PM vocab 11
| Term | Definition |
|---|---|
| Parametric Estimating | A cost-estimating technique that uses project characteristics (parameters) in a mathematical model to estimate project costs |
| Precedence Diagramming Method (PDM) | A schedule network diagramming technique in which schedule activities are represented by boxes (or nodes). |
| Reserve Analysis | An analytical technique to determine the essential features and relationships of components in the project management plan to establish a reserve for the schedule duration, budget, estimated cost, or funds for a project. |
| Resource Leveling | A technique in which start, and finish dates are adjusted based on resource constraints with the goal of balancing demand for resources with the available supply. |
| Roll wave planning | A form of progressive elaboration planning where the work to be accomplished in the near term is planned in detail and future work is planned at a higher level of the WBS. |
| Schedule Compression | Techniques used to shorten the schedule duration without reducing the project scope. |
| Sequence activities | The process of identifying and documenting relations among the project activities. |
| Start-to-finish | An activity relationship that requires an activity to start so that its successor can finish. This is the most unusual of all the activity relationship types. |
| Start-to-start | An activity relationship type that requires the current activity to start before its successor can start. |
| Three-Point Estimate | A technique used to estimate cost or duration by applying an average or weighted average of optimistic, pessimistic, and most likely estimates when there is uncertainty with the individual activity estimates. |