Upgrade to remove ads
Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.

JIT/LEAN - Facility Location Decisions - Part 1

Quiz yourself by thinking what should be in each of the black spaces below before clicking on it to display the answer.
        Help!  

Question
Answer
facility location decisions   1. market-related factors 2. tangible cost factors 3. qualitative factors 4. requires long-term systems view  
🗑
centroid method   1. Used for locating single facilities 2. Uses formulas to compute co-ordinates of the 2 dimensional point that meets distance and volume criteria  
🗑
centroid method for location (see slides 3,4,5,6)   1. considers existing facilities 2. the distance between them 3. volumes of goods to be shipped between them  
🗑
Just-in-Time (JIT) production systems   1.used in Toyota production facilities for several decades 2. a management philosophy that can be used throughout the enterprise  
🗑
fundamental concepts of JIT   1. elimination of waste of resources 2. respect for people **NOTES- the process by which all human intelligence is used as efficiently as possible**  
🗑
JIT is not...   1. a physical system to be implemented 2. simply an inventory control system 3. strictly a manufacturing-oriented management approach  
🗑
JIT is an enforced problem solving system with improved material flows (**NOTES - see rocks in material flow**   1. improvement of customer service (on-time deliveries, higher quality) 2. more effective use of resources (equipment, workers, inventory)through improved materials flows  
🗑
JIT vs lean   1. JIT manufacturing is the implementation of JIT principles in the production area only 2. lean manufacturing refers to the adoption of the JIT philosophy throughout the enterprise  
🗑
NUMMI - (New United Motors Manufacturing, Inc)-1987   1. landmark experiment in the history of lean production at the worst performing GM plant in Fremont,CA 2. joint venture between GM and Toyota management leading unionized US workforce 3. Could JIT production methods succeed in unionized US facility?  
🗑
NUMMI Results (slide 12 for detailed chart showing exact numbers)   GM improved in all areas on the chart 1. hours/car 2. defects/car 3. assembly space/car 4. average inventory  
🗑
waste as defined by Shoichiro Toyoda, President, Toyota (lean key)includes **NOTES**   waste is anything other than the minimum amount of equipment, materials, parts, space and workers' time, which are absolutely essential to add value to the product **NOTES - not just inventory**  
🗑
elimination of waste results in improved product design(lean key element)   1. standard product configuration 2. standardize and reduce number of parts 3. process design with product design 4. quality expectations  
🗑
design a flow process (lean key element for elimination of waste)   1. link operations closely 2. balance workstation capacities 3. often, may use cellular manufacturing  
🗑
uniform plant loading (lean key element for elimination of waste)   1. means that we maintain a stable product mix 2. we try to maintain firm short-term schedules 3. does not mean we can only produce a single product  
🗑
eliminate unnecessary ________movement and _________ movement (lean key element for elimination of waste)   material movement and worker movement  
🗑
additional lean key elements for elimination of waste   1.emphasize preventive maintenance by predictability 2. reduce setup/changeover times 3. reduce lot sizes by making products more often and reducing inventory 4. quality at the source to eliminate inspections and line-stopping  
🗑
long set up times **NOTES**   EQUAL 1. longer product runs 2. more inventory  
🗑
   
🗑
pull system of production control (SEE slide 17 for flow chart)   1.produce what is needed, when it is needed and nothing more  
🗑
JIT Material Flow **NOTES - rocks under the boat in illustration are problems preventing material flow   Examples 1.engineering changes 2.missing tools 3. machine breakdown 3.vendor relationships 5.quality 6.scrap and rework 7.long setups  
🗑
   
🗑


   

Review the information in the table. When you are ready to quiz yourself you can hide individual columns or the entire table. Then you can click on the empty cells to reveal the answer. Try to recall what will be displayed before clicking the empty cell.
 
To hide a column, click on the column name.
 
To hide the entire table, click on the "Hide All" button.
 
You may also shuffle the rows of the table by clicking on the "Shuffle" button.
 
Or sort by any of the columns using the down arrow next to any column heading.
If you know all the data on any row, you can temporarily remove it by tapping the trash can to the right of the row.

 
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how
Created by: rainesv