Save
Upgrade to remove ads
Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.
focusNode
Didn't know it?
click below
 
Knew it?
click below
Don't Know
Remaining cards (0)
Know
0:00
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how

Stack #132151

SS CreditSS Criteria
Register Project 1. Does not guarantee certification 2. Establishes contact with USGBC 3. Allows the use of online tools and CIR submittal 4. LEED version current if followed throughout 5. Credit Interpretation Ruling will follow thru out
Submittal Process All info is submitted online 1. Online Template 2. Narrative 3. Drawings 4. Photos Calcs
CIR Steps CIR is the formal way to ask USGBC a question Step 1: Review reference manual Step 2: Review website for previous CIR's Step 3: Submit CIR online (brief text)
CIR Info 1. CIR can only address one Prereq or credit 2. Two batches of CIR's are collected each month 3. Rulings are posted within 12 business days
Appeal Process 1. Submit within 25 days of final review 2. Response within 25 business days 3. Appeal is final 4. No appeals list on website 5. No further action except to register for another certification
SS Prereq #1 Pollution Prevention Erosion Sedimentation Control Plan
SS Credit #1 Site Selection Do not develop on: 1.Prime Farmland 2.Land lower than 5' above the 100 yr flood line 3.Habitats for endangered species 4.Within 100' of wetlands 5.50' from water bodies 6.Public Parklands
SS Credit #2 Community Density and Connectivity 1. Build in existing Urban Area 2. Build on previously developed site and radius with minimum 60,000 sf per acre. Radius = 3x sqrt property area. 3. Build on previously developed site & residential area within 1/2 mile with 10 units per acre and 10 com
SS Credit #3 Brownfield Redevelopment Develop on contaminated Brownfield site
SS Credit #4.1 Alternative Transportation Locate site within 1/2 mile of rail station Located within 1/4 mile of two bus lines
SS Credit #4.2 Bike Storage/Changing Rooms Provide bike racks within 200' of the entrance for 5% occupants non residence. For 15% occupants residence. Provide shower and changing facilities for .5% FTE occupants = hours/8
SS #4.3 Low Emitting/Fuel Efficient Vehicles Provide parking for 3% FTE or 5% parking stalls; Install alternative fuel refueling stations for 3% parking
SS Credit #4.4 Parking Capacity 5% total spaces forCarpoolers; No Parking
SS Credit # 5.1 Protect and Restore Habitat On Greenfield site limit site distrubance to 40' from building; 10' from sidewalk, 15' from roadway, 25' from construction staging areas or; On previously developed sites, restore or protect 50% of the site.
SS Credit #5.2 Maximize Open Space Provide open space 25% greater than zoning requirement; or if no zoning req. provide open space equal to building footprint; or if no open space is req. provide 20% site open.
SS Credit #6.1 Quantity Control If existing impervious is less than 50%, Prevent increase of discharge drate and quantity of stormwater for 1 and 2 year 24 hour storms; or if existing imperviousness is greater than 50% decrease volume of stormwater by 25%
SS Credit #6.2 Quality Control Capture and treat 90% runoff; Remove 80% solids
SS Credit #7.1 Heat Island Non Roof 50% of hardscape must be: shaded within 5 years; Pavement with SRI at least 29; Open grid pavement system; or 50% parking underground and roof must have SRI greater than 29
SS Credit #7.2 Heat Island Effect Roof SRI of 75% roof must be 78 for low sloped roof; 29 for steep sloped roof ; or roof must be 50% vegetated; or ; install high albedo and vegetated roof surfaces combination.
SS Credit #8 Light Pollution Reduction Angle of maximum candela shall not exit thru windows; or interior lights be interlocked with occupied/unoccupied cycle; on light exterior required for safety and comfort; do not exceed 80% lighting densities for exterior and 50% for facades/landscapes
Created by: bobcaine
 

 



Voices

Use these flashcards to help memorize information. Look at the large card and try to recall what is on the other side. Then click the card to flip it. If you knew the answer, click the green Know box. Otherwise, click the red Don't know box.

When you've placed seven or more cards in the Don't know box, click "retry" to try those cards again.

If you've accidentally put the card in the wrong box, just click on the card to take it out of the box.

You can also use your keyboard to move the cards as follows:

If you are logged in to your account, this website will remember which cards you know and don't know so that they are in the same box the next time you log in.

When you need a break, try one of the other activities listed below the flashcards like Matching, Snowman, or Hungry Bug. Although it may feel like you're playing a game, your brain is still making more connections with the information to help you out.

To see how well you know the information, try the Quiz or Test activity.

Pass complete!
"Know" box contains:
Time elapsed:
Retries:
restart all cards