Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password

Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.
        Help!  

Question
Answer
Which MRCs are requred to be printed out and placed in the MRC deck   show
🗑
MIPs/ MRCs that are required but not scheduled   show
🗑
show A check not entry is annotated  
🗑
Who is responsible for coordinating all adminstrative facets of 3-M program per current directive   show
🗑
This control document is used for adminstrative OOC and CAL lables. It provides sequential listings of all OOC and CAL instruments.   show
🗑
Who is overall responsible for ensuring maintenance is accomplished following the 3M system   show
🗑
show Deactivated equipment  
🗑
show Lost  
🗑
You may see the acronym NMR on your LOEP, what does it mean   show
🗑
Who reviews and approves all spit MIPs   show
🗑
show OPNAVIST 5100.19  
🗑
show Mark the maintenance action as complete in sked immediately upon completion  
🗑
show A current safety inspection from the electrical tool issue room  
🗑
show DIVO  
🗑
show R-1W  
🗑
show 3-M planned maintenance system  
🗑
show OPNAV INSTRUCTION 5100.28  
🗑
What imformation is required on the secondary container label   show
🗑
What can be used to ensure all future requirements such as tools, parts and test equipment are available for maintenance checks   show
🗑
Which chapter of the 5100.19e volume II discusses general safety requirements for ladders, machinery, and stowage of HAZMAT   show
🗑
The number assigned to tools, parts, material and test equipment on the MRC which can be referenced to the standard PMS material identifaction guide ( SPMIG) for stock number identification is known as   show
🗑
Who can complete weekly close outs of maintenance in the absence of the DIVO   show
🗑
Which of the following best describes IEM status I   show
🗑
After tag posting is complete, a second person shall   show
🗑
A catagory B (technical FBR) is ised for what purpose   show
🗑
What day must maintanance be closed ot for the week   show
🗑
show ++  
🗑
Which of the following is one of the primary 3M responsibilities of the department head   show
🗑
Whos responsibility is to review assigned schedule maintenance requirments and perform using MRCs as indicated by the PMS schedule   show
🗑
What do the first two numbers of the SYSCOM MRCs Control number indicate   show
🗑
show SYSCOM MRC control number  
🗑
What color are classified MECs printed on   show
🗑
When a line item is filled out in TORS, the Petty Officer in chargen black is signed. The signer, normally the ships force POIC of the work, shall ensure the adequacy and accuracy of the line item. The who mist conduct an independent review   show
🗑
show Submitting a feed back report  
🗑
If a MRC calls for antag-out with the note “if appilicable”, no check not entry is required if a tag was not hung   show
🗑
show MIPs and MRCs not scheduled that are required  
🗑
What is IEM status II   show
🗑
What does CASREP stand for   show
🗑
show CO  
🗑
show Equipment not covered by PMS  
🗑
Which of the following are not identifications markers on shipboard HAZMAT containers   show
🗑
show Urgent  
🗑
Which of the following is a responsibility of the department head   show
🗑
show Caution  
🗑
What does PPE stand for   show
🗑
show WCS  
🗑
A list of warnings and referances which direct attention to possible hazards to personnel which could result in injury or death while performing maintenance is known as   show
🗑
What does TPMTEN stand for   show
🗑
In status I IEM, the equipment that will remain on board, is not scheduled for corrective maintenance or overhaul and will be inactive for   show
🗑
show A situational requirment report  
🗑
show Feed back report  
🗑
The international placment of a piece of equipment/ system in a hibernated state for a specific duration with the intention of reactivating at the end of that duration is defined as what   show
🗑
What does APL stand for   show
🗑
show Operational risk management  
🗑
What is the purpose of a MRC   show
🗑
In the “ Procedure” block WCSs may line out the non- applicable line items that do not pertain to current equipment/ configuration when step is followed with words “ if applicable” or a note identifying steps to be omitted. These items must be reviewed an   show
🗑
show 3M 301 and if required, completion of departmental qualifications  
🗑
What type of spot check is used to validate preventative maintanence that has been completed   show
🗑
What is designed to provide a ready reference of planned maintanence requirements which will be retained in the working area for use by the WCS and maintanence personnel   show
🗑
What does JSN stand for   show
🗑
show Forecasting report  
🗑
show PM, SU, LU  
🗑
Who is responsible for reviewing and finalzing force revision   show
🗑
show Notify the authorizing officer  
🗑
show M-1 had mandatory related maintenance of R-1  
🗑
show Once a Month as required  
🗑
If a MRC has a SYSCOM control number of 11BWQD Y, what does the Y indicete   show
🗑
If multiple maintanence persons a assigned to do a single maintanence action, who must sign for the maintanence completed in SKED   show
🗑
show Tools required  
🗑
What does the “C” to the left of the MIP number on the LOEP indicate   show
🗑
show Safety of the ship item  
🗑
What symbol is used to mark off maintanence requirements satisified by higher level maintanence   show
🗑
show A sub catagory used to identify test equipment used to perform PMS  
🗑
During Force Revision, what color indicates a MRC for setting a first schedule offset   show
🗑
show Yellow  
🗑
Pen and ink changes made to a MRC as directed by a FBR must be first initialed by whom   show
🗑
Which is an example of a SPLIT MIP   show
🗑
When adding new equipment under a work center MIP, an entry should be made in the ________ block to spread out when the initial maintanence checks that will be due   show
🗑
show Situational/ R- check report  
🗑
T/F-When entering equipment in IEM, you should select an end date by forecasting when you believe you will be bringing the equipment back online   show
🗑


   

Review the information in the table. When you are ready to quiz yourself you can hide individual columns or the entire table. Then you can click on the empty cells to reveal the answer. Try to recall what will be displayed before clicking the empty cell.
 
To hide a column, click on the column name.
 
To hide the entire table, click on the "Hide All" button.
 
You may also shuffle the rows of the table by clicking on the "Shuffle" button.
 
Or sort by any of the columns using the down arrow next to any column heading.
If you know all the data on any row, you can temporarily remove it by tapping the trash can to the right of the row.

 
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how
Created by: CONGO-POPULAR