Pearl Rating System for Estidama
Quiz yourself by thinking what should be in
each of the black spaces below before clicking
on it to display the answer.
Help!
|
|
||||
---|---|---|---|---|---|
The Pearl Rating Systems comprises of how many documents? | show 🗑
|
||||
How many pearl rating stages are established? | show 🗑
|
||||
Pearl Design Rating... | show 🗑
|
||||
show | ensures that the commitments made for the Design Rating have been achieved.
🗑
|
||||
show | assesses the built-in features and operational performance of an existing building and ensures the building is operating sustainably.
🗑
|
||||
show | A minimum of two years after construction is completed and when a building has reached a minimum occupancy of 80%
🗑
|
||||
Who is a Pearl Assessor? | show 🗑
|
||||
show | A member of the design team who facilitates the Pearl Rating System for both Design and Construction stages.
🗑
|
||||
show | 1) Understand the requirements of the Pearl Building and Community Rating Systems and associated Guides;
2) Facilitate the rating process; and
3) Provide quality assurance to documents prior to submission to Estidama.
🗑
|
||||
show | There are 11 general steps excluding Pearl Operational Rating
🗑
|
||||
show | Register the development with Estidama for the relevant Pearl Rating System.
🗑
|
||||
show | Appoint a PQP to facilitate the rating process and co-ordinate the submission.
🗑
|
||||
show | Conduct workshops in compliance with the Estidama Integrated Development Process with facilitation by the PQP.
🗑
|
||||
Step DR4 (Pearl Design Ratings) | show 🗑
|
||||
show | Issue the final design credit submission to Estidama at the end of the construction documentation stage.
🗑
|
||||
show | The submission will be reviewed by a Pearl Assessor, who may request clarifications or additional information from the PQP as necessary.
🗑
|
||||
Step DR7 (Pearl Design Rating) | show 🗑
|
||||
show | Review and update credit submissions on a regular basis throughout the construction process.
🗑
|
||||
Step CR5 (Construction Rating) | show 🗑
|
||||
show | The submission will be reviewed by a Pearl Assessor, who may request clarifications or additional information from the PQP.
🗑
|
||||
Step CR7 (Construction Rating) | show 🗑
|
||||
show | Environmental, Economic, Social, and Cultural.
🗑
|
Review the information in the table. When you are ready to quiz yourself you can hide individual columns or the entire table. Then you can click on the empty cells to reveal the answer. Try to recall what will be displayed before clicking the empty cell.
To hide a column, click on the column name.
To hide the entire table, click on the "Hide All" button.
You may also shuffle the rows of the table by clicking on the "Shuffle" button.
Or sort by any of the columns using the down arrow next to any column heading.
If you know all the data on any row, you can temporarily remove it by tapping the trash can to the right of the row.
To hide a column, click on the column name.
To hide the entire table, click on the "Hide All" button.
You may also shuffle the rows of the table by clicking on the "Shuffle" button.
Or sort by any of the columns using the down arrow next to any column heading.
If you know all the data on any row, you can temporarily remove it by tapping the trash can to the right of the row.
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.
Normal Size Small Size show me how
Normal Size Small Size show me how
Created by:
rtalleh