click below
click below
Normal Size Small Size show me how
Vocab F 2
Study for weak three
| Question | Answer |
|---|---|
| Bind | To secure in place |
| Continual | Without letting up |
| Exact | Accurate, very percise |
| Excavation | A hole created by digging |
| Framework | A frame or structure designed to support something |
| Level | A device used to determine if something is horizontal or vertical |
| Pier | Vertical support such as a pillar or column |
| Plumb | Perpendicular to the ground, vertical |
| Reinforce | To strengthen by adding support or material |
| Template | A model or mold that provides a pattern for making an object multiple times |