click below
click below
Normal Size Small Size show me how
Stack #132532
| MR Credits | MR Requirements |
|---|---|
| MR Prereq #1 | Storage and Collection of Recyclables; Recycle paper, cardboard, glass, plastic and metals; Provide on site storage area, with access |
| MR Credit #1.1 Building Reuse | Maintain 75% of existing walls, floors & roof; Window assemblies, hazardous material and non-structural roofing materials excluded. |
| MR Credit #1.2 Building Reuse | Maintain 95% of existing walls, floors & roof. |
| MR Credit #1.3 Building Reuse | Maintain 50% of Interior Non-Structural Elements |
| MR Credit #2.1 Construction Waste Management | Divert 50% from Disposal: Calculations based on weight or volume. |
| MR Credit #2.2 Waste Management | Divert 75% from Disposal; Innovation in design at 95% |
| MR Credit #3.1 Materials Reuse | 5% Cost; MEP does not count; only count permanent materials. |
| MR Credit #3.2 Materials Reuse | 10% Reuse |
| MR Credit #4.1 Recycled Content | 10% value post consumer + 1/2 pre consumer; MEP does not count |
| MR Credit #4.2 Recycled Content | 20% value |
| MR Credit #5.1 Regional Materials | 10% Extracted, Processed & Manufactured Regionally; within 500 miles; MEP does not count |
| MR Credit #5.2 Regional Materials | 20% |
| MR Credit #6 Rapidly Renewable Materials | 2.5% Cost; Bamboo, wool, cotton insulation, agrifiber, linoleum, wheatboard, strawboard and cork. |
| MR Credit #7 Certified Wood | Use a minimum of 50% of wood based products certified by FSC; Innovation in design for 95% |