What type of spot check is used to validate preventative maintanence that has been completed | show 🗑
|
||||
What is designed to provide a ready reference of planned maintanence requirements which will be retained in the working area for use by the WCS and maintanence personnel | show 🗑
|
||||
What does JSN stand for | show 🗑
|
||||
show | Forecasting report
🗑
|
||||
show | PM, SU, LU
🗑
|
||||
Who is responsible for reviewing and finalzing force revision | show 🗑
|
||||
show | Notify the authorizing officer
🗑
|
||||
show | M-1 had mandatory related maintenance of R-1
🗑
|
||||
show | Once a Month as required
🗑
|
||||
If a MRC has a SYSCOM control number of 11BWQD Y, what does the Y indicete | show 🗑
|
||||
If multiple maintanence persons a assigned to do a single maintanence action, who must sign for the maintanence completed in SKED | show 🗑
|
||||
show | Tools required
🗑
|
||||
What does the “C” to the left of the MIP number on the LOEP indicate | show 🗑
|
||||
show | Safety of the ship item
🗑
|
||||
What symbol is used to mark off maintanence requirements satisified by higher level maintanence | show 🗑
|
||||
show | A sub catagory used to identify test equipment used to perform PMS
🗑
|
||||
During Force Revision, what color indicates a MRC for setting a first schedule offset | show 🗑
|
||||
show | Yellow
🗑
|
||||
Pen and ink changes made to a MRC as directed by a FBR must be first initialed by whom | show 🗑
|
||||
Which is an example of a SPLIT MIP | show 🗑
|
||||
When adding new equipment under a work center MIP, an entry should be made in the ________ block to spread out when the initial maintanence checks that will be due | show 🗑
|
||||
show | Situational/ R- check report
🗑
|
||||
T/F-When entering equipment in IEM, you should select an end date by forecasting when you believe you will be bringing the equipment back online | show 🗑
|
Review the information in the table. When you are ready to quiz yourself you can hide individual columns or the entire table. Then you can click on the empty cells to reveal the answer. Try to recall what will be displayed before clicking the empty cell.
To hide a column, click on the column name.
To hide the entire table, click on the "Hide All" button.
You may also shuffle the rows of the table by clicking on the "Shuffle" button.
Or sort by any of the columns using the down arrow next to any column heading.
If you know all the data on any row, you can temporarily remove it by tapping the trash can to the right of the row.
To hide a column, click on the column name.
To hide the entire table, click on the "Hide All" button.
You may also shuffle the rows of the table by clicking on the "Shuffle" button.
Or sort by any of the columns using the down arrow next to any column heading.
If you know all the data on any row, you can temporarily remove it by tapping the trash can to the right of the row.
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.
Normal Size Small Size show me how
Normal Size Small Size show me how
Created by:
CONGO-POPULAR