Save
Upgrade to remove ads
Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.
focusNode
Didn't know it?
click below
 
Knew it?
click below
Don't Know
Remaining cards (0)
Know
0:00
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how

PROJAMN - L6

Project Cost Management

QuestionAnswer
resource sacrificed or foregone to achieve a specific objective something given up in exchange Cost
are required to understand project cost management since project costs money and consumes resources. Project managers
re revenues minus expenses Profits
s the ratio of the revenues to profits Profit margin
allows you to take a big picture view of the cost of a project over its entire life. Life cycle costing
s is a method for determining the estimated annual costs and benefits for a project and the resulting annual cash flow Cash flow analysis
is the discount rate that makes NPV equal to zero. Internal rate of return (IRR)
are those costs or benefits that can be easily measured in pesos. Tangible costs or benefits
are the costs or benefits that are difficult to measure in monetary terms. Intangible costs
Are costs directly related to producing the products and services of a project. Direct costs
are costs not directly related to a project’s products or services, but are indirectly related to performing the project Indirect costs
is the money that has been spent in the past or considered gone Sunk cost
states that when many items are produced repetitively, the unit cost of those items decreases in a regular pattern as more units are produced. Learning curve theory
are the currencies included in a cost estimate to mitigate cost risk by allowing for future situations that are difficult to predict Reserves
are the amounts needed above the estimate which are for future situations that may be partially planned for and are included in the project cost baseline. Contingency reserves
are designated amounts which account for future situations that are unpredictable. Management reserves
involves developing an approximation (estimate) of the costs of the resources needed to complete project activities Estimating Costs
gives an estimation of the project’s costs Rough Order of Magnitude (ROM)
used to allocate money into the budget of an organization Budgetary Estimate
provides an accurate estimate of the project costs Definitive Estimate
uses historical data from similar projects as a basis for the cost estimate Analogous estimates
sometimes referred to as Activity Based Costing • uses the estimates of individual work packages which are then summarized or"rolled up" to determine an overall cost estimate for the project Bottom-up estimates
uses statistical modeling to develop a cost estimate Parametric modeling
used for estimating software development costs based on parameters such as the source lines of code or function points Constructive Cost Model or COCOMO
project performance measurement technique that integrates scope, time and cost data Earned Value Management
portion of the approved total cost estimate planned to be spent on an activity during a given period Planned Value (PV) or the budge
total direct and indirect costs incurred in accomplishing work on an activity during a given period Actual Cost (AC)
percentage of work actually completed multiplied by the planned value (Measures the value of work actually completed) Earned Value (EV)
is the earned value minus the actual cost (Shows whether the project is under or over budget.) Cost variance (CV
Is the earned value minus the planned value. (Shows whether the project is ahead or behind schedule) Schedule variance (SV)
is the ratio of earned value to actual cost and can be used to estimate the projected cost of completing the project. (Efficiency of cost utilization) Cost performance index (CPI)
Is the ratio of earned value to planned value and can be used to estimate the projected time to complete the project. (Efficiency of schedule performance) Schedule performance index (SPI)
is an estimate of what it will cost to complete the project based on performance to date Estimate at completion (EAC)
Created by: user-1782765
 

 



Voices

Use these flashcards to help memorize information. Look at the large card and try to recall what is on the other side. Then click the card to flip it. If you knew the answer, click the green Know box. Otherwise, click the red Don't know box.

When you've placed seven or more cards in the Don't know box, click "retry" to try those cards again.

If you've accidentally put the card in the wrong box, just click on the card to take it out of the box.

You can also use your keyboard to move the cards as follows:

If you are logged in to your account, this website will remember which cards you know and don't know so that they are in the same box the next time you log in.

When you need a break, try one of the other activities listed below the flashcards like Matching, Snowman, or Hungry Bug. Although it may feel like you're playing a game, your brain is still making more connections with the information to help you out.

To see how well you know the information, try the Quiz or Test activity.

Pass complete!
"Know" box contains:
Time elapsed:
Retries:
restart all cards