Upgrade to remove ads
Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.
PRO
Name Description Category Updated User Cards Stars
midterm boiler Unfinished 2024-06-09 jigger 46 0 edit
final test low pressure boiler Unfinished 2024-05-12 jigger 66 0 edit
midterm A midterm A Unfinished 2024-05-12 jigger 23 0 edit
midtermB midtermB Unfinished 2024-05-12 jigger 23 0 edit
finalA low pressure boiler Unfinished 2024-05-12 jigger 23 0 edit
finalB low pressure boiler Unfinished 2024-05-12 jigger 23 0 edit
finalC low pressure boiler Unfinished 2024-05-12 jigger 21 0 edit
6.1,6.2 draft system Unfinished 2024-05-21 jigger 13 0 edit
7.1,7.2,7.3 boiler water conditions Unfinished 2024-05-21 jigger 12 0 edit
8.1, taking over a shift Unfinished 2024-05-22 jigger 5 0 edit
8.2 startup and shutdown Unfinished 2024-05-22 jigger 6 0 edit
8.3 maintenance Unfinished 2024-05-22 jigger 5 0 edit
8.4 handling boiler conditions Unfinished 2024-05-22 jigger 7 0 edit
9.1 hot water heating systems Unfinished 2024-05-22 jigger 6 0 edit
9.2 hot water boiler Unfinished 2024-05-22 jigger 6 0 edit
9.3 burners and igniters Unfinished 2024-05-22 jigger 4 0 edit
9.4 hot water boiler fittings Unfinished 2024-05-22 jigger 9 0 edit
s-12 sprinkler practice test Unfinished 2024-05-29 jigger 54 0 edit
10.1 hot water boiler accessories Unfinished 2024-06-01 jigger 8 0 edit
10.2 hot water system valves Unfinished 2024-06-01 jigger 6 0 edit
10.3 piping system Unfinished 2024-06-01 jigger 6 0 edit
12.1 regulatory agencies and standards organizations Unfinished 2024-06-01 jigger 4 0 edit
12.2 boiler room safety program Unfinished 2024-06-01 jigger 8 0 edit
12.3 Personal Protective Equipment (PPE) Unfinished 2024-06-01 jigger 4 0 edit
12.4 Electrical Safety Unfinished 2024-06-01 jigger 4 0 edit
12.5 General Safety Programs Unfinished 2024-06-01 jigger 4 0 edit
final final final test Unfinished 2024-06-08 jigger 50 0 edit
last final pretest Unfinished 2024-06-21 jigger 50 0 edit
define finalll Unfinished 2024-06-13 jigger 55 0 edit
LPB Review Test final Unfinished 2024-06-19 jigger 127 0 edit
A-35 AIR COMPRESOR Unfinished 2024-07-04 jigger 159 0 edit
word s12 Citiwide Unfinished 2025-07-23 jigger 424 0 edit
heating and pumps piping Unfinished 2024-11-23 jigger 90 0 edit
heating and pumps unit 2 final Unfinished 2024-12-08 jigger 60 0 edit
final unit 2 heating and pumps Unfinished 2024-12-08 jigger 71 0 edit
new s12 s12 Unfinished 2024-12-08 jigger 42 0 edit
local 94 unit3a lesson post text mid Unfinished 2025-03-27 jigger 80 0 edit
unit 3A final local 94 Unfinished 2025-05-01 jigger 40 0 edit
l94 unit 3A final unit 3A Unfinished 2025-05-15 jigger 126 0 edit

Use checked sets