Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password

Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.

3M

Quiz yourself by thinking what should be in each of the black spaces below before clicking on it to display the answer.
        Help!  

Question
Answer
What provide the TYCOM with the means of determining urgent repairs for scheduling IMA Availability, shipyard overhauls, or restricted availability?   show
🗑
Who is responsible for evaluating and resolving errors in the CSMP?   show
🗑
Who may request assist visits from type commanders who can recognize problems the command may be having difficulty in effectively identifying, scheduling, performing, and documenting maintenance actions?   show
🗑
The ship shall phase out coverage of equipment in concert with the what?   show
🗑
show 2  
🗑
How many weeks prior to transfer of an operational ("hot ship") to a foreign navy will the ship document all outstanding maintenance for inclusion in the CSMP?   show
🗑
What was established by congress as a board to periodically examine naval vessels and make recommendations to the secretary of the navy if any should be stricken from the Naval Vessel Register?   show
🗑
show Material inspection (MI)  
🗑
The insurv board prepares material deficiency documents to record conditions found during the inspection using what?   show
🗑
Who shall pay particular attention to ensuring that the mechanisms to ensuring that the mechanisms to identify, document and correct material deficiencies identified by ships force or others are accurately reflected within the CSMP?   show
🗑
What is "the sole source of work to be accomplished by industrial activities, FMA's, and organizational level activities" and therefore should reflect the deficient material items requiring maintenance action?   show
🗑
show K  
🗑
show G  
🗑
What enhances force readiness and helps identify material problems?   show
🗑
show Assist Visit  
🗑
show 24  
🗑
What provides correct information to allow effective planning and estimating of deferred maintenance actions?   show
🗑
show CNO  
🗑
the deficiencies and recommendations that result from a PMT inspection and monitored maintenance are published in an engineering memorandum called what?   show
🗑
show Monitoring Period  
🗑
show 10  
🗑
show (CBM) Condition Based Maintenance  
🗑
What provides both the maintenance engineering principles used to determine objective evidence of need and the methodology for determining and continuously improving applicable and effective maintenance requirements and associated maintenance assessment p   show
🗑
New or modified common assessment procedures shall be developed as what?   show
🗑
show Class Maintenance Plan  
🗑
show COMNAVSEA  
🗑
show FLEETMER  
🗑
show Class Maintenance Plan  
🗑
show (NAVSEA) Naval Sea Systems Command  
🗑
show Reliability Centered Maintenance  
🗑
show System Analyst  
🗑
During the FLEETMER, who assists system subject matter experts, including the TWH/ISEA, in the RCM analysis and performs quality assurance checks?   show
🗑
What is the Commander, Naval Sea Systems Command's lead organization tasked with continuously improving Class Maintenance Plans (CMPs) across ship enterprises?   show
🗑
show Commodity specialist (NAVSEALOGCEN Dets)  
🗑
Who provides technical expertise prior to the FLEETMER in the area of off-ship maintenance requirements?   show
🗑
Who provides technical expertise for fleet maintenance issues including Navy repair procedures and best practices?   show
🗑
What process identifies cross-enterprise high-maintenance burden systems and components and ranks them through analysis of 3-M, CASREP, Material Condition Assessment (MCA), cost, safety, Fleet/TYCOM recommendations and mission criticality data?   show
🗑
show Community of Practice  
🗑
show CFBD  
🗑
show Matrix  
🗑
What matrix will address the cost impact and benefits of the FLEETMER?   show
🗑
What meeting will be coordinated following each FLEETMER to identify strengths and weaknesses of the process?   show
🗑
show Naval Sea Logistics Center (NAVSEALOGCEN)  
🗑
show 1995  
🗑
show OARS  
🗑
show MMBU Standard Codes Forum  
🗑
What describes the format of all data records processed through the legacy Shipboard Non-Tactical ADP Program (SNAP) systems, which are found within ships' 3M?   show
🗑
show Maintenance Data Systems (MDS)  
🗑
show Naval Education Training Command (NETC)  
🗑
Who must ensure adequate 3-M program training for all personnel within the command associated with maintenance, configuration, and logistics support management?   show
🗑
What is the program manager for fleet wide 3-M training?   show
🗑
Who establishes and maintains a viable 3-M system training program to sustain that level of knowledge and awareness received during formal training?   show
🗑
What is developed to provide the maintenance task requirements information needed to plan, schedule, and control intermediate and depot-level planned maintenance effictively?   show
🗑
How many categories of CMP maintenance tasks are there?   show
🗑
show Unscheduled Tasks  
🗑
Who shall oversee the core process for CMPs in acquisition program and in-service ships?   show
🗑
show CO  
🗑
show XO  
🗑
show 3-M system coordinator  
🗑
show 9517  
🗑
Who can be assigned as the 3-M system coordinator?   show
🗑
The 3-M system coordinator ensures all routing review signatures have been applied prior to forwarding 3-M documents to the designated data processing activity within how many working days of document origination as operationally feasible?   show
🗑
Who is responsible for the final approval of the 3-M Quarterly schedule?   show
🗑
What shall be submitted requesting a LOEP change for new adds and for equipment removals?   show
🗑
show Department 3-M System Assistant  
🗑
Who will review, approve, and close out weekly schedules?   show
🗑
The DIVO shall ensure all work center weekly schedules are updated how often?   show
🗑
show DIVO  
🗑
show Work Center Sup  
🗑
What will the work center sup use as a daily working document for the scheduling of any maintenance actions not included on the PMS schedules?   show
🗑
show PMS  
🗑
show Reliability-Centered Maintenance (RCM)  
🗑
What contains information relative to PMS requirements for specific equipment for which the command is responsible?   show
🗑
Who is the PMS master file maintained by?   show
🗑
What reflects that portion of the PMS master file that contains only the planned maintenance requirements applicable to a particular work center?   show
🗑
show LOEP  
🗑
What are basic PMS reference documents?   show
🗑
How many SYSCOM MIP control numbering systems have been developed based on changing PMS philosophy and are currently in use?   show
🗑
show 7  
🗑
What delineates how frequently the maintenance requirements must be performed?   show
🗑
What symbol, following the periodicity code indicates a safety of ship item?   show
🗑
What symbol indicates that this procedure is intended to be scheduled and performed by off-ship maintenance personnel?   show
🗑
What symbol indicates that this procedure is intended to be scheduled and performed by either ships force or off-ship maintenance personnel?   show
🗑
show Mandatory related  
🗑
show Convenience Related  
🗑
All or part of the relater MRC is performed when specific conditions are present or not met on the referencing MRC is known as what type of maintenance?   show
🗑
What type of maintenance is corrective in nature, used to return system or equipment to operational condition within predetermined tolerances or limitations?   show
🗑
show Carriers  
🗑
What provide detailed procedures for performing maintenance requirements and describes who, what, how, and with what resources a specific maintenance requirement will be accomplished?   show
🗑
show Situational requirement  
🗑
What type of event is a persistent event that can be tracked over a duration of time (in days)?   show
🗑
show Trigger  
🗑
What type of event is an event that is based on the current value of a measurement in relation to the value at the time of the last accomplishment?   show
🗑
show Offset information  
🗑
What specifies the situation that must exist in order for the maintenance to be accomplished, and has no effect on scheduling?   show
🗑
What maintenance documents are those documented actions required to restore a system/ equipment to an operational condition within predetermined tolerances or limitations?   show
🗑
What is used only for General Purpose Electrical and Electronic Test Equipment (GPETE) listed in the Test, Measurement, and Diagnostic Equipment Index (TMDE-I)?   show
🗑
show SPETERL  
🗑
show Parts  
🗑
What block details the sequence of steps to be followed in performing the maintenance action?   show
🗑
What are associated with equipment safety, e.g. failure to accomplish the step could result in damage to equipment?   show
🗑
The three segment code used in cataloging MRCs is located as a footer on what side of each page of each MRC card?   show
🗑
What documents provide new or changed procedures that have not been given a final engineering validation?   show
🗑
What are authorizations for and a record of changes to an existing MIP or MRC or the addition of a new MRC?   show
🗑
What represents a new MIP and at least one new MRC?   show
🗑
What changes are authorized revisions to any aspect of existing PMS documentation and are authorized in TFBR responses?   show
🗑
Requests for changes of PMS maintenance responsibility require concurrence from whom and may require final approval by the applicable TYCOM?   show
🗑
Who is the only Person that can authorize the splitting of a MIP if an MRC requires another WC to Completely perform the MRC?   show
🗑
show 3-M coordinator  
🗑
What type of maintenance events occur when a MR requires another WC's resources to Perform that maintenance?   show
🗑
show Feedback Forms  
🗑
show Two  
🗑
What type of FBR is non-technical in nature and is intended to meet PMS needs which do not require technical review?   show
🗑
A TFBR will be considered what when the reason for submission of a PMS TFBR involves safety of personnel, ship, or potential damage to equipment and relates to the technical requirements of PMS?   show
🗑
show One Day  
🗑
show 21  
🗑
Safety related PMS updates are required to be implemented within how many working days of receipt?   show
🗑
show CSAL  
🗑
Each wc shall receive an audit once per quarter by a supervisory individual, what grade or above?   show
🗑
Who is responsible for the effective assessment of the material condition of the activity?   show
🗑
What will emphasize safety, preservation, damage control readiness, specific items of interest and will be structured to ensure rapid correction of major discrepancies that could cause injury to personnel, damage to equipment, or constitute a fire hazard?   show
🗑
All material condition discrepancies/deficiencies that require corrective maintenance, regardless of the significance, shall be entered into what?   show
🗑
What classification is given to an equipment which has been analyzed by the designated technical review activity and need for PMS requirements established?   show
🗑
What Term can be assigned to equipment only if no maintenance other then normal housekeeping actions is required to keep the equipment in good operating condition?   show
🗑
The intentional placement of a piece of equipment/system in a hibernated state for a specific duration with the intention of reactivating at the end of that duration defines what type of equipment?   show
🗑
show Deactivated  
🗑
show Department Head  
🗑
What maintenance actions prepare the equipment for periods of prolonged idleness, and are usually performed only once at the beginning of the inactive period?   show
🗑
What maintenance actions are accomplished on a recurring basis during the inactive period to prevent equipment deterioration?   show
🗑
What maintenance actions ensure that equipment is in a condition suitable for operation or to reactivate an equipment or system that has been inactivated for prolonged period?   show
🗑
Who are responsible for ensuring proper installation and operation of PMS within the ships under their command?   show
🗑
show Configuration Data Manager (CDM)  
🗑
What contains information relative to PMS requirements for Specific Equipment for which the command is responsible?   show
🗑
How many months prior to the start of overhaul (SOH) will the responsible Regional Maintenance Center (RMC) initiate a letter of request to NAVSEALOGCEN Det Norfolk/San Diego as appropriate for a PMS update package?   show
🗑
show MDS  
🗑
3-M organizational Level Maintenance provides a means to effectively manage and control organizational maintenance. it is primarily managed via the what?   show
🗑
show Naval Sea Logistics Center (NAVSEALOGCEN)  
🗑
show CMD-OA database  
🗑
The DIVO shall check the work candidate/JSN at least how often?   show
🗑
What type of maintenance action is not expected to be accomplished by ships force within the time frame prescribed by the TYCOM?   show
🗑
show OPNAV 4790/2K  
🗑
What occurs when a maintenance action alters the design or operating characteristics of the equipment?   show
🗑
What provide the management of configuration and scheduling information for each equipment requiring periodic maintenance or calibration?   show
🗑
What is a process that provides the capability for data collection on unique data elements, related to specific equipment, that are in addition to the standard work candidate (2-kilo) submission?   show
🗑
show SEI  
🗑
show 3  
🗑
show SYSCOMs  
🗑
show Daily  
🗑
What does a periodicity code of 2D mean?   show
🗑
What does a periodicity code of W mean?   show
🗑
What does a periodicity code of 2W mean?   show
🗑
What does a periodicity code of M mean?   show
🗑
show Quarterly  
🗑
What does a periodicity code of S mean?   show
🗑
show Every 9th month  
🗑
show Annually  
🗑
What does a non calendar periodicity code of R mean?   show
🗑
What does a non calendar periodicity code of U mean?   show
🗑
What does an inactive equipment maintenance code of LU mean?   show
🗑
What does an inactive equipment maintenance code of PM mean?   show
🗑
What does an inactive equipment maintenance code of SU mean?   show
🗑
What does an inactive equipment maintenance code of OT mean?   show
🗑
What does an asterisk (*) indicate?   show
🗑
What does a dash ( - ) indicate?   show
🗑
show MIP additions distributed by special issue and not as part of the FR.  
🗑
show January - September  
🗑
What are the letters A - C used for in SYSCOM MIP control numbers?   show
🗑


   

Review the information in the table. When you are ready to quiz yourself you can hide individual columns or the entire table. Then you can click on the empty cells to reveal the answer. Try to recall what will be displayed before clicking the empty cell.
 
To hide a column, click on the column name.
 
To hide the entire table, click on the "Hide All" button.
 
You may also shuffle the rows of the table by clicking on the "Shuffle" button.
 
Or sort by any of the columns using the down arrow next to any column heading.
If you know all the data on any row, you can temporarily remove it by tapping the trash can to the right of the row.

 
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how
Created by: depalma