Save
Upgrade to remove ads
Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.
focusNode
Didn't know it?
click below
 
Knew it?
click below
Don't Know
Remaining cards (0)
Know
0:00
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how

CS 3354 Test 1 CH2

QuestionAnswer
What is a software process? A structured set of activities required to develop a software system. Many different processes exist, but all involve specification, design and implementation, validation, and evolution.
What are the universal process activities inherent to all software engineering methodologies? Specification, design and implementation, validation, and evolution. (Generic framework activities: communication, planning, modeling, construction, deployment.)
What is a software process model? An abstract representation of a process that describes it from some perspective. Descriptions may also include products, roles, and pre- and post-conditions.
List 3 generic process models that are used in software engineering? Waterfall, incremental development, and integration and configuration (textbook). The slides also cover the V-model and evolutionary models (prototyping, spiral).
Why are iterations usually limited when the waterfall model is used? Each phase must be complete and approved before the next begins, and the emphasis on documents and specifications makes going back costly. Its inflexible stages make responding to change difficult.
What are three benefits of incremental development, compared to the waterfall model? 1) Lower cost of accommodating changing requirements (less analysis and documentation redone). 2) Easier customer feedback. 3) More rapid delivery and deployment of useful software.
What are the development stages in integration and configuration? Requirements specification, software discovery and evaluation, requirements refinement, application system configuration, and component adaptation and integration. (Textbook, not in slides.)
Why is it increasingly irrelevant to distinguish between software development and evolution? Fewer and fewer systems are completely new. Software is inherently flexible and must keep changing as business circumstances change, so most work modifies existing systems.
What are the advantages of using incremental development and delivery? 1) Lower cost of accommodating changing requirements. 2) Easier customer feedback on work done. 3) More rapid delivery and deployment, so customers gain value earlier than with waterfall.
Created by: desto
 

 



Voices

Use these flashcards to help memorize information. Look at the large card and try to recall what is on the other side. Then click the card to flip it. If you knew the answer, click the green Know box. Otherwise, click the red Don't know box.

When you've placed seven or more cards in the Don't know box, click "retry" to try those cards again.

If you've accidentally put the card in the wrong box, just click on the card to take it out of the box.

You can also use your keyboard to move the cards as follows:

If you are logged in to your account, this website will remember which cards you know and don't know so that they are in the same box the next time you log in.

When you need a break, try one of the other activities listed below the flashcards like Matching, Snowman, or Hungry Bug. Although it may feel like you're playing a game, your brain is still making more connections with the information to help you out.

To see how well you know the information, try the Quiz or Test activity.

Pass complete!
"Know" box contains:
Time elapsed:
Retries:
restart all cards