Save
Upgrade to remove ads
Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.
focusNode
Didn't know it?
click below
 
Knew it?
click below
Don't Know
Remaining cards (0)
Know
0:00
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how

CM Ch.7

Performing Preconstruction Services

QuestionAnswer
When does the preconstruction phase take place? before design is complete (during design phase) and before construction begins
What are three ways owners can benefit from alternative project delivery methods? lower project costs, improved schedule, greater value, higher quality, less waste, greater efficiencies, and more innovation
Define preconstruction services. anticipatory planning, analytical, and evaluation activities that occur before construction begins, often during the design phase when at‐risk CM or design‐build is employed as the project delivery method
List the five most common preconstruction services. feasibility studies, constructability reviews, conceptual estimating, value engineering, and life‐cycle cost analysis
How do feasibility studies benefit the owner? consider how successful the project will be for its intended purpose. The construction manager will help the owner uncover both the positive and negative outcomes of the project before they proceed with the investment and capital expenditure
Who should perform the constructability review? All members of the construction team—project managers, senior personnel within the construction company, superintendents, foremen, trades personnel, subcontractors, facility and maintenance personnel, and specialty contractors
What are two benefits of using conceptual estimating? it helps clients and architects track the impacts of design as it develops and it gives the owner cost certainty much earlier in the design process
How are cost models developed? Cost models are developed from previously built projects where actual costs are known and archived to create a “historical cost, or model cost database,” which can then be used to extrapolate estimates for similar projects
How can value be added to a project in terms of benefits and cost? by improving benefits and reducing cost, maintaining benefits and reducing cost, improving benefits and maintaining cost, or increasing benefits and increasing cost
Define life‐cycle cost cost analysis that provides long‐term cost projections for a particular building investment over its useful life cycle
Created by: taylorstudies
 

 



Voices

Use these flashcards to help memorize information. Look at the large card and try to recall what is on the other side. Then click the card to flip it. If you knew the answer, click the green Know box. Otherwise, click the red Don't know box.

When you've placed seven or more cards in the Don't know box, click "retry" to try those cards again.

If you've accidentally put the card in the wrong box, just click on the card to take it out of the box.

You can also use your keyboard to move the cards as follows:

If you are logged in to your account, this website will remember which cards you know and don't know so that they are in the same box the next time you log in.

When you need a break, try one of the other activities listed below the flashcards like Matching, Snowman, or Hungry Bug. Although it may feel like you're playing a game, your brain is still making more connections with the information to help you out.

To see how well you know the information, try the Quiz or Test activity.

Pass complete!
"Know" box contains:
Time elapsed:
Retries:
restart all cards