Question
click below
click below
Question
Normal Size Small Size show me how
WORK CENTER SUP
Question | Answer |
---|---|
Which MRCs are requred to be printed out and placed in the MRC deck | Quarterly and below, all R-Checks and MRCs with fill in the blanks |
MIPs/ MRCs that are required but not scheduled | Omitted |
What must happen when maintenance is not accomplished | A check not entry is annotated |
Who is responsible for coordinating all adminstrative facets of 3-M program per current directive | 3MO |
This control document is used for adminstrative OOC and CAL lables. It provides sequential listings of all OOC and CAL instruments. | Instrument log |
Who is overall responsible for ensuring maintenance is accomplished following the 3M system | CO |
The intentional placment of a piece of equipment out-of-service with no intention of reactivating the equipment/ system is defined as what | Deactivated equipment |
Daily situational checks not accomplished are called what | Lost |
You may see the acronym NMR on your LOEP, what does it mean | No maintenance required |
Who reviews and approves all spit MIPs | XO |
What instruction dictates the requirement for HAZMAT Container labeling | OPNAVIST 5100.19 |
What should a maintenance person do upon completion of preventative maintenance | Mark the maintenance action as complete in sked immediately upon completion |
What document must be verified prior to conducting maintenance on a piece of equipment using portable power tools | A current safety inspection from the electrical tool issue room |
Whos responsibility is it to review the CSMP with the WCS and the process TFBRs on a weekly basis | DIVO |
Which of the following periodicities is a non-calander periodicity | R-1W |
To maintain equipment within specifications through preventative maintenance, identifying and correcting problems before the equipment becomes inoperable is an objective of what program | 3-M planned maintenance system |
What manual gives you a generic risk assesment, compatibility imformation, control mesures, safety control, and disposal guidelines for 22 hazardous material groups, arranged by common uses and properties | OPNAV INSTRUCTION 5100.28 |
What imformation is required on the secondary container label | Type of material, manufacturer name and address and nature of hazard, including target orgin |
What can be used to ensure all future requirements such as tools, parts and test equipment are available for maintenance checks | Forecasting report |
Which chapter of the 5100.19e volume II discusses general safety requirements for ladders, machinery, and stowage of HAZMAT | Chapter 1 |
The number assigned to tools, parts, material and test equipment on the MRC which can be referenced to the standard PMS material identifaction guide ( SPMIG) for stock number identification is known as | SPIN |
Who can complete weekly close outs of maintenance in the absence of the DIVO | LCPO |
Which of the following best describes IEM status I | Equipment that will remain on board and will be inactive for seven days or longer and is not reschuduled for corrective maintenance or overhaul |
After tag posting is complete, a second person shall | Independently ensure that the correct component is tagged and checked (verify) proper component and sign as authorizing officer |
A catagory B (technical FBR) is ised for what purpose | Used to report technical discrepancies inhibiting PMS performance |
What day must maintanance be closed ot for the week | First work day of the week |
Which symbol following a periodicity code indicates that the procedure is intended to be scheduled and performed by either ships force or off-ship maintenance personnel | ++ |
Which of the following is one of the primary 3M responsibilities of the department head | The scheduling and execution of PMS, work candidate review and configuration validation within their department |
Whos responsibility is to review assigned schedule maintenance requirments and perform using MRCs as indicated by the PMS schedule | Maintenance person |
What do the first two numbers of the SYSCOM MRCs Control number indicate | Date code |
What is the three segmant code used for cataloging MRCs | SYSCOM MRC control number |
What color are classified MECs printed on | Pink |
When a line item is filled out in TORS, the Petty Officer in chargen black is signed. The signer, normally the ships force POIC of the work, shall ensure the adequacy and accuracy of the line item. The who mist conduct an independent review | Qualified person |
What is not a valid reason for lining out an MRC on a MIP | Submitting a feed back report |
If a MRC calls for antag-out with the note “if appilicable”, no check not entry is required if a tag was not hung | False |
What are considered omitted checks | MIPs and MRCs not scheduled that are required |
What is IEM status II | Equipment scheduled for overhaul for seven days or greater |
What does CASREP stand for | Casualty report |
Who is responsible for ensuring that personnel assigned to their respective areas understand and comply with the tag out user manual | CO |
Which of to following best describes IEM status I | Equipment not covered by PMS |
Which of the following are not identifications markers on shipboard HAZMAT containers | SYSCOM control number |
Technical PMS discrepancies that could have detrimental effect on personal safety, safety of the ship or could result in significant equipment, are classified as what type of technical FBR | Urgent |
Which of the following is a responsibility of the department head | Authorize in writing any equipment placed in IEM status |
What type of tag would be used as a precautionary measure to provide temporary instruction or to indicate that unusual action must be exercised to operate equipment | Caution |
What does PPE stand for | Personal protective equipment |
When a maintenance person does not fully understand or identifies incorrect information on and MRC, who does the MP notify | WCS |
A list of warnings and referances which direct attention to possible hazards to personnel which could result in injury or death while performing maintenance is known as | Safety precautions |
What does TPMTEN stand for | Tools, parts, material, and test equipment |
In status I IEM, the equipment that will remain on board, is not scheduled for corrective maintenance or overhaul and will be inactive for | Seven or more days |
Which of the following is not listed on the LOEP | A situational requirment report |
What does FBR stand for | Feed back report |
The international placment of a piece of equipment/ system in a hibernated state for a specific duration with the intention of reactivating at the end of that duration is defined as what | Inactive equipment |
What does APL stand for | Allowance parts list |
What does the abbreviation ORM stand for | Operational risk management |
What is the purpose of a MRC | Provides detailed procedures for performing maintenance requirments |
In the “ Procedure” block WCSs may line out the non- applicable line items that do not pertain to current equipment/ configuration when step is followed with words “ if applicable” or a note identifying steps to be omitted. These items must be reviewed an | DLCPO |
Ships force qualification in the tag- out Users manual should be done by the completion of what PQS | 3M 301 and if required, completion of departmental qualifications |
What type of spot check is used to validate preventative maintanence that has been completed | Historical |
What is designed to provide a ready reference of planned maintanence requirements which will be retained in the working area for use by the WCS and maintanence personnel | Work center PMS manual |
What does JSN stand for | Job sequence number |
What can be used to ensure all future requirments such as tools, parts and test equipment are available for maintenance checks | Forecasting report |
Which of the following are examples of IEM periodicity codes | PM, SU, LU |
Who is responsible for reviewing and finalzing force revision | Department head |
What do you do when you find a damaged danger tag | Notify the authorizing officer |
A periodicity of M-1(#R-1) signifies what | M-1 had mandatory related maintenance of R-1 |
How often should PMS check 6641/005 M-9R be accomplished | Once a Month as required |
If a MRC has a SYSCOM control number of 11BWQD Y, what does the Y indicete | Repair parts required |
If multiple maintanence persons a assigned to do a single maintanence action, who must sign for the maintanence completed in SKED | The senior most person assigned |
The LOEP contains all except which of the following | Tools required |
What does the “C” to the left of the MIP number on the LOEP indicate | Change MIP |
What does the asterisk (*) following the periodicity code indicate | Safety of the ship item |
What symbol is used to mark off maintanence requirements satisified by higher level maintanence | € |
What is a SCAT code | A sub catagory used to identify test equipment used to perform PMS |
During Force Revision, what color indicates a MRC for setting a first schedule offset | Green |
In revision editor, what color is a MIP that has had changes to it | Yellow |
Pen and ink changes made to a MRC as directed by a FBR must be first initialed by whom | DIVO |
Which is an example of a SPLIT MIP | When maintanence has a split between two work centers on the same piece of equipment |
When adding new equipment under a work center MIP, an entry should be made in the ________ block to spread out when the initial maintanence checks that will be due | First Schedule Offset |
Where would a WCS look to find out what maintanence checks are required prior to entering a CNO availability | Situational/ R- check report |
T/F-When entering equipment in IEM, you should select an end date by forecasting when you believe you will be bringing the equipment back online | False |