Question

Which MRCs are requred to be printed out and placed in the MRC deck
click to flip
focusNode
Didn't know it?
click below
 
Knew it?
click below
Don't know

Question

MIPs/ MRCs that are required but not scheduled
Remaining cards (79)
Know
0:00
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how

WORK CENTER SUP

QuestionAnswer
Which MRCs are requred to be printed out and placed in the MRC deck Quarterly and below, all R-Checks and MRCs with fill in the blanks
MIPs/ MRCs that are required but not scheduled Omitted
What must happen when maintenance is not accomplished A check not entry is annotated
Who is responsible for coordinating all adminstrative facets of 3-M program per current directive 3MO
This control document is used for adminstrative OOC and CAL lables. It provides sequential listings of all OOC and CAL instruments. Instrument log
Who is overall responsible for ensuring maintenance is accomplished following the 3M system CO
The intentional placment of a piece of equipment out-of-service with no intention of reactivating the equipment/ system is defined as what Deactivated equipment
Daily situational checks not accomplished are called what Lost
You may see the acronym NMR on your LOEP, what does it mean No maintenance required
Who reviews and approves all spit MIPs XO
What instruction dictates the requirement for HAZMAT Container labeling OPNAVIST 5100.19
What should a maintenance person do upon completion of preventative maintenance Mark the maintenance action as complete in sked immediately upon completion
What document must be verified prior to conducting maintenance on a piece of equipment using portable power tools A current safety inspection from the electrical tool issue room
Whos responsibility is it to review the CSMP with the WCS and the process TFBRs on a weekly basis DIVO
Which of the following periodicities is a non-calander periodicity R-1W
To maintain equipment within specifications through preventative maintenance, identifying and correcting problems before the equipment becomes inoperable is an objective of what program 3-M planned maintenance system
What manual gives you a generic risk assesment, compatibility imformation, control mesures, safety control, and disposal guidelines for 22 hazardous material groups, arranged by common uses and properties OPNAV INSTRUCTION 5100.28
What imformation is required on the secondary container label Type of material, manufacturer name and address and nature of hazard, including target orgin
What can be used to ensure all future requirements such as tools, parts and test equipment are available for maintenance checks Forecasting report
Which chapter of the 5100.19e volume II discusses general safety requirements for ladders, machinery, and stowage of HAZMAT Chapter 1
The number assigned to tools, parts, material and test equipment on the MRC which can be referenced to the standard PMS material identifaction guide ( SPMIG) for stock number identification is known as SPIN
Who can complete weekly close outs of maintenance in the absence of the DIVO LCPO
Which of the following best describes IEM status I Equipment that will remain on board and will be inactive for seven days or longer and is not reschuduled for corrective maintenance or overhaul
After tag posting is complete, a second person shall Independently ensure that the correct component is tagged and checked (verify) proper component and sign as authorizing officer
A catagory B (technical FBR) is ised for what purpose Used to report technical discrepancies inhibiting PMS performance
What day must maintanance be closed ot for the week First work day of the week
Which symbol following a periodicity code indicates that the procedure is intended to be scheduled and performed by either ships force or off-ship maintenance personnel ++
Which of the following is one of the primary 3M responsibilities of the department head The scheduling and execution of PMS, work candidate review and configuration validation within their department
Whos responsibility is to review assigned schedule maintenance requirments and perform using MRCs as indicated by the PMS schedule Maintenance person
What do the first two numbers of the SYSCOM MRCs Control number indicate Date code
What is the three segmant code used for cataloging MRCs SYSCOM MRC control number
What color are classified MECs printed on Pink
When a line item is filled out in TORS, the Petty Officer in chargen black is signed. The signer, normally the ships force POIC of the work, shall ensure the adequacy and accuracy of the line item. The who mist conduct an independent review Qualified person
What is not a valid reason for lining out an MRC on a MIP Submitting a feed back report
If a MRC calls for antag-out with the note “if appilicable”, no check not entry is required if a tag was not hung False
What are considered omitted checks MIPs and MRCs not scheduled that are required
What is IEM status II Equipment scheduled for overhaul for seven days or greater
What does CASREP stand for Casualty report
Who is responsible for ensuring that personnel assigned to their respective areas understand and comply with the tag out user manual CO
Which of to following best describes IEM status I Equipment not covered by PMS
Which of the following are not identifications markers on shipboard HAZMAT containers SYSCOM control number
Technical PMS discrepancies that could have detrimental effect on personal safety, safety of the ship or could result in significant equipment, are classified as what type of technical FBR Urgent
Which of the following is a responsibility of the department head Authorize in writing any equipment placed in IEM status
What type of tag would be used as a precautionary measure to provide temporary instruction or to indicate that unusual action must be exercised to operate equipment Caution
What does PPE stand for Personal protective equipment
When a maintenance person does not fully understand or identifies incorrect information on and MRC, who does the MP notify WCS
A list of warnings and referances which direct attention to possible hazards to personnel which could result in injury or death while performing maintenance is known as Safety precautions
What does TPMTEN stand for Tools, parts, material, and test equipment
In status I IEM, the equipment that will remain on board, is not scheduled for corrective maintenance or overhaul and will be inactive for Seven or more days
Which of the following is not listed on the LOEP A situational requirment report
What does FBR stand for Feed back report
The international placment of a piece of equipment/ system in a hibernated state for a specific duration with the intention of reactivating at the end of that duration is defined as what Inactive equipment
What does APL stand for Allowance parts list
What does the abbreviation ORM stand for Operational risk management
What is the purpose of a MRC Provides detailed procedures for performing maintenance requirments
In the “ Procedure” block WCSs may line out the non- applicable line items that do not pertain to current equipment/ configuration when step is followed with words “ if applicable” or a note identifying steps to be omitted. These items must be reviewed an DLCPO
Ships force qualification in the tag- out Users manual should be done by the completion of what PQS 3M 301 and if required, completion of departmental qualifications
What type of spot check is used to validate preventative maintanence that has been completed Historical
What is designed to provide a ready reference of planned maintanence requirements which will be retained in the working area for use by the WCS and maintanence personnel Work center PMS manual
What does JSN stand for Job sequence number
What can be used to ensure all future requirments such as tools, parts and test equipment are available for maintenance checks Forecasting report
Which of the following are examples of IEM periodicity codes PM, SU, LU
Who is responsible for reviewing and finalzing force revision Department head
What do you do when you find a damaged danger tag Notify the authorizing officer
A periodicity of M-1(#R-1) signifies what M-1 had mandatory related maintenance of R-1
How often should PMS check 6641/005 M-9R be accomplished Once a Month as required
If a MRC has a SYSCOM control number of 11BWQD Y, what does the Y indicete Repair parts required
If multiple maintanence persons a assigned to do a single maintanence action, who must sign for the maintanence completed in SKED The senior most person assigned
The LOEP contains all except which of the following Tools required
What does the “C” to the left of the MIP number on the LOEP indicate Change MIP
What does the asterisk (*) following the periodicity code indicate Safety of the ship item
What symbol is used to mark off maintanence requirements satisified by higher level maintanence
What is a SCAT code A sub catagory used to identify test equipment used to perform PMS
During Force Revision, what color indicates a MRC for setting a first schedule offset Green
In revision editor, what color is a MIP that has had changes to it Yellow
Pen and ink changes made to a MRC as directed by a FBR must be first initialed by whom DIVO
Which is an example of a SPLIT MIP When maintanence has a split between two work centers on the same piece of equipment
When adding new equipment under a work center MIP, an entry should be made in the ________ block to spread out when the initial maintanence checks that will be due First Schedule Offset
Where would a WCS look to find out what maintanence checks are required prior to entering a CNO availability Situational/ R- check report
T/F-When entering equipment in IEM, you should select an end date by forecasting when you believe you will be bringing the equipment back online False
Created by: CONGO-POPULAR
 

 



Voices

Use these flashcards to help memorize information. Look at the large card and try to recall what is on the other side. Then click the card to flip it. If you knew the answer, click the green Know box. Otherwise, click the red Don't know box.

When you've placed seven or more cards in the Don't know box, click "retry" to try those cards again.

If you've accidentally put the card in the wrong box, just click on the card to take it out of the box.

You can also use your keyboard to move the cards as follows:

If you are logged in to your account, this website will remember which cards you know and don't know so that they are in the same box the next time you log in.

When you need a break, try one of the other activities listed below the flashcards like Matching, Snowman, or Hungry Bug. Although it may feel like you're playing a game, your brain is still making more connections with the information to help you out.

To see how well you know the information, try the Quiz or Test activity.

Pass complete!
"Know" box contains:
Time elapsed:
Retries:
restart all cards