| Question | Answer |
|---|---|
| Cons of blow moulding | Not high detail and cant take apart to fit and maintain circuitry |
| Cons of vacuum forming | Excess waste and uniform wall thickness - cant make high risk areas thicker |
| Personal Protective Clothing Regulations year | 2002 |
| RCDs | Residual Current Devices - needed for all electrical power tools - cuts off when fault causing current to spike |
| PPE | Needs maintenance and replacement on a regular schedule |
| Emergency equipment | Fire extinguishers, first aid kits, eye baths |
| Types of prototype | Visual (basic shapes + size), proof of concept (key functionality - usable for testing), production (close to production grade. accurate representation) |
| Risk assessment definition | Document taking consideration of what might cause harm to people and if reasonable steps are being taken to prevent that harm |
| One-off production definition | Product that has been designed and manufactured for a single, specific solution |
| Batch production definition | Set number of products made at a time, with measures to ensure consistency with control devices such as jigs and templates and dedicated CNC machinery |
| Mass production definition | Large quantities of the same standard product or component are made |