Save
Upgrade to remove ads
Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.
focusNode
Didn't know it?
click below
 
Knew it?
click below
Don't Know
Remaining cards (0)
Know
0:00
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how

PROJMAN - L7

Project Quality Management

QuestionAnswer
defined based on conformance to requirements and fitness for use Quality
is to make sure that the project will satisfy the needs for which it was undertaken. Project Quality Management
identifies quality requirements and/or standards for the project and product, and documents how the project will demonstrate compliance Plan quality
audits the quality requirements and the results from quality control measurements Perform quality assurance
monitors and records the results of executing the quality activities to assess performance and recommend necessary changes Perform quality control
used to generate ideas for quality improvements by comparing specific Benchmarking
to inspect the accomplished work Quality Control
aids in identifying the main cause of a problem • also known as fishbone or Ishikawa diagram Cause-and-Effect Diagram
graphic display of data that illustrates the results of a process over time Control Charts
illustrate the process performance over time Run Charts
identify potential relationships between two variables Scatter Diagrams
bar graph used to summarize data and how to show a frequency distribution Histograms
that help identify and prioritize problem areas Pareto Charts
graphic display of logic and flow of processes that aids in the analysis of how problems occu Flowcharts
involves choosing part of a population of interest for inspection Statistical Sampling
comprehensive and flexible system for achieving, sustaining, and maximizing business success Six Sigma
tests each individual component to ensure that it is free from possible Unit testing
• Break down barriers between staff areas. Deming
developed 10 steps to quality improvement Build awareness of the need and opportunity for improvement. •Set goals for improvement. •Organize to reach the goals Juran
• Make it clear that management is committed to quality. • Form quality improvement teams with representatives from each department. • Determine where current and potential quality problems lie. Crosby
Encourage individuals to establish improvement goals for themselves and their groups. Crosby
best known for his 1972 book entitled ‘Guide to Quality Control’ developed the concept of quality circles and pioneered the use of fishbone diagrams Ishikawa
are groups of non-supervisors and work leaders in a single company department who volunteered to conduct group studies on how to improve the effectiveness of work in their department. Quality circles
best known for developing the Taguchi methods for optimizing the process of engineering experimentation Taguchi
developed the concept of total quality control (TQC) in his 1983 book ‘Total Quality Control: Engineering and Management’ proposed that the responsibility for quality should rest with the people who do the work Feigenbaum
addresses standards for excellence in project, program, and portfolio management best practices and explains the capabilities necessary to achieve those best practices Project Management Maturity Model
Created by: user-1782765
 

 



Voices

Use these flashcards to help memorize information. Look at the large card and try to recall what is on the other side. Then click the card to flip it. If you knew the answer, click the green Know box. Otherwise, click the red Don't know box.

When you've placed seven or more cards in the Don't know box, click "retry" to try those cards again.

If you've accidentally put the card in the wrong box, just click on the card to take it out of the box.

You can also use your keyboard to move the cards as follows:

If you are logged in to your account, this website will remember which cards you know and don't know so that they are in the same box the next time you log in.

When you need a break, try one of the other activities listed below the flashcards like Matching, Snowman, or Hungry Bug. Although it may feel like you're playing a game, your brain is still making more connections with the information to help you out.

To see how well you know the information, try the Quiz or Test activity.

Pass complete!
"Know" box contains:
Time elapsed:
Retries:
restart all cards