Save
Upgrade to remove ads
Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.
focusNode
Didn't know it?
click below
 
Knew it?
click below
Don't Know
Remaining cards (0)
Know
0:00
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how

Trade4

Trade 4

QuestionAnswer
Where can you obtain energy conservation information regarding your own House? State Energy Commission
Which of these has the highest R value per inch? Polyurethane
What is the greatest limitation of polystyrene insulation? It is inflexible
What is the greatest limitation of blown in urea formaldehyde insulation? Noxious odor
When foil backed gypsum panels are installed as exterior sheathing the foil side should be facing. Foil backed gypsum wallboard panels are not used for exterior sheathing.
What general rule should be followed for nailing a drywall shear wall in a single mailing system without specification? 8 inches edge nailing and 12 inches field nailing
How many nails should be used to install a metal edge bead in a drywall job? Every 6 inches on both sides.
If you want to cut drywall in a straight line the first step is to. score the facing paper. straight line cuts are made by scoring the facing paper snapping the board core and then cutting the back paper.
The four most common building materials are wood plywood plaster and gypsum board gypsum board
What must you install before you stucco? Drywall to prevent knocking wet or uncured stucco off the wall while nailing up drywall.
Which of the following materials has been in human use for the longest time? Plaster
What is installed on an exterior wall prior to lath and plaster? tar paper
What is the usual wait between scratch and brown coats of plaster? four to five hours. The brown coat is applied as soon as soon as the scratch coat has set enough to carry the weight of both coats. in open frame wood construction the scratch coat must set forty eight hours
What should y use to make a smooth textured wall? finishing tool
Given that a slopped roof has an area of 1160 square feet how many rolls of number 15 felt are needed to cover the roof with one layer? three formula 1160 divided by 100 equal 11 point six then you divided it by four equal 2.9 round it to three
What is the purpose of a roof vent? to protect of a roof vent?
Which of the following do you use to attach asphalt composition shingles? Wide crown staples
According to the ubc what is the recommended minimum slope for a roof covered with a standard shake? 4 - 12 if the rise is 4 the run can not be greater than 12 or 4 - twelve
approximately how many inches of an asphalt shingle should be expose? five feet and one half
what is the weather exposure for 3 ply number 15 roofing? eleven and one third inches. formula a full roll is 36 inches wide but allow 2 inches for the overlap at the seems. Divide the remaining 34 inches by the number of plies so 34 divided by 3 equals 11 and one third
on a 4 ply roof how many inches should be exposed to the weather? 8-9 a full row is 36 inches wide but allow 2 inches for the overlap at the seams so 34 divided by 4 plies equal 8.5
which of the following describe parquet flooring? tile flooring. small rectangular pieces. can be arranged in various patterns all of the above.
What size nail would you use if you are installing a hardwood flooring over a concrete slab using a 3 quarter thick under lament? 7 d nail or 8 d nail
Manufactures recommend that wood flooring be delivered and stored in the structure 4 to five days before installation 4 to 5 days
which of the following must be done to finish the ceilings in a commercial kitchen and bathroom? water proof
How long of a break can you take when using cement based grout on ceramic tile? 15 minutes
How long should you wait before sealing new ceramic tile work? 2 weeks
How much flexibility is allowed per 1 inch of horizontal tolerance in the positioning of horizontal re-bar? half inch
what is the maximum amount of lead allowable for solder used on piping for potable water system. 0. 20%
Created by: osho1112
 

 



Voices

Use these flashcards to help memorize information. Look at the large card and try to recall what is on the other side. Then click the card to flip it. If you knew the answer, click the green Know box. Otherwise, click the red Don't know box.

When you've placed seven or more cards in the Don't know box, click "retry" to try those cards again.

If you've accidentally put the card in the wrong box, just click on the card to take it out of the box.

You can also use your keyboard to move the cards as follows:

If you are logged in to your account, this website will remember which cards you know and don't know so that they are in the same box the next time you log in.

When you need a break, try one of the other activities listed below the flashcards like Matching, Snowman, or Hungry Bug. Although it may feel like you're playing a game, your brain is still making more connections with the information to help you out.

To see how well you know the information, try the Quiz or Test activity.

Pass complete!
"Know" box contains:
Time elapsed:
Retries:
restart all cards