Busy. Please wait.
or

show password
Forgot Password?

Don't have an account?  Sign up 
or

Username is available taken
show password

why


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
We do not share your email address with others. It is only used to allow you to reset your password. For details read our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.
Don't know
Know
remaining cards
Save
0:01
To flip the current card, click it or press the Spacebar key.  To move the current card to one of the three colored boxes, click on the box.  You may also press the UP ARROW key to move the card to the "Know" box, the DOWN ARROW key to move the card to the "Don't know" box, or the RIGHT ARROW key to move the card to the Remaining box.  You may also click on the card displayed in any of the three boxes to bring that card back to the center.

Pass complete!

"Know" box contains:
Time elapsed:
Retries:
restart all cards
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how

Engineering Chap 6

TermDefinition
continuous production products built in steady flow
assembly line system allows for continuous manufacturing at a steady rate
economy of scales as production increases. the cost of production each unit decreases
capital costs factory and machinery costs
batch production process of producing standardized parts in quantity to be assembled later into larger products
interchangeable parts pre-fabricated standardized parts that are assembled into products
unintended consequences effects that arise after technologies have become mainstream that are not forseen
Created by: msjmm