Questions Answers
On what are measurement and computation procedures basedOn average monthly man-hour and workload requirements
Who can initiate a manpower standard development studyThe functional area manager at either Air Force or MAJCOM level
State some reasons for conducting a manpower studymajor chgs in policy, mission, equip, tech, org, or wk environment invalidate existing standard; Performance measures sys feedbck data show the standard no longer valid; Changes in wkload volume may show the standard no longer accurately predicts reqmts
What impacts commercial activity manpower requirements once a manpower equation is developedChanges in workload, procedures, responsibilities, quality required, etc., that directly affect the PWS
What are three distinct methos for determining requirements using simulation dataThe methods are: single point application, input points to and equation, and progrmmable model
How are minimum essential work center requirements engineered and documentedIndependent of resource availablility
What are the five steps for determining skill and grade requirements withou C&R analysisDerive total man-hours for each location; Compute recommended manpower requirements for each location; Estimate required grades and skill for each location; Determine grades and skills; and Coordinate proposed grade and skill distribution
What does a study to determine manpower requirements (including skill and grade requirements) using C&R analysis allow the study team to doIt allow the study team to use data collected from measurement input locations to statistically determine the grades and skill levels using equations
When do input teams determine the man-our distribution for each process step inthe POD (direct and indirect) by AFS and skill levelDuring work measurement
How is the ditribution for each process step in the POD (direct and indirect) by AFS and skill level computedBy multiplying the total measured man-hours for each process step by the corresponding percent shown in the AFSC percent distribution matrix
During what step is a regression line (equiation) fitted to data for each AFSC when using C&R analysis to develop grade and skill requirementsData analysis and computation
When determining grade requirements, who analyzes the resulting manpower skill level distribution to set grade requirementsThe study team, jointly with the OPR
Regardless of the method used to determine the skill and grade requirements, how are the results documentedAF Form 1113, Standard manpower Table or like format approved by AFMIA
What are the categories of variancesMission, environmental, and technological
Which variance category applies to automated equipment that reduces aircraft down timeTechnological
When can a variance be submitted for approvalAll variances must be submitted within thw AFMS develpment process for approval
How do you derive manpower requirementsDivide the MAF adjusted by the appropriate overload into the total man-hour requirements from the AFMS man-hour computations
Within how many days is a new AFMS appliedWithin 90 calendar days after receipt of the implementation instructions
When do changes in population warrant reapplication of an AFMSWhen they are significant (grater than 100 authorizations)
What part of the FAC identifies a functional groupThe first and the first two digits of the FAC
The FAC preceded by "AFMS"Heading
Usually limited to five type linesMission statement
The title, definition, and source are providedWLF
Functional representative and certifying authorityOPR
Identifies the method used to develop the manpower determinantMan-hour data source
Describes those significant initiative incorporated into the standardStatement of conditions
Defines the mission support capabilities of each subordinate elementResponsibility statement
Contains the equation or model for determining manpower requirementsMan-hour equation
Used to adjust the cor manpower requirements due to unique differenceVariance
Lists each process (using POD process numbers) by priority, from highest to lowestProcess analysis summary
The appropriate designation identifying the work center(s) covered by the standardTitle
Identifies the environment in which the function operates (peacetime/wartime)Applicability
Contains all of the process or work-activity for each work center covered by the standardPOD
Included are any special instructions on how to use WLF data in the man-hour equation (if applicable)Application instructions
Cites the approprate functional and management engineering sources that supported the manpower standard and its developmentAuthority
The heart of the standard as it contains the information on how it was created and the instructions for collecting workload data and the equation or model used to determine manpower dataStandard data
When applying FEEs, from what quarter does the PEC data used representThe fourth quarter value for a given fiscal year
What type of mathemeatical equation do you use for FEEsLinear (bivariate or multivariate)
When applying functional area work center manpower standards to determine the function's total manpower requirements for development of a FEE, what is the minimum amount of months for which you collect the WLF historical dataUse 6 months of data at a minimum
What is the first step taken when constructing a mathemeatical equation for a FEEIdentify all work centers within a functional area
What do you need to apply to establish the data needed to determine the FEE adjustment factorApply both the FEE and the applicable manpower standards
What FEE percentage factors are computed for each base in a MAJCOMPercentage of total manpower requirements by PEC; Percentage of total manpower requirements by work center; and Percentage of manpower type by PEC
Who can initiate a manpower standard development studyMajor command functional area manager
You have been tasked with developing a manpower standard for an activity that remains in-house after a cost comparison study; what do you use as a basis for development of the process oriented descriptionPerformance work statement
Minimum essential work center requirements must be engineered and documented independent ofresource availability
What explains the simplified method of determining skill-level and grades when measurement involves multiple locationsAverage skill and grade estimates received from each input location
You are conducting a study that employs a measurement method that involves the use of correlation and regression to determine manpower skills and grades; during what study phase are the skill distribution percentages determined for each step in the PODStudy planning
You are conducting a study that employs a measurement method that involves the use of C&R to determine manpower skill and grades; how do you compute the fractional manpower required for each AFSC using the data shown in the AFSC man-hour matrixDivide the total man-hours for each Air Force specialty code by the man-hour availability factor multiplied by the overload factor
You are conducting a study that employs a measurement method that involves the use of C&R to determine manpower skills and grades; you plot a scattergram for each AFSC during data analysis and computation tospot any obvious incosistencies in recommended skills
In an ideal situation, what are the recommended grade percentages for the 7-skill level40% MSgt and 60% TSgt
What office/agency develops variances that apply to more than one Major Command during an Air Force manpower standard development effortAir Force Manpower Agency
What part of the manpower standard is a series of broad statements that define the mission support capabilities of each subordinate elementResponsibility statement
What part of the manpower standard contains the manpower equation you can apply to determine the work center manpower requirementsApplication instructions
You are applying a manpower standard for an overhead work center that uses the required man-hours in the subordinate work centers for a workload actor; what applies when one of the subordinate work centers doesn't have a manpower standardDetermine the man-hours using authorizations listed on the unit manpower document
What part of the manpower standard describes significant initiatives incorporated into the standardStatement of Conditions
After receipt of the implementation instructions, how many calendar days do you have to implement a new Air Force manpower Standard into the Manpower Data System90
Increased manpower costs resulting from implementation of new Air Force manpower Standard are funded byexisting command resources
When applying standards, how do we address contracted manpower equivalentsBy subtracting approved contract manpower equivalent man-hour from the man-hour total
You are using a functional estimating equation to determine manpower requirements; what manpower requirements method are you using if you calculate the total manpower requirementZero-based
What factors do you use to apply functional estimating equations like you used workload factors in manpower standardsProgram estimating
When applying functional area work center manpower standards to determine a function's total manpower requirements for development of a FEE, if available, what is the number of months you sue for the workload factor historical data record12