Save
Upgrade to remove ads
Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.
focusNode
Didn't know it?
click below
 
Knew it?
click below
Don't Know
Remaining cards (0)
Know
0:00
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how

ACI Pg 20-21 first

QuestionAnswer
What must occur before a sample of concrete can be taken from a revolving drum mixer? All water and admixtures must be added to the mixer.
When sampling from a stationary or revolving drum mixer, what is collected and when is it taken during discharge? In two or more portions of concrete. At regularly spaced intervals. From the middle of the batch.
How are the sample portions obtained from the discharge stream of a stationary or revolving drum mixer? Repeatedly pass a receptacle through the entire discharge stream. Completely divert the discharge stream into a sample container.
Describe the procedure for collecting a sample from a paving mixer. Discharge the contents of the paving mixer. Obtain samples from at least five different portions of the pile.
What is the minimum size for a sample when strength test specimens are to be molded? 1 ft^3 (28 L)
What is the maximum allowable time between obtaining the first and final portions of the composite sample? 15 mins
What action is required after the individual concrete samples have been transported to the place where tests are to be preformed? Combine and remix the samples with a shovel
What should be done if the concrete contains aggregates larger than is appropriate for the size of the molds or equipment being used? Wet sieving (screening)
Start the tests for slump, temperature, and air content within how many minutes after obtaining the final portion of the composite sample? 5 mins
Start molding specimens for strength tests within how many minutes after fabricating the composite sample? 15 mins
From what must the concrete sample be protected? Sun, wind, rapid evaporation. Contamination.
Created by: user-1967787
 

 



Voices

Use these flashcards to help memorize information. Look at the large card and try to recall what is on the other side. Then click the card to flip it. If you knew the answer, click the green Know box. Otherwise, click the red Don't know box.

When you've placed seven or more cards in the Don't know box, click "retry" to try those cards again.

If you've accidentally put the card in the wrong box, just click on the card to take it out of the box.

You can also use your keyboard to move the cards as follows:

If you are logged in to your account, this website will remember which cards you know and don't know so that they are in the same box the next time you log in.

When you need a break, try one of the other activities listed below the flashcards like Matching, Snowman, or Hungry Bug. Although it may feel like you're playing a game, your brain is still making more connections with the information to help you out.

To see how well you know the information, try the Quiz or Test activity.

Pass complete!
"Know" box contains:
Time elapsed:
Retries:
restart all cards