| Question | Answer |
| A status for WBS element that processes in Logistic and Finance.
Group of answer choices
Released
Unlocked
Fully Invoiced
Closed | Closed |
| A status for WBS element that entry of effective cost possible.
Group of answer choices
Fully Invoiced
Unlocked
Closed
Released | Released |
| Relationships describe the chronological sequence in a network plan order standard network. There can be dependencies of a technical or logical nature?
Group of answer choices
True
False | True |
| Can be structured in phases, functions and objects like conceptual design, overall planning or permissions?
Group of answer choices
True
False | True |
| In Project Builder, all data is prepared using one transaction?
Group of answer choices
True
False | True |
| The Hierarchy Graphic forms the basis for planning Payment?
Group of answer choices
True
False | True |
| Scheduling of projects is based on networks.
Group of answer choices
Project Builder
WBS Elements
Hierarchy Graphics
Activities | Project Builder |
| The WBS-Element either describes a specific tasks or subtasks that can be further broken down in to work packages?
Group of answer choices
True
False | True |
| Relationships describe the chronological sequence in a network plan order standard network. There can be dependencies of a technical or logical nature?
Group of answer choices
True
False | True // |
| PS inherits it organization structures via assignment into organizational units in the enterprise structure?
Group of answer choices
True
False | True |
| Starting at the end of one series going to the end of another series.
Group of answer choices
End Series
Bounding Series
Normal Series | End Series |
| In multi-level settlement, you settle individual objects in the project to the lower-level WBS element first?
Group of answer choices
True
False - higher | False - higher |
| Milestones are created in the Project Builder for Single Elements?
Group of answer choices
True
False | True |
| The information system is used to evaluate key performance indicators within a project.
Group of answer choices
Project Planning
Project Execution
Information Systems | Information Systems |
| Period Closing
In general, onetime per period executed in background.
Group of answer choices
Period Closing
Project Execution
Project Planning
Information Systems | Period Closing |
| With the execution of planning, revenues and costs for items that were planned using Easy Cost Planning are entered?
Group of answer choices
True
False | False -services, liabilities |
| Easy Cost Standards enables cost planning based on amounts and characteristics. It is executed on the level of project closure?
Group of answer choices
True
False | False |
| With the execution of services, liabilities and costs for items that were planned using Easy Cost Planning are entered.
Group of answer choices
Period Closing
Project Execution
Project Planning
Information Systems | Project Planning |
| All project planning activities will be carried out using the single transaction CJ20N -Project Builder as one of the innovations in S/4 HANA?
Group of answer choices
True
False | True * |
| Milestones are used to mark transitions between different phases or departments?
Group of answer choices
True
False | True |
| An overview over performance, schedule and costs.
Group of answer choices
Project Execution
Project Planning
Information Systems
Period Closing | Information Systems |
| Within plant maintenance BOMs are used if there are similar objects that can be maintained.
Group of answer choices
Functional Location Advantages
Vendor Advantages
Equipment Advantages
Bill of Materials Advantages | Bill of Materials Advantages |
| Data gathering for extended periods of time.
Group of answer choices
Functional Location Advantages
Bill of Materials Advantages
Equipment Advantages
Vendor Advantages | Functional Location Advantages |
| Plant in which the technical objects of a company are installed.
Group of answer choices
Maintenance Plant Oriented organizational unit
Maintenance Plant
Planning Plant Oriented Organizational Unit
Maintenance Planning Plan | Maintenance Plant |
| It contains all information about the functional location.
Group of answer choices
Equipment Master Data
Bill of Material Master Data
Vendor Master Data
Functional Location Master Data | Functional Location Master Data |
| Object oriented cost monitoring.
Group of answer choices
Bill of Materials Advantages
Vendor Advantages
Functional Location Advantages
Equipment Advantages | Equipment Advantages // |
| Functional Location Bill of Materials contains about the equipment information on functional locations?
Group of answer choices
True
False | False |
| Complete formally structured list of all components.
Group of answer choices
Vendor Master Data
Functional Location Master Data
Bill of Material Master Data
Equipment Master Data | Bill of Material Master Data |
| Service parts planning in maintenance orders and maintenance task lists
d.
Group of answer choices
Vendor Advantages
Bill of Materials Advantages
Functional Location Advantages
Equipment Advantages | Bill of Materials Advantages // |
| It could be required in order to perform maintenance activities.
Group of answer choices
Vendor Master Data
Bill of Material Master Data
Functional Location Master Data
Equipment Master Data | Functional Location Master Data |
| Example of Functional is production of bicycle frames?
Group of answer choices
True
False | True |
| Order creation and order planning is normally triggered from a notification.
Group of answer choices
Maintenance Order Control Function
Implementation & Completion
Notification
Planning | Planning// |
| Customer billing can be performed before unsuccessful technical completion?
Group of answer choices
True
False | False - after |
| Production resources like protective clothing and specialist tooling can be listed in Notification?
Group of answer choices
True
False | False - notification |
| Planned costs are calculated based on internal activity rates and external service costs?
Group of answer choices
True
False | True |
| Order release is carried out once planning has been completed?
Group of answer choices
True
False | True |
| Maintenance orders can be created from maintenance plans, notifications or created without any reference document.
Group of answer choices
Notification
Planning
Maintenance Order Control Function
Implementation & Completion | Planning |
| They may or may not contain technical information in Planning?
Group of answer choices
True
False | False - notification |
| Planned and unplanned material withdrawals (goods issue) are possible?
Group of answer choices
True
False | True // |
| Notifications are used to tell maintenance that something needs fixing?
Group of answer choices
True
False | True |
| Planning are used to tell maintenance that something needs fixing?
Group of answer choices
True
False | False - notifications |
| The Project System module is integrated to the modules Finance and Logistics?
Group of answer choices
True
False | True |
| All of the following are project types except ____.
Group of answer choices
Business Project
Overhead costs project | Business Project |
| In Project Builder, several data is prepared using two transaction?
Group of answer choices
True
False | False - all, one |
| Possibility to create access sequences in external processing.
Group of answer choices
Project Builder
Hierarchy Graphics
WBS Elements
Activities | Hierarchy Graphics |
| This number refers to the capacity category, which is entered on the scheduling screen in the work center?
Group of answer choices
True
False | True // |
| The percentage is only used when you let the system calculate duration, work, or the number of capacities using the calculation key. If you do not enter a percentage, the system will assume 100%?
Group of answer choices
True
False | True |
| Non-Planned Services is related to activities that cannot be specified because it is not known, which individual specifications they comprise?
Group of answer choices
True
False | True |
| All of the following are milestones functions except ___.
Group of answer choices
Include standard schedule
Exclude Parts of hierarchy
Start workflow tasks
Release of activities | Exclude Parts of hierarchy |
| The graphical interface for creation and preparation of projects.
Group of answer choices
Project Planning
Information Systems
Period Closing
Project Execution | Project Planning // |
| A new graphic user interface will be used to improved Project System Gantt charts, network graphics and hierarchy graphics one of the innovations in S/4 HANA
Group of answer choices
True
False | True // |
| Project execution comprises several steps (e.g. purchase process)?
Group of answer choices
True
False | True // |
| When goods receipt of services is executed, amounts are recorded?
Group of answer choices
True
False | False - times are recorded |
| Example of Technical is pumping plant?
Group of answer choices
True
False | True |
| Planning and performing maintenance tasks.
Group of answer choices
Vendor Advantages
Bill of Materials Advantages
Functional Location Advantages
Equipment Advantages | Functional Location Advantages |
| Location (e.g. building number, coordinates).
Group of answer choices
Maintenance Planning Plan
Maintenance Plant Oriented organizational unit
Maintenance Plant
Planning Plant Oriented Organizational Unit | Maintenance Plant Oriented organizational unit |
| Functional locations can be used to sub-divide the objects into similar maintenance units.
Group of answer choices
Bill of Material Master Data
Vendor Master Data
Functional Location Master Data
Equipment Master Data | Functional Location Master Data // |
| Structures maintenance objects according to spatial, technical, and functional.
Group of answer choices
Functional Location Master Data
Bill of Material Master Data
Vendor Master Data
Equipment Master Data | Functional Location Master Data |
| It refers to Work Center.
Group of answer choices
Maintenance Planning Plan
Maintenance Plant
Planning Plant Oriented Organizational Unit
Maintenance Plant Oriented organizational unit | Planning Plant Oriented Organizational Unit // |
| There are five views of information on Equipment master data?
Group of answer choices
True
False | False - 4 |
| It contains all information around equipment.
Group of answer choices
Functional Location Master Data
Equipment Master Data
Vendor Master Data
Bill of Material Master Data | Equipment Master Data |
| Material Bill of Materials contains all about material information?
Group of answer choices
True
False | True |
| All of the following are Order completion steps except ___.
Group of answer choices
Technical completion
Time Confirmation
Technical completion confirmation
Technical Testing | Technical Testing |
| Material reservations take place order upon release?
Group of answer choices
True
False | True |
| They may or may not contain technical information in notification?
Group of answer choices
True
False | True // |
| Order creation and order planning is normally triggered from a maintenance?
Group of answer choices
True
False | False - notification |
| All of the following are contents of notification except ___.
Group of answer choices
Technical object
Reported by
Type of equipment
Location data | Type of equipment |
| They will often highlight a breakdown that needs to be actioned quickly?
Group of answer choices
True
False | True |
| Notifications can also be used to record works already carried out because a history needs to be maintained?
Group of answer choices
True
False | True |
| Planned and unplanned material withdrawals (goods issue) are possible.
Group of answer choices
Implementation & Completion
Planning
Notification
Maintenance Order Control Function | Implementation & Completion |
| There are six master data in Project Management (PS) module?
Group of answer choices
True
False | False - 5 |
| The German standard DIN 60 990 describes activities as "components of a process "?
Group of answer choices
True
False | False - 69 |
| There are three processes in Project Management (PS) module?
Group of answer choices
True
False | True |
| In Project Builder, periodically performed projects can be used to the work of modifying them?
Group of answer choices
True
False | False - regularly |
| Project system itself does not own its own organizational structure?
Group of answer choices
True
False | True |
| Deletion Flag.
Group of answer choices
Hierarchy Graphics
Activities
WBS Elements
Project Builder | WBS Elements |
| The productivity of this module is mainly inherited through the segregation of other SAP modules?
Group of answer choices
True
False | False - created not inherited |
| In Project Builder, regularly performed projects can be re-used to the work of creating them?
Group of answer choices
True
False | True |
| In the project system, they cannot be used for additional tasks and functions?
Group of answer choices
True
False | False - can |
| Using the value for work and the formula for calculating capacity requirements entered in the work center, the system determines the capacity requirements during scheduling?
Group of answer choices
True
False | True |
| You can maintain the data for work, duration, and number of capacities required manually, or, you can let the system determine it using the calculation key?
Group of answer choices
True
False | True |
| All of the following Project Planning functions except ____.
Group of answer choices
Coordinate Work
Check Capacities
Availability Check
Calculate Costs | Availability Check |
| In multi-level settlement, you settle individual objects in the project to the higher-level
WBS element first?
Group of answer choices
True
False | True |
| Cost monitoring.
Group of answer choices
Bill of Materials Advantages
Vendor Advantages
Equipment Advantages
Functional Location Advantages | Functional Location Advantages |
| Structural depiction of a technical plant
Group of answer choices
Equipment Advantages
Functional Location Advantages
Vendor Advantages
Bill of Materials Advantages | Functional Location Advantages |
| Work Center (process measures of plant maintenance).
Group of answer choices
Maintenance Plant
Planning Plant Oriented Organizational Unit
Maintenance Planning Plan
Maintenance Plant Oriented organizational unit | Maintenance Plant Oriented organizational unit |
| Maintenance Planner Group (responsible for planning and processing maintenance tasks).
Group of answer choices
Maintenance Planning Plan
Planning Plant Oriented Organizational Unit
Maintenance Plant
Maintenance Plant Oriented organizational unit | Planning Plant Oriented Organizational Unit |
| Order creation and order planning is normally triggered from a notification?
Group of answer choices
True
False | True |
| Planned costs are calculated based on internal activity rates and external service costs.
Group of answer choices
Maintenance Order Control Function
Planning
Notification
Implementation & Completion | Planning |
| Added value through increased return on investment, increased customer satisfaction and lower maintenance costs are the goal of S/4 HANA in EAM?
Group of answer choices
True
False | True |
| Malfunctions and other requirements are gathered in notifications.
Group of answer choices
Implementation & Completion
Notification
Planning
Maintenance Order Control Function | Notification |
| Control functions for maintenance orders can vary depending on the type of order.
Group of answer choices
Planning
Notification
Maintenance Order Control Function
Implementation & Completion | Maintenance Order Control Function |
| Maintenance orders provide the following functions except ___.
Group of answer choices
Availability check for spare parts
Testing Checks
Mass change or mass editing
Capacity requirements planning | Testing Checks |
| Project system itself has its own organizational structure?
Group of answer choices
True
False | False - does not |
| All of the following are characteristics of project except ___.
Group of answer choices
Unique
Complex
Low Risk
Goal Oriented | Low Risk |
| The Project System module is integrated to the modules Controlling and Quality Management?
Group of answer choices
True
False | False - Finance and Logistics // |
| Sales orders are generated automatically using the hierarchy.
Group of answer choices
Period Closing
Project Planning
Information Systems
Project Execution | Project Execution |
| Non-Planned Services is related to activities that are collected in a service master?
Group of answer choices
True
False | False - Planned |
| There are four processes in Project Management (PS) module?
Group of answer choices
True
False | False - 3 |
| A status for WBS element that further invoices ca be inhibited.
Group of answer choices
Released
Unlocked
Fully Invoiced
Closed | Fully Invoiced |
| The Hierarchy Graphic forms the basis for planning overall planning?
Group of answer choices
True
False | False |
| Regularly performed projects can be re-used to the work of creating them.
Group of answer choices
Activities
Project Builder
WBS Elements
Hierarchy Graphics | Project Builder |
| In Project Builder, Scheduling of projects is unsettled on system?
Group of answer choices
True
False | False - based on networks |
| When goods receipt of services is executed, times are recorded.
Group of answer choices
Period Closing
Project Planning
Project Execution
Information Systems | Project Execution |
| In direct Settlement, each object is settled directly to the external cost object?
Group of answer choices
True
False | True |
| Milestones are created in the Project System for multiple Elements?
Group of answer choices
True
False | False - Project Builder for Single Elements |
| The project execution comprises several steps (e.g. purchase process).
Group of answer choices
Information Systems
Project Planning
Period Closing
Project Execution | Project Execution |
| For preparation of internally processed tasks, the modified control key must be entered in the network activity?
Group of answer choices
True
False | False - externally |
| Planned Services is related to activities that are collected in a service master?
Group of answer choices
True
False | True |
| Equipment Bill of Materials contains about the equipment information on functional locations?
Group of answer choices
True
False | True |
| Verification of maintenance tasks.
Group of answer choices
Bill of Materials Advantages
Functional Location Advantages
Vendor Advantages
Equipment Advantages | Functional Location Advantages// |
| Data gathering and analysis for extended periods of time.
Group of answer choices
Equipment Advantages
Bill of Materials Advantages
Functional Location Advantages
Vendor Advantages | Equipment Advantages |
| Administration of individual objects and data.
Group of answer choices
Equipment Advantages
Vendor Advantages
Functional Location Advantages
Bill of Materials Advantages | Equipment Advantages |
| Material Bill of Materials contains about the functional locations address?
Group of answer choices
True
False | False |
| Plant in which maintenance tasks are planned and prepared.
Group of answer choices
Maintenance Planning Plan
Maintenance Plant Oriented organizational unit
Maintenance Plant
Planning Plant Oriented Organizational Unit | Maintenance Planning Plan |
| Equipment can be placed in functional locations.
Group of answer choices
Vendor Master Data
Bill of Material Master Data
Equipment Master Data
Functional Location Master Data | Equipment Master Data |
| Maintenance can also be used to record works already carried out because a history needs to be maintained?
Group of answer choices
True
False | False - Notifications |
| Planned costs are calculated based on external activity rates and internal service costs?
Group of answer choices
True
False | False - internal |
| Responsibilities for external or internal work are defined.
Group of answer choices
Maintenance Order Control Function
Planning
Implementation & Completion
Notification | Planning |
| Control functions for maintenance orders can vary depending on the type of order?
Group of answer choices
True
False | True |
| Responsibilities for external or internal work are defined in Notification?
Group of answer choices
True
False | False - Planning |
| Customer billing can be performed after successful technical completion.
Group of answer choices
Planning
Maintenance Order Control Function
Implementation & Completion
Notification | Implementation & Completion |
| All data is prepared using one transaction.
Group of answer choices
WBS Elements
Project Builder
Hierarchy Graphics | Project Builder// |
| ActivitiesPS forfeit it organization structures via discharged into organizational units in the enterprise structure?
Group of answer choices
True
False | False |
| The productivity of this module is mainly created through the integration of other SAP modules?
Group of answer choices
True
False | True // |
| From the beginning of one series to the end of another series.
Group of answer choices
Bounding Series
Start Series
Normal Series
End Series | Bounding Series // |
| With the execution of services, liabilities and costs for items that were planned using Easy Cost Planning are entered?
Group of answer choices
True
False | True// |
| In the project system, they can be used for additional tasks and functions?
Group of answer choices
True
False | True |
| For preparation of externally processed tasks, the corresponding control key must be entered in the network activity?
Group of answer choices
True
False | True |
| All of the following are Information Systems types of reports except___.
Group of answer choices
Cost-oriented
Item Purchase
Structured-Based
Summarized Reports | Item Purchase |
| Locations are normally fixed and do not move.
Group of answer choices
Vendor Master Data
Equipment Master Data
Functional Location Master Data
Bill of Material Master Data | Functional Location Master Data |
| There are three types of Bills of Materials in Enterprise Asset Management?
Group of answer choices
True
False | True |
| Hierarchically organized structure which represents e.g. a technical system, a building or a part of it.
Group of answer choices
Functional Location Master Data
Vendor Master Data
Bill of Material Master Data
Equipment Master Data | Functional Location Master Data |
| Verification of maintenance tasks.
Group of answer choices
Vendor Advantages
Functional Location Advantages
Equipment Advantages
Bill of Materials Advantages | Equipment Advantages // |
| Behavioral analysis individual areas under different conditions.
Group of answer choices
Functional Location Advantages
Equipment Advantages
Vendor Advantages
Bill of Materials Advantages | Functional Location Advantages // |
| Plant Section (responsibility for working assets).
Group of answer choices
Maintenance Plant
Maintenance Plant Oriented organizational unit
Planning Plant Oriented Organizational Unit
Maintenance Planning Plan | Maintenance Plant Oriented organizational unit // |
| Material reservations take place order upon release.
Group of answer choices
Planning
Notification
Maintenance Order Control Function
Implementation & Completion | Planning |
| Developing maintenance strategies based on reliability centered maintenance (RCM) and failure modes and effects analysis (FMEA) and asset criticality?
Group of answer choices
True
False | True |
| Maintenance orders can be created from maintenance plans, notifications or created without any reference document?
Group of answer choices
True
False | True // |
| Production resources like protective clothing and specialist tooling can be listed.
Group of answer choices
Maintenance Order Control Function
Implementation & Completion
Notification
Planning | Planning |
| Planned and unplanned material withdrawals (goods issue) are impossible?
Group of answer choices
True
False | False - possible // |
| In Project Builder, Scheduling of projects is based on networks?
Group of answer choices
True
False | True // |
| Fully Invoiced.
Group of answer choices
Hierarchy Graphics
Activities
Project Builder
WBS Elements | WBS Elements |
| The General costs activities.
Group of answer choices
Activities
Project Builder
Hierarchy Graphics
WBS Elements | Activities // |
| In direct Settlement, each object is settled indirectly to the internal cost object?
Group of answer choices
True
False | False - directly // |
| Easy Cost Planning enables cost planning based on amounts and characteristics. It is executed on the level of project structures?
Group of answer choices
True
False | True |
| Examples: pumps, personal computers, circulation fan, engines.
Group of answer choices
Bill of Material Master Data
Vendor Master Data
Equipment Master Data
Functional Location Master Data | Equipment Master Data |
| Mobile character
Group of answer choices
Equipment Master Data
Vendor Master Data
Functional Location Master Data
Bill of Material Master Data | Equipment Master Data |
| Equipment Bill of Materials contains all about material information?
Group of answer choices
True
False | True // |
| Functional Location Bill of Materials contains about the functional locations address?
Group of answer choices
True
False | False // |
| Maintenance orders can be created from maintenance plans, notifications or created with any reference document?
Group of answer choices
True
False | False - without // |
| The Hierarchy Graphic forms the basis for planning conceptual design?
Group of answer choices
True
False | False |
| It consists of access sequences and relationships.
Group of answer choices
WBS Elements
Activities
Hierarchy Graphics
Project Builder
The German stand | Hierarchy Graphics |
| The German standard DIN 69 900 describes activities as "components of a process "?
Group of answer choices
True
False | True |
| Planned Services is related to activities that cannot be specified because it is not known, which individual specifications they comprise?
Group of answer choices
True
False | False - Non-Planned |
| Project execution comprises specific steps (e.g. Posting process)?
Group of answer choices
True
False | False - purchase |
| All project structure activities will be carried out using the multiple transactions CJ20N -Project Builder as one of the innovations in S/4 HANA?
Group of answer choices
True
False | False |
| To execute billing, rules are necessary.
Group of answer choices
Information Systems
Project Planning
Project Execution
Period Closing | Period Closing |
| Structuring of objects.
Group of answer choices
Vendor Advantages
Equipment Advantages
Bill of Materials Advantages
Functional Location Advantages | Bill of Materials Advantages |
| Functional locations can contain different types of equipment.
Group of answer choices
Equipment Master Data
Bill of Material Master Data
Functional Location Master Data
Vendor Master Data | Functional Location Master Data |
| Order planning includes the following except ___.
Group of answer choices
Step to be performed
Functional Location
Any specialized tooling
Required spare parts | Functional Location |
| They may or may not contain technical information.
Group of answer choices
Planning
Notification
Maintenance Order Control Function
Implementation & Completion | Notification |
| The Hierarchy Graphic forms the basis for planning Permission?
Group of answer choices
True
False | False |
| A new graphic user interface will be used to replace Project System Gantt charts, network graphics and hierarchy graphics one of the innovations in S/4 HANA?
Group of answer choices
True
False | True |
| Sales orders are generated automatically using the hierarchy?
Group of answer choices
True
False | True |
| Material BOMs can be allocated to functional locations or equipment.
Group of answer choices
Equipment Master Data
Vendor Master Data
Functional Location Master Data
Bill of Material Master Data | Bill of Material Master Data |
| From the beginning of one series to the end of another series.
Bounding Series
Start Series
Normal Series
End Series | Start Series |