click below
click below
Normal Size Small Size show me how
Oil and Gas
Test 2
| Question | Answer |
|---|---|
| What are the three stages of mountain building that produced the Appalachians? | Ordovician, Devonian, Permian |
| Why and when was the Catskill Delta formed? | formed in the Devonian period by numerous streams and the shoreline which was in present-day New York/Pennsylvania |
| How does the Marcellus shale relate to other Devonian shales? | they are all part of the Arcadian collision |
| Explain why the Marcellus shale is the deepest | sediments from the Acadian moutains fell into the valley (future PA), water covered the valley and the Marcellus formed; more sediment falls, water covers, Rhinestreet forms; sediment, water, Ohio |
| What is the approximate depth and thickness of the Marcellus shale in this area? | 6,000-7,000 feet deep; 100 feet thick |
| What is the relationship between the Barnett Shale and the Marcellus Shale? | part of the same basin; Barnett formed years after the Marcellus |
| What are the major systems involved in a modern rotary drilling rig? | hoisting (derrick); rotating (table, string, bit, kelly); mud (pumps, shaker table, filter) |
| What are the responsibilities of the Tool Pusher on a drill rig? | In charge of all operations; the boss |
| What are the responsibilities of the Driller on a drill rig? | controls drilling processes |
| What are the responsibilities of the Roughneck on a drill rig? | drill floor people |
| What are the responsibilities of the Company Man on a drill rig? | represents the oil company |
| What are the responsibilities of the Mud Logger on a drill rig? | collects drill cuttings, records mud gasses and prepares sample/mud log |
| What's the difference between a jack-up rig and a semi-submersible rig? | A jack-up rig is movable. A semi-submersible rig is stationary. Both are located in the oceans. |
| What is a whipstock and what is its purpose during drilling? | A wedge-shaped piece, that will alter the path of the drill bit. |
| What are the main stages of a vertical drilling operation? | 1) site prep, 2) "spudding in" 3) drill to water table and case it. 4) drill to target/reservoir |
| What are the main stages of a horizontal drilling operation? | 1) site prep, 2) "spudding in" 3) drill to water table and case it. 4) drill to target/reservoir 5) Horizontal drilling. 6) case horizontal sections 7) perforate pipe 8) hydrofrac the shale |
| What is the difference between oil-wet reservoirs and water-wet reservoirs? Which is better? | Oil wet has more oil, water wet has more oil; water-wet is better |
| How can you calculate the total volume of hydrocarbons in a conventional reservoir? | thickness x area x porosity - (1 - water saturation) |