Save
Upgrade to remove ads
Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.
focusNode
Didn't know it?
click below
 
Knew it?
click below
Don't Know
Remaining cards (0)
Know
0:00
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how

304

QuestionAnswer
What is used to report completion of alterations, maintenance actions that resulted in configuration change, and to correct discrepancies and errors in configuration files? OPNAV 4790/CK
Equipment is placed in IEM status whenever: The equipment will not be operated for 7 days or more but fully operational
Where do maintenance personnel find their weekly maintenance assignments? My Tasks view in Sked 3.2 and 13 Week report.
Which form is used for documenting installation of new equipment? OPNAV form 4790/CK
Answer for color question in middle of exam, what color does something turn: Green
- Second color question is the second to last question and answer is Yellow
What do you need to do to end IEM? SU(start-up)/QUARTERLY
What is the full answer version of 4790? Com Nav Airlant 4790
What is the answer to the first type of view in Sked question? IEM View
What is the answer to the second type of view in Sked question? Forecast View
In the question regarding what the definition of a spotcheck is, what does the answer include? “making sure the maintenance is completed”
What is the answer to the last question on the test? SEER review
Question in the first 10ish questions of the test that asks who has permission to do certain things. Answer is —————-. (disclaimer, this is not the only question in this format so make sure to read carefully) LCPO
What must clearly be defined and organized before defining and organizing MAINTENANCE GROUPS in SKED 3.2? Maintenance Items
What button brings up the icon index on Sked? F12
DEFINITION of PAR periodic accomplishment rate) – Answer: Measures the percentage of checks performed within Periodicity
What can the Divo view in Sked? Shares the same view as the LCPO ▪ Conducts spot checks ▪ Signs FBRs ▪ All of the above
What does csmp stand for? Current ship maintenance plan, use answer with deferred maintenance
• What do you do about PMS with no MRC? NAVLOGSEA Norfolk/San Diego Det by PMS TFBR- send message to them
If, through the development process planned maintenance tasks have been identified, Xxxxxxxx may forward preliminary Xxxxxx and/or xxxxxx. to the applicable ships for those items coded xxxxxxxx If, through the development process planned maintenance tasks have been identified, NAVSEALOGCEN may forward preliminary MIPS and/or MRCs to the applicable ships for those items coded MRS
If preliminary Xxxxxx and/or Xxxxx. are not provided the command may develop interim MIP and MRC procedures based on applicable xxxxxxxxcc and quality xxxxxxxx. If preliminary MIPS and/or MRCs are not provided the command may develop interim MIP and MRC procedures based on applicable technical manuals/documentation and quality maintenance processes.
MRC procedures may be locally developed and scheduled. These locally developed procedures shall be submitted to the Xxxxxxxx as recommendations for the development of formal PMS MRC procedures may be locally developed and scheduled. These locally developed procedures shall be submitted to the SYSCOM/BUMED as recommendations for the development of formal PMS
what percentage of maintenance has to be completed 100
what IEM stands for Inactive Equipment maintenance
IEM status 1: Xxxxxx xxxxxxx EQUIPMENT that will remain on board, NOT SCHEDULED FOR CORRECTIVE MAINTENANCE or overhaul and will be inactive for x days or longer Fully operational EQUIPMENT that will remain on board, NOT SCHEDULED FOR CORRECTIVE MAINTENANCE or overhaul and will be inactive for 7 days or longer
IEM status 2.Equipment that is xxxxxx and DIRECTLY SUBJECT TO Xxxxxx xxxxxx, overhaul or REMOVAL FOR SAFE STORAGE or is TEMPORARILY TRANSFERRED TO ANOTHER ACTIVITY for 7 days or longer. Equipment that is inactive and DIRECTLY SUBJECT TO CORRECTIVE MAINTENANCE, overhaul or REMOVAL FOR SAFE STORAGE or is TEMPORARILY TRANSFERRED TO ANOTHER ACTIVITY for 7 days or longer.
Who are the primary SKED 3.2 users? Work center supervisers
The division LCPO reviews and initials which line-outs? MIP and LOEP
What is the procedure for a second person conducting a Tagout? 2nd Checker INDEPENDENTLY verifies proper positioning of item being tagged and that tag is securely attached, signs the tag and initials the record sheet. They WILL NOT accompany the person hanging the tags. (answer is similar to this)
Question about red danger tags – Answer is Never
What screen on SCHED 3.2 is used to submit Feedback Reports? FBR view or work center view.
Where can you find additional PPE requirements that are not stated on an MRC NSTM 760? (HMUG – Hazardous Materials User Guide)
Question: How do you implement controls? Avoid Hazard or reduce risk to an acceptable level
Which controls cannot be used to implement on the local MRCs? ANSWER – do not develop local MRCs from ships force SMEs
: How to view what parts have been ordered by the WC? RPPO Log in OMMS
T/f Work Center Supervisors (WCS) can lend someone else their OMMS-NG permissions w/o giving them the LAN password True
Local state affects Local state affects a given piece of equipment and is a persistent event that can be tracked over time. (In use or not in use)
State persistent event that can be tracked over duration of time (toggle on or off)
Global Whole ship
Local piece of equipment or the status of a workcenter
Trigger single occurrence or action that may have a mtc item tied to it (ie “getting underway”)
Metered event The value of a condition based off the last accomplishment of that condition.
Question about the correct way to send a FBR (feedback report)? A. “FBR – Will submit later”
Question asks who approves split MIPs Xo
Question about who can sign or approve FRs (force revisions) Answer is DH
Who approves IEM? DH
There was a question about non-accomplished maintenance where the answer was “check note” and PMS
Maintenance performed at the beginning of an inactive period. Prepares equipment for periods of prolonged idleness: : Lay Up (LU) maintenance
Maintenance to prevent deterioration. It is accomplished on a recurring basis during the inactive period. Periodic Maintenance (PM)
To check status of parts ordered for our work center, you should: Open your work candidate and check the status of the parts tab
When entering a work candidate, formerly a 2-Kilo, in OMMS-NG, what minimum information is required? Item blocks with a red check by them on each tab of a work candidate.
From the list below, the only modifications which shipboard personnel may NOT make to MRCs are the following: WCS may line out any items in the procedure block
What information goes in the work candidate summary block in OMMS-NG? A brief description of the problem.
Who advises the DIVO/LCPO on the status of the safety program within the division? Safety Petty Officer
What is the purpose of the command NAVOSH program? To achieve a safe and healthful working environment.
Instructions for drawings 4790 2L
What does TORS stand for? Tagout Record Sheet
What can be lined out? o MRC, MIP and LOEP can all be lined out
Created by: Shooter
 

 



Voices

Use these flashcards to help memorize information. Look at the large card and try to recall what is on the other side. Then click the card to flip it. If you knew the answer, click the green Know box. Otherwise, click the red Don't know box.

When you've placed seven or more cards in the Don't know box, click "retry" to try those cards again.

If you've accidentally put the card in the wrong box, just click on the card to take it out of the box.

You can also use your keyboard to move the cards as follows:

If you are logged in to your account, this website will remember which cards you know and don't know so that they are in the same box the next time you log in.

When you need a break, try one of the other activities listed below the flashcards like Matching, Snowman, or Hungry Bug. Although it may feel like you're playing a game, your brain is still making more connections with the information to help you out.

To see how well you know the information, try the Quiz or Test activity.

Pass complete!
"Know" box contains:
Time elapsed:
Retries:
restart all cards