Lesson 2-2-10
| Question | Answer |
|---|---|
| The proper way to hang a small distribution transformer, when power equipment is not available is ___? | Use rope blocks, pole job, and block |
| OSHA has nothing to say about how you hook up and lift a load. True or false | False |
| According to industry standards, all distribution transformers above 200kva and /or 15,000 volts are ___? | Subtractive |
| A single phase transformer will not produce secondary voltage if the X2 is grounding strap is removed. True or false | False |
| A CSP transformer contains a(n) ___ and a(n) ___ breaker. | Internal HV fuse/ secondary |
| If the transformer nameplates shows 14,400 / 24,940 Y, it is suitable for delta connection. True or false | True |
| A transformer with reduced insulation at H2 must have H2 tied to the ___. | System neutral |
| If the secondary voltage is listed as 120/240 or 240/120, it makes no difference in the voltage that can be drawn out of the secondary. True or false | False |
| The H2 terminal on a single bushing transformer is ___ to the ___ of the tank. | Solidly connected, inside |
| It is a good practice to leave an extra length of copper or to curl primary risers from the transformer to the live line in case the lead breaks. True or false | False |
| Secondary drop leads are not needed for a single triplex service as the conductors can be put directly into the transformer terminals. True or false | False |
| What type of connector is commonly called a â popsicle stickâ | Pin terminal connector |
| On a fully loaded 25kva transformer, the drop leads would normally be # 2 stranded copper. True or false | True |
| List four factors that affect the mass that may be attached to a pole and may also affect pole stability. | Soil type, type of backfilling, length of pole, class of pole |
| Checking the winding continuity of a transformer is not important because transformers on the loading dock can be relied on. True or false | False |
| While doing a pre-installation check on a transformer, which check should not be done unless permission is granted from the company? | Removing the lid, inspect for loose bushings, inspect oil level, inspect for contaminated oil. |
| There is only one fusing schedule that should be used. True or false | False |
| On a transformer with Basket Terminals, it is best to insert copper leads from the bottom to allow water to drain off quickly and prevent oxides from forming. True or false | False |
| Two requirements of the 1996 Migratory Bird Treaty Act reading new transformer installations to protect birds from electrocution are ___? | Insulated primary lead wires and plastic bushing covers |
| Several pin terminal (popsicle stick) connectors can be crammed into a basket type terminal as long as the nut is tightened down. True or false | False |